Please choose a project below related to this category.
Fatty acid is the generic name for an important group of organic acids, which occur in nature mostly in the form of fats, oils and waxes. Fats and oi...
|
Capacity : 3000 MT/Annum |
Plant and Machinery cost: Rs. 51 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project Rs. 238 Lakh |
|
Cost of Project : 0 |
Biogas plants have the ability to accept a wide variety of organic residues as primary fuel input. This includes Cow dung, agricultural residue, effl...
|
Capacity : 1000 KWh or 1 MWh |
Plant and Machinery cost: Rs. 485 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 1245 Lakhs |
|
Cost of Project : 0 |
Printed paper shopping bags are more popular and good in appearance. They are now going to replace the poly bags. There is lot of use of poly bags in...
|
Capacity : 10000 Nos. / day |
Plant and Machinery cost: Rs. 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 60.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Rs. 100 Lakhs |
|
Cost of Project : 0 |
Calcium propionate is a food preservative which largely used in the bread industry as mould inhibitor. It is manufactured with other food preservativ...
|
Capacity : 150 MT/Annum |
Plant and Machinery cost: Rs. 26 Lakh |
|
Working Capital : |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project Rs. 80 Lakh |
|
Cost of Project : 0 |
Copper is the most used conducting metal. There is a good market for enameled copper wire in motors and transformers industries for winding and rewin...
|
Capacity : 1 MT / day |
Plant and Machinery cost: 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 209 Lakhs |
|
Cost of Project : 0 |
It is an important structural & ornamental stone because of its higher compressive strength & durability, is extensively used for massive structural...
|
Capacity : 30000 Sq. Mtr./Annum |
Plant and Machinery cost: 196 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 78.00 |
TCI : Cost of Project 293 Lakhs |
|
Cost of Project : 29300000 |
As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power de...
|
Capacity : 7000 Nos. / Day |
Plant and Machinery cost: 5718 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 7861 Lakhs |
|
Cost of Project : 0 |
Sodium sulphate as known as salt cake, is produced commonly by Manheim Mechanical Furnace. It has circular muffle of cast iron with dome shaped top a...
|
Capacity : 220000 MT per Annum |
Plant and Machinery cost: 456 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project 1552 Lakhs |
|
Cost of Project : 0 |
Denatured spirit is the product of manufacture from ethyl alcohol or ethanol. The denatured alcohol are either completely denatured alcohol or special...
|
Capacity : 4000 Bottles / day |
Plant and Machinery cost: 114 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 2129 Lakhs |
|
Cost of Project : 0 |
Heavy liquid paraffin by virtue of its versatile use in pharmaceuticals and medical practice etc.. The paraffin hydrocarbons are usually obtained sim...
|
Capacity : 120000 KLs/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project 682 Lakhs |
|
Cost of Project : 0 |
Like marble and other natural stones, granite has been used extensively in the construction of forts, temples and other buildings. Granite is also ca...
|
Capacity : 45000 MT Granite Blocks /Annum |
Plant and Machinery cost: 477 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project 1519 Lakhs |
|
Cost of Project : 151900000 |
Stoneware pipes are used in sewerage lines. It is covered under the heading Structural Clay Product, which include the various items like building br...
|
Capacity : 12 MT/day |
Plant and Machinery cost: 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 126 Lakhs |
|
Cost of Project : 0 |