Please choose a project below related to this category.
Amla powder is largely used for the production of Ayurvedic medicine. There is good demand of the Herbal medicinal product. The dried fruits of E.ribe...
|
Capacity : 600 MT/Annum |
Plant and Machinery cost: 52 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 154 Lakhs |
|
Cost of Project : 0 |
Pure sodium hydroxide is a colourless solid. It does not occure in nature, but it is manufactured on a large scale due to easily availability of raw m...
|
Capacity : 60000 MT/Annum |
Plant and Machinery cost: 483 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 7190 Lakhs |
|
Cost of Project : 719000000 |
Cardamom oil is an essential spice oil. It has very good flavour and large end use in the pharmaceutical industry, cosmetic industry, food industries...
|
Capacity : 20 Kg/Day |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 29.00 |
TCI : 111 Lakhs |
|
Cost of Project : 0 |
Pig rearing can be paying if sufficient attention in given to the selection of good quality stock and to the proper management of herd. If pigs are fe...
|
Capacity : 1500 Pigs/Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 32 Lakhs |
|
Cost of Project : 0 |
Most lead compounds are derived from pig lead (refined metal), usually via conversion to lead monoxide, commonly known as litharge. In general, lead c...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 66.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 230 Lakhs |
|
Cost of Project : 0 |
Deep freezing of vegetable is one of the modern techniques for vegetable preservation. There are so many procedures adopted for preserving the vegetab...
|
Capacity : 1100 MT/Annum |
Plant and Machinery cost: 367 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 786 Lakhs |
|
Cost of Project : 0 |
Contract farming is most commonly practiced by food processing firms. These firms have an interest in keeping raw material inflows at a stable level,...
|
Capacity : 75000 Nos. Bottle Fruit Juice/Day |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 22.00 |
TCI : 2876 Lakhs |
|
Cost of Project : 0 |
The uses of alkali metal silicates fall into two broad categories 1. as materials from which further important industrial products can be derived. Thi...
|
Capacity : 1800 MT/Annum |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 67.00 |
TCI : 156 Lakhs |
|
Cost of Project : 0 |
Metals is general and steel particular can be worked into useful shapes by hammering or pressing. This method of metal working is known as forging. A...
|
Capacity : 90 MT/Day |
Plant and Machinery cost: 631 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 2926 Lakhs |
|
Cost of Project : 0 |
The manufacturing process of distribution transformers are quite similar to the process of power transformers. It consist of laminating cores, enamell...
|
Capacity : 1 Nos./Day |
Plant and Machinery cost: 40 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 209 Lakhs |
|
Cost of Project : 0 |
Steel shots and grits are used in both static and site blasting equipments. Materials and abrasives used for surface preparation can be hazardous if u...
|
Capacity : 30 MT/Day |
Plant and Machinery cost: 203 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 858 Lakhs |
|
Cost of Project : 0 |
The element carbon exists in three allotropic modifications, amorphous carbon, graphite and diamond, which are employed industrially. The major use of...
|
Capacity : 300 MT/Annum |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 49.00 |
TCI : 87 Lakhs |
|
Cost of Project : 0 |