• 0

Project Consultancy, Reports & Profiles

Agro and Food Processing: Project Opportunities in Uttarakhand

PROFILE:

Food processing involves any type of value addition to agricultural or horticultural produce and also includes processes such as grading, sorting and packaging which enhance shelf life of food products. The food processing industry provides vital linkages and synergies between industry and agriculture. The Food Processing Industry sector in India is one of the largest in terms of production, consumption, export and growth prospects. The government has accorded it a high priority, with a number of fiscal reliefs and incentives, to encourage commercialization and value addition to agricultural produce, for minimizing pre/post harvest wastage, generating employment and export growth. India's food processing sector covers a wide range of products fruit and vegetables; meat and poultry; milk and milk products, alcoholic beverages, fisheries, plantation, grain processing and other consumer product groups like confectionery, chocolates and cocoa products, Soya-based products, mineral water, high protein foods etc.

RESOURCES:

Uttarakhand comprises of total are 5672568 Hectares, of which forest area is 3485847 hectares. Fruits such as apples, oranges, pear, grapes peach, plum apricot, litchi, mangoes and guava are widely grown in the state and therefore have immense potential for development of horticultural crops and processing units. The State Government will assist in establishing small & medium size Agro Parks, Food Parks etc., which will provide common infrastructure facilities for storage, processing, grading and marketing, thus ensuring that surplus fruits and vegetables do not go waste as at present. Four Agri Export Zones have already been declared under the AEZ scheme of the Government of India for Litchi, Horticulture, Herbs, Medicinal Plants and Basmati Rice. Further, efforts will continue to promote production for export and provide access to domestic and export markets for products from the State.

GOVERNMENT POLICIES:

The Ministry of Food Processing Industries (MOFPI) is a ministry of the Government of India is responsible for formulation and administration of the rules and regulations and laws relating to food processing in India. The ministry was set up in the year 1988, with a view to develop a strong and vibrant food processing industry, to create increased employment in rural sector and enable farmers to reap the benefits of modern technology and to create a of surplus for exports and stimulating demand for processed food.

•        Custom duty rates have been substantially reduced on food processing plant and equipments, as well as on raw materials and intermediates, especially for export production.

•        Wide-ranging fiscal policy changes have been introduced progressively in food processing sector. Excise and Import duty rates have been reduced substantially. Many processed food items are totally exempt from excise duty.

•        Corporate taxes have been reduced and there is a shift towards market related interest rates. There are tax incentives for new manufacturing units for certain years, except for industries like beer, wine, aerated water using flavouring concentrates, confectionery, chocolates etc.

•        Indian currency, rupee, is now fully convertible on current account and convertibility on capital account with unified exchange rate mechanism is foreseen in coming years.

•        Repatriation of profits is freely permitted in many industries except for some, where there is an additional requirement of balancing the dividend payments through export earnings.

 

Biotechnology: Project Opportunities in Uttarakhand

PROFILE

The Biotechnology sector in India is one of the fastest growing sectors of the Indian Economy. As the sector is mainly based on knowledge, it is expected that it will play an important part in shaping the Indian Economy, which is developing at a rapid pace. The Indian Biotechnology sector holds immense potential in terms of research and development, skill and cost effectiveness. As per the eight annual survey by the Association of Biotechnology-led enterprise (ABLE) and a monthly journal, Bio-Spectrum, the sector grew threefold in five years and reported a revenue of US$ 3 billion during 2009-2011 with a 17 per cent rise as compared to the previous year.

RESOURCES

Uttarakhand is an ideal destination to invest in biotechnology-based industries because of several inherent advantages and being host to vast diversity of flora and fauna and rare species of plants and animals. A high-level biotechnology board is being setup to pursue initiatives in the field of research. The state will accord the units coming under this sector with the industry status and aims to establish an internationally competitive business infrastructure and environment for the industry in the state. Further, a biotechnology park is to be developed that will integrate resources and provide a focused institutional set up for accelerated commercial growth of bio-technology and bio-informatics. The Government is also in the process of creating an Exchange for Medicinal and Aromatic Plants to serve as a common platform for research institutions, technology developers and producers.

GOVERNMENT POLICIES:

The Uttarakhand Board of Biotechnology (UBB) will help the R&D Institutions of the State to seek funds from the national and international funding agencies / donors to upgrade the infrastructure facilities. Depending upon the need, UBB and the State Government will also try to fund R&D facilities through its own resources. The State Government undertakes to provide the following facilities/terms to the companies desirous of establishing BT units in the State:

•        BT Units including related R&D Units will enjoy the status of industry and will be eligible for incentives and concessions as provided for the relevant category/class of industry in the Industrial Policy of the State. For this purpose they shall be treated as Priority Sector Industry. Department of Biotechnology will provide The State Government undertakes to provide the following facilities/terms to the companies “single-window clearance” and shall issue only one application form to set up BT Units in the State.

•        The Government proposes to establish in association with private sector a BT Park initially at Halide, Pantnagar where land/plots would be made available to prospective entrepreneurs on favourable terms. The latter, however, are also free to choose their own sites or locate the same in the other established Industrial Areas in the State.

Hydropower: Project Opportunities in Uttarakhand

PROFILES:

Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. India was the 7th largest producer of hydroelectric power in 2008 after Norway: 114 TWh and 3.5 % the world total in 2008. The potential for hydroelectric power in India is one of the greatest in the world. Small hydropower offers a wide range of benefits-especially for rural areas and developing countries. The resource is environmentally responsible and has substantial economic advantages. Efforts also being made to improve the exchange of ideas and technology related to small hydropower. In India, small hydropower up to capacity of 25 MW also includes the mini-and-micro hydropower projects which are usually confined strictly to local use. A potential of over 15,000 MW has been identified from small hydropower and Government of India has been according top priority to SHP development as thrust area.

RESOURCES:

Uttarakhand has a large network of rivers and canals which provides an immense scope for hydro-power energy. In India, the development of Micro, Mini, and Small Hydro Power Projects started in the year 1897. One of the first hydro-power stations in India was commissioned at Galogi in 1907. More power stations were subsequently developed over a period of time. In Uttarakhand, the estimated capacity of Small hydro power projects is about 1500 MW out of total estimated capacity of 20,363 MW Uttaranchal has a hydropower potential of the order of 20236 MW against which only about 1407 MW has been harnessed so far.

GOVERNMENT POLICIES:

The Government of Uttaranchal (GoU) has decided to encourage generation of power through small hydropower sources of energy, and has framed a policy so that the development of this sector serves as an engine to achieve the objective of promoting the all-round development of the region. To encourage generation of hydropower the government of Uttarakhand has formulated and implemented policies with following objectives:

•        Creation of conducive conditions for encouraging private sector participation

•        Harnessing water resources in an environment friendly manner

•        Meeting the energy demand of the state/country

•        Promotion of the overall development of the region

•        Generation of revenue from hydro resources

 

Mineral: Project Opportunities in Uttarakhand

PROFILES:

A mineral is a naturally occurring solid chemical substance formed through biogeochemical processes, having characteristic chemical composition, highly ordered atomic structure, and specific physical properties. India is endowed with significant mineral resources. India produces 89 minerals out of which 4 are fuel minerals, 11 metallic, 52 non-metallic and 22 minor minerals.

RESOURCES:

Mineral resources of Uttarakhand play a significant role in the economy of Uttarakhand. The Chamoli district of Uttarakhand is especially famous for housing a number of mineral resources in Uttarakhand. The northern division of the district consist entirely of medium to high grade metamorphic rocks, which also contains bands of volcanic rocks in some areas; the southern division contains sedimentary and low-grade metamorphic rocks, with bands of volcanic rocks in some regions. Although much is not known about the geology of the first division of Chamoli, yet the mineral resources contain rocks such as quartzite, marble, and various types of schist and gneiss. The southern division contains rocks such as gneiss, limestone, phyllites, quartzite, sericite-biotite schist and slate.

Some of the important minerals that form a major part of the mineral resources of Uttarakhand are: Asbestos, Magnestic, Soapstone or Steatite, Copper, Iron, Graphite, Gold, Gypsum, Lead, Slate, Limestone, Building Stone, Sulfur, and Bitumen. Beside these major mineral resources, some of the other mineral resources of Uttarakhand also play a major role in enhancing the economy of Uttarakhand. Some of those mineral resources are: Antimony, Arsenic, Lignite or Brown Marble, Mica, Silver, etc.

GOVERNMENT POLICIES:

NATIONAL MINERAL POLICY, 2008

Keeping in view the long term national goals and perspective for exploitation of minerals, Government of India has revised its earlier National Mineral Policy, 1993 and came up with a new National Mineral Policy 2008. Basic goals of NMP 2008 are-

1.       Regional and detailed exploration using state of the art techniques in time bound manner.

2.       Zero waste mining

For achieving the above goals, important changes envisaged are:

•        Creation of improved regulatory environment to make it more conducive to investment and technology flows

•        Transparency in allocation of concessions

•        Preference for value addition

•        Development of proper inventory of resources and reserves

•        Enforcement of mining plans for adoption of proper mining methods and   optimum utilization of minerals 

•        Data filing requirements will be rigorously monitored

•        Old disused mining sites will be used for plantation or for other useful purposes.

•        Mining infrastructure will be upgraded through PPP initiatives

•        State PSU involved in mining sector will be modernized

•        State Directorate will be strengthened to enable it to regulate   mining in a proper way and to check illegal mining

•        There will be arms length distance between State agencies that mine  and those that regulate

•        Productivity and economics of mining operation, safety and health of workers and others will be encouraged.

Tourism: Project Opportunities in Uttarakhand

PROFILE:

Tourism in India is the largest service industry, with a contribution of 6.23% to the national GDP and 8.78% of the total employment in India. The tourism industry in India is substantial and vibrant, and the country is fast becoming a major global destination. India’s travel and tourism industry is one of them most profitable industries in the country, and also credited with contributing a substantial amount of foreign exchange. Indian Tourism offers a potpourri of different cultures, traditions, festivals, and places of interest.

RESOURCES:

Uttarakhand - the land of gods, the home of Himalayas and truly a paradise on earth, allures everyone from everywhere. Uttarakhand is paradise for different types of adventure activities. Like River Rafting, Trekking, Skiing, Camping, Rock Climbing, Rappelling, River Crossing. Mountaineering, Paragliding and Hot Ballooning make Uttarakhand one of the most attractive destinations for adventure sports not only in the India but the world. Gangotri and Yamunotri, the sources of both the Ganges and Yamuna fall in the upper reaches of the state and together with Badrinath (dedicated to Vishnu) and Kedarnath (dedicated to Shiva) form the Char Dham, one of Hinduism's most spiritual and auspicious pilgrimage circuits. Haridwar, meaning "Gateway to God" is a prime Hindu destination. Haridwar hosts the Kumbha Mela every twelve years, in which millions of pilgrims take part from all parts of the India and the world. Rishikesh near Haridwar is known as the preeminent yoga centre of India. The state has an abundance of temples and shrines, many dedicated to local deities or manifestations of Shiva and Durga, references to many of which can be found in Hindu scriptures and legends.

GOVERNMENT POLICIES:

In order to develop tourism in India in a systematic manner, position it as a major engine of economic growth and to harness its direct and multiplier effects for employment and poverty eradication in an environmentally sustainable manner, the National Tourism Policy was formulated in the year 2002. Broadly, the Policy attempts to:-

•        Position tourism as a major engine of economic growth;

•        Harness the direct and multiplier effects of tourism for employment generation, economic development and providing impetus to rural tourism;

•        Focus on domestic tourism as a major driver of tourism growth.

•        Position India as a global brand to take advantage of the burgeoning global travel trade and the vast untapped potential of India as a destination;

•        Acknowledges the critical role of private sector with government working as a pro-active facilitator and catalyst;

•        Create and develop integrated tourism circuits based on India’s unique civilization, heritage, and culture in partnership with States, private sector and other agencies; and ensure that the tourist to India gets physically invigorated, mentally rejuvenated, culturally enriched, spiritually elevated and feel India from within.

 

Waste management and recycling: Project Opportunities in Uttarakhand

PROFILE:

Rapid industrialization last few decades have led to the depletion of pollution of precious natural resources in India depletes and pollutes resources continuously. Further the rapid industrial developments have, also, led to the generation of huge quantities of hazardous wastes, which have further aggravated the environmental problems in the country by depleting and polluting natural resources. Therefore, rational and sustainable utilization of natural resources and its protection from toxic releases is vital for sustainable socio-economic development.

Hazardous waste management is a new concept for most of the Asian countries including India. The lack of technical and financial resources and the regulatory control for the management of hazardous wastes in the past had led to the unscientific disposal of hazardous wastes in India, which posed serious risks to human, animal and plant life.

RESOURCES:

Investments are aimed at improving public health and the environmental quality in the Program towns and the adjacent open land and water bodies by increasing solid waste collection coverage from 50% to 72% and supporting sound solid waste disposal methods. Improvements will be directed at (i) segregation of solid waste at household level and handling and management improvements at wards and town levels with an emphasis on waste minimization, (ii) provision of solid waste collection and transportation equipment, and (iii) construction of sanitary landfills in accordance with GoI’s Municipal Solid Waste Management and Handling Rules 2000. These will develop into a State wide SWM strategy, action plan, and town wise SWM master plan reports supported by capacity building of ULBs in SWM.

GOVERNMENT POLICIES:

National policy on waste management is set out in the October 1998 policy statement on waste management- Changing our ways. It outlines the Government's policy objectives in relation to waste management, and suggests some key issues and considerations that must be addressed to achieve these objectives. The policy is firmly grounded in an internationally recognised hierarchy of options, namely prevention, minimisation, reuse/recycling, and the environmentally sustainable disposal of waste which cannot be prevented or recovered.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Shrimp Farming (E O U )
Shrimp Farming (E O U )

Shrimps are swimming, decapod crustaceans classified in the infra order Caridea, found widely around the world in both fresh and salt water. Shrimp... Read More

Capacity :
Shrimp: 1.4 MT/Day
Plant and Machinery cost:
895.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
40.00 %
TCI :
3409.00 Lakhs
Cost of Project :
3409.00Lakhs
Add To Inquiry Basket
Superoxide Dismutase (SOD)
Superoxide Dismutase (SOD)

Superoxide dismutases (SOD, EC 1.15.1.1) are enzymes that alternately catalyze the dismutation (or partitioning) of the superoxide (O2?) radical in... Read More

Capacity :
Superoxide Dismutase: 50 Kgs/Day
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
46.00 %
TCI :
616.00 Lakhs
Cost of Project :
616.00Lakhs
Add To Inquiry Basket
PU & PVC Leather Cloth
PU & PVC Leather Cloth

Artificial leather is a fabric or finish intended to substitute for leather in fields such as upholstery, clothing, and fabrics, and other uses whe... Read More

Capacity :
PU Leather Cloth:25000 Mtrs/Day,PVC Leather Cloth: 25000 Mtrs/Day
Plant and Machinery cost:
1338.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
43.00 %
TCI :
2780.00 Lakhs
Cost of Project :
2780.00Lakhs
Add To Inquiry Basket
Controlled Atmosphere Cold Storage
Controlled Atmosphere Cold Storage

Controlled atmosphere (CA) storage i... Read More

Capacity :
Seasonal Commodity:11 MT/Day,Cold Storage (Rental):44 MT/Day
Plant and Machinery cost:
365.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
19.00%
Break Even Point (BEP):
45.00 %
TCI :
1022.00 Lakhs
Cost of Project :
1022.00Lakhs
Add To Inquiry Basket
Precipitated Silica from Rice Husk Ash
Precipitated Silica from Rice Husk Ash

Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated ... Read More

Capacity :
Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day
Plant and Machinery cost:
437.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
55.00 %
TCI :
660.00 Lakhs
Cost of Project :
660.00Lakhs
Add To Inquiry Basket
TMT Bar
TMT Bar

Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic mat... Read More

Capacity :
TMT Bar: 125 MT/Day • Scraps: 6MT/Day
Plant and Machinery cost:
730.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
1675.00 Lakhs
Cost of Project :
1675.00Lakhs
Add To Inquiry Basket
Automobile Tyres for Trucks, Buses and Lorries
Automobile Tyres for Trucks, Buses and Lorries

The tyre and tubes are very important rubber products and widely used everywhere in the world. The statistical production figure available from 193... Read More

Capacity :
480000 Nos./Annum
Plant and Machinery cost:
221.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
48.00 %
TCI :
1183.00 Lakhs
Cost of Project :
1183.00Lakhs
Add To Inquiry Basket
Egg Powder
Egg Powder

Egg is one of the most versatile and... Read More

Capacity :
717900 Kgs /Annum,Egg Powder: 690000 Kgs /Annum,Egg Shell Powder (bye Product): 27900 Kgs /Annum
Plant and Machinery cost:
804.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
43.00 %
TCI :
1118.00 Lakhs
Cost of Project :
1118.00Lakhs
Add To Inquiry Basket
Packaging of Tomato Paste
Packaging of Tomato Paste

Tomatoes are the most popular vegetable in the home garden. Tomatoes are widely grown in all parts of the world. They are available in a variety of... Read More

Capacity :
225 Lakh Pouches/Annum
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
308.00 Lakhs
Cost of Project :
308.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile.Technical textiles are defi... Read More

Capacity :
1296 Lakh Nos. /Annum
Plant and Machinery cost:
103.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
36.00 %
TCI :
980.00 Lakhs
Cost of Project :
980.00Lakhs
Add To Inquiry Basket
Aluminium Conductors (AAAC and ACSR)
Aluminium Conductors (AAAC and ACSR)

A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conduc... Read More

Capacity :
All Aluminium Alloy Conductor: 3000 MT per annum,Aluminium Conductor Steel Reinforced: 3000 MT per a
Plant and Machinery cost:
284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
731.00 Lakhs
Cost of Project :
731.00Lakhs
Add To Inquiry Basket
LPG Cylinders
LPG Cylinders

Liquefied petroleum gas (LPG) is a term describing a group of hydrocarbon-based gases derived from crude oil and or natural gas. Natural gas purifi... Read More

Capacity :
L.P.G. Cylinders (14.2 Kgs Size): 180 Nos./Day, L.P.G. Cylinders (19 Kgs Size): 180 Nos./Day
Plant and Machinery cost:
310.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
56.00 %
TCI :
547.00 Lakhs
Cost of Project :
547.00Lakhs
Add To Inquiry Basket
Rice Cultivation
Rice Cultivation

Rice is the leading food crop in the developing world in terms of total world production. It represents the staple food for almost two-thirds of th... Read More

Capacity :
Rice Paddy: 72500 MT/ Annum•Rice Straw as by product: 145000 MT/ Annum
Plant and Machinery cost:
1741.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
9.00%
Break Even Point (BEP):
10.00 %
TCI :
4418.00 Lakhs
Cost of Project :
4418.00Lakhs
Add To Inquiry Basket
Sodium Silicate from Rice Husk  Hull
Sodium Silicate from Rice Husk Hull

Sodium Silicate from Rice Husk/Hull

Read More

Capacity :
6000 MT/ Annum
Plant and Machinery cost:
144.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
374.00 Lakhs
Cost of Project :
374.00Lakhs
Add To Inquiry Basket
Rice Flakes from Broken Rice (used in Beer Industry)
Rice Flakes from Broken Rice (used in Beer Industry)

Rice flakes are tasty flakes that are created using rice grains. The process for creating rice flakes involves parboiling the rice, then flattening... Read More

Capacity :
20 MT/day
Plant and Machinery cost:
194.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
459.00 Lakhs
Cost of Project :
459.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Particle Board (Wood Base)
Start Manufacturing of Particle Board (Wood Base)

Particle board, also known ... Read More

Capacity :
Particle Board (Wood Based) 3,600 Nos Per Day
Plant and Machinery cost:
1630.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3137.00Lakhs
Add To Inquiry Basket
Invest In Potato Starch & Flakes Industry
Invest In Potato Starch & Flakes Industry

Potato starch is extracted throug... Read More

Capacity :
Potato Starch: 7,000 Kgs Per Day Potato Flakes: 5,000 Kgs Per Day
Plant and Machinery cost:
203.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
877.00Lakhs
Add To Inquiry Basket
Setup Plant of Super Absorbent Polymer (SAP)
Setup Plant of Super Absorbent Polymer (SAP)

A superabsorbent polymer (SAP) is a type of polymer that has the ability to absorb an... Read More

Capacity :
Super Absorbent Polymer 8,000 MT Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2100.00Lakhs
Add To Inquiry Basket
Setup Business of Nano Resin Modified Bulk Composite for Dental Application
Setup Business of Nano Resin Modified Bulk Composite for Dental Application

 

Nano Resin Modifi... Read More

Capacity :
Nano Resin Modified Bulk Composite 2,000 Pcs Per Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
96.00Lakhs
Add To Inquiry Basket
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

 

Glass Fiber Reinforced Polymer (GFRP) rebar is an innovative construction material, engineered by embedding ... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm) 6 MT Per Day
Plant and Machinery cost:
211.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
549.00Lakhs
Add To Inquiry Basket
A Business Plan for Urea from Natural Gas
A Business Plan for Urea from Natural Gas

 

Capacity :
Urea Fertilizer 100 MT Per Day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
3300.00Lakhs
Add To Inquiry Basket
Start Production of Ferrotitanium Using Induction Furnace
Start Production of Ferrotitanium Using Induction Furnace

Ferrotitanium using induction furnace is a specialized process that involves the melting a... Read More

Capacity :
Ferrotitanium 70 2,500,000 Kgs Per Annum Ferrotitanium 40 2,500,000 Kgs Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
35.00 %
TCI :
0.00 Lakhs
Cost of Project :
1600.00Lakhs
Add To Inquiry Basket
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk

Biodegradable and edible tableware products represent a remarkable fusion of innovati... Read More

Capacity :
Biodegradable and Edibile Tableware Products (Plate, Bowl & Cups) 72,000 Pcs Per Day
Plant and Machinery cost:
341.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
583.00Lakhs
Add To Inquiry Basket
Start Business of Sorbitol
Start Business of Sorbitol

Sorbitol is a type of sugar alcohol that is widely used as a sweetener in various foo... Read More

Capacity :
Sorbitol 6 MT Per Day
Plant and Machinery cost:
431.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
790.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Silicate from Silica and Soda Ash
A Business Plan For Sodium Silicate from Silica and Soda Ash

Sodium silicate, commonly known as water glass, is a versatile compound with applications acros... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
808.00Lakhs
Add To Inquiry Basket
Compressed Bio Gas (CBG) using Napier Grass Manufacturing
Compressed Bio Gas (CBG) using Napier Grass Manufacturing

Introduction

The availability of... Read More

Capacity :
5 MT Per Day
Plant and Machinery cost:
710.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1644.00Lakhs
Add To Inquiry Basket
Soda Ash Manufacturing through Solvay Process: An Optimal Business Idea for Startups
Soda Ash Manufacturing through Solvay Process: An Optimal Business Idea for Startups

Sodium carbonate is scientifically referred to as soda ash. This ingredient is vital for many sector... Read More

Capacity :
Soda Ash (Na2CO3): 1333 MT Per Day Ammonium Chloride (NH4Cl): 1333 MT Per Day
Plant and Machinery cost:
27700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
36700.00Lakhs
Add To Inquiry Basket
Unveiling Opportunities in Nicotine Powder from Tobacco Leaves Manufacturing
Unveiling Opportunities in Nicotine Powder from Tobacco Leaves Manufacturing

Introduction to Nicotine Powder Manufacturing

Read More

Capacity :
Nicotine Powder: 400 Kg Per Day Spent Tobacco Leaves (by-product): 13,000 Kg Per Day
Plant and Machinery cost:
900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2033.00Lakhs
Add To Inquiry Basket
Printed Circuit Boards Manufacturing: A Golden Opportunity for Startups
Printed Circuit Boards Manufacturing: A Golden Opportunity for Startups

 

Electrical devices of all types use Printed Circuit Boards (PCBs) as their central co... Read More

Capacity :
400 Pcs. Per Day
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
104.00Lakhs
Add To Inquiry Basket
Compressed Bio Gas (CBG) Plant from Agricultural Waste, Animal Manure, and Sewage Sludge A Lucrative Opportunity for Startups
Compressed Bio Gas (CBG) Plant from Agricultural Waste, Animal Manure, and Sewage Sludge A Lucrative Opportunity for Startups

 

The alternative energy source known as Compressed Bio Gas (CBG) shows great potential... Read More

Capacity :
Compressed Bio Gas: 7.2 MT Per Day By Product Liquid Fertilizer: 90 MT Per Day By Product Dry Sol
Plant and Machinery cost:
519.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1400.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags from Corn Starch Granules Manufacturing: A Sustainable Business Opportunity for Startups
Biodegradable Plastic Bags from Corn Starch Granules Manufacturing: A Sustainable Business Opportunity for Startups

 

Read More

Capacity :
Biodegradable Plastic Bags (Per Bag 25 gms Size): 2 MT Per Day
Plant and Machinery cost:
430.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1180.00Lakhs
Add To Inquiry Basket
Soda Ash & Calcium Chloride (By-Product) Manufacturing: A Promising Business Venture for Startups
Soda Ash & Calcium Chloride (By-Product) Manufacturing: A Promising Business Venture for Startups

 

Read More

Capacity :
Soda Ash (Na2CO3) – Powder 1333 MT Per Day By Product Calcium Chloride (CaCI2) – Flakes 1396 MT
Plant and Machinery cost:
118500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
140300.00Lakhs
Add To Inquiry Basket
Viscose Filament Yarn Spinning by Spool Process: A Promising Business Opportunity for Startups and Entrepreneurs
Viscose Filament Yarn Spinning by Spool Process: A Promising Business Opportunity for Startups and Entrepreneurs

 

Read More

Capacity :
Viscose Filament Yarn - 30D: 2 MT Per Day Viscose Filament Yarn - 40D: 2 MT Per Day Viscose Filame
Plant and Machinery cost:
27900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
46500.00Lakhs
Add To Inquiry Basket
Cashew Nut Processing with Flavoured Cashew: A Lucrative Business Opportunity for Entrepreneurs
Cashew Nut Processing with Flavoured Cashew: A Lucrative Business Opportunity for Entrepreneurs

 

Read More

Capacity :
White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut 200 Kgs
Plant and Machinery cost:
77.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
198.00Lakhs
Add To Inquiry Basket
Medical Disposables (Gowns & Drapes) Manufacturing Business
Medical Disposables (Gowns & Drapes) Manufacturing Business

Rapid advancements in medical technology and hygiene standards have driven demand for medical disposables such as... Read More

Capacity :
Medical Gowns: 1,000 Pcs Per Day Medical Drapes (Customarized): 1,000 Pcs Per Day HIP U Dr
Plant and Machinery cost:
388.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
632.00Lakhs
Add To Inquiry Basket
Viscose Filament Yarn Spinning by Centrifugal Process
Viscose Filament Yarn Spinning by Centrifugal Process

Viscose filament yarn (VFY) is an important raw material for many textile applications such as weaving, embroider... Read More

Capacity :
Viscose Filament Yarn - 30D: 2 MT Per Day Viscose Filament Yarn - 40D: 2 MT Per Day Viscos
Plant and Machinery cost:
27800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
46300.00Lakhs
Add To Inquiry Basket
Production of Toughened Glass (Toughened Safety Glass)
Production of Toughened Glass (Toughened Safety Glass)

Toughening may be a process where the glass is heated at high temperatures to f... Read More

Capacity :
Toughened Glass (Size of Sheet 8 ft x 12 ft.): 4,000 Sq. Ft. / Day
Plant and Machinery cost:
332.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
939.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags- Biodegradable Compostable Carry Bag, Eco friendly Bag Production from Corn & Cassava Starch
Biodegradable Plastic Bags- Biodegradable Compostable Carry Bag, Eco friendly Bag Production from Corn & Cassava Starch

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation ... Read More

Capacity :
Biodegradable Plastic Bags from Corn Starch (Per Bag 25 gms Size): 6 MT / Day Biodegradable Plastic
Plant and Machinery cost:
1053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1768.00Lakhs
Add To Inquiry Basket
Production of  Bamboo Fabric, Tungsten Carbide Rod, Soyabean Products, Curcumin Extraction Unit, Red Oxide Primer, Ethanol, Red Iron Oxide, Sodium Chlorite Liquid from Powder
Production of Bamboo Fabric, Tungsten Carbide Rod, Soyabean Products, Curcumin Extraction Unit, Red Oxide Primer, Ethanol, Red Iron Oxide, Sodium Chlorite Liquid from Powder

 

Production... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Banana Wafers
Manufacturing of Banana Wafers

Manufacturing of Banana Wafers (Deep Fried Snack Food). Profitable Food Processing Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Used and Waste Oil Recycling Plant
Used and Waste Oil Recycling Plant

Waste oil is generated from industrial and non-industrial sources and primarily contains hydrocarbons. It’s goin... Read More

Capacity :
Used Lubricating Oil: 7,600 Ltrs / Day Spent Clay: 800 Kgs / Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
664.00Lakhs
Add To Inquiry Basket
Camphor Powder (Kapoor-Kapur) Making Business Plan
Camphor Powder (Kapoor-Kapur) Making Business Plan

Camphor (Cinnamomum camphor) is a white, crystalline substance with a powerful odor and pungent taste, derived from th... Read More

Capacity :
Camphor Powder: 3000 Kgs / Day
Plant and Machinery cost:
159.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
459.00Lakhs
Add To Inquiry Basket
Start a Disposable Plastic Syringes Manufacturing Business
Start a Disposable Plastic Syringes Manufacturing Business

Disposable Syringes are made from plastic material and are utilized in the sector of medical and veterinary science. because of their availability ... Read More

Capacity :
Disposable Plastic Syringes 1 ml Size: 720 Boxes / Day (Each Boxes = 100 Pcs) Disposable Plastic Sy
Plant and Machinery cost:
513.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Brushless DC Motor (BLDC) Fan Production
Brushless DC Motor (BLDC) Fan Production

 

BLDC stands for Brushless DC motors. The BLDC motor may be a synchronous motor powered by a DC electric sour... Read More

Capacity :
BLDC Celling Fan (48"-52") : 1,000 Pcs. / Day
Plant and Machinery cost:
48.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Business Plan of Craft Beer (Microbrewery or Craft Brewery)
Business Plan of Craft Beer (Microbrewery or Craft Brewery)

A microbrewery or craft brewery may be a brewery that produces small amounts of beer (or sometimes root beer), t... Read More

Capacity :
Craft Beer (Bottles 650 ml Size): 18,462 Nos. / Day Craft Beer (Al. Cans 500 ml Size): 24,000 Nos. /
Plant and Machinery cost:
1366.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
4432.00Lakhs
Add To Inquiry Basket
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)

 

Indian culture has a very long history with sp... Read More

Capacity :
300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
44.00Lakhs
Add To Inquiry Basket
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Ready Mix Plaster,  Block Jointer, Tile Adhesive  and M 20 Concrete (Micro Concrete)
Business Plan for Production of Ready Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Ready Mix Plaster is a mixture of cement paste... Read More

Capacity :
0
Plant and Machinery cost:
294.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1342.00Lakhs
Add To Inquiry Basket
Start Phosphate Rich Organic Manure (PROM) Production Business
Start Phosphate Rich Organic Manure (PROM) Production Business

 

Phosphate rice or... Read More

Capacity :
Phosphate Rich Organic Manure (PROM) 28,800 MT Per Annum
Plant and Machinery cost:
182.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
78.00 %
TCI :
0.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business

Stainless steel cold rolled... Read More

Capacity :
0
Plant and Machinery cost:
2863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
9293.00Lakhs
Add To Inquiry Basket
Setting up  Hemodialysis Blood Tubing  Business
Setting up Hemodialysis Blood Tubing Business

The introduction of hemodia... Read More

Capacity :
Homodialysis Blood Tubing Set 1,200,000 Pcs Per Annum
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
344.00Lakhs
Add To Inquiry Basket
Start Protein Based Nutrition Foods Production
Start Protein Based Nutrition Foods Production

 

Protein-based nut... Read More

Capacity :
Protein Based Nutrition Foods 1,200,000 Nos Per Annum (500 gms)
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
437.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash by Solvay process
A Business Plan for Soda Ash by Solvay process

 

Soda ash, also known as sodium carbonate, is a chemical compound produced when a base and an ac... Read More

Capacity :
Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl):200,000 MT Per Annum
Plant and Machinery cost:
14300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
21000.00Lakhs
Add To Inquiry Basket
Floral Foam (Phenolic Foam) with Resin Manufacturing Business
Floral Foam (Phenolic Foam) with Resin Manufacturing Business

 

Floral foam, also known as phenolic foam, is a lightweight, highly porous foam material used to hold and hyd... Read More

Capacity :
Floral Foam (Phenolic Foam): 90,000 Kg. Per Annum
Plant and Machinery cost:
84.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
366.00Lakhs
Add To Inquiry Basket
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

Glass Fiber Reinforced Polymer (GFRP) Rebar is a type of composite material that is made from combining glass fibers with a polymer matrix. This co... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm): 360,000 MT Per Annum
Plant and Machinery cost:
588.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
6097.00Lakhs
Add To Inquiry Basket
Start Polyvinyl Alcohol Production business
Start Polyvinyl Alcohol Production business

Polyvinyl Alcohol (PVOH) is a synthetic polymer created through the polymerization of vinyl acetate. It is a water-soluble ... Read More

Capacity :
Polyvinyl Alcohol: 6,000 MT Per Annum
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1193.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Starting a Glass Bottles ... 300 MT Per Day 27.00 10600.00
Calcium Chloride Manufact... Calcium Chloride (Flakes): 1667 MT Per Day Carbon Di-oxide (By Product): 463 MT Per Day 26.00 101000.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kg 30.00 198.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kgs 29.00 200.00
Iodine Granules from Iodi... 200 MT Per Annum 31.00 600.00
Activated Carbon from Coc... 6 MT Per Day 29.00 720.00
Sanitary Napkins Manufact... Sanitary Napkins 8pcs in one pkt. (260 mm Size):  21,600 PKTS Per Day 31.00 305.00
Low Toxicity Base Oil fro... 100,000 Ltrs. Per Day 43.00 7200.00
Lab Grown Diamonds (CVD D... Lab Cultured Diamonds (1 Carat): 30 Carat Per Day 24.00 534.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
12345678910...

Showing 661 - 720 of 2752 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.