There are hundreds of commercial varieties of cassava in various equatorial regions. These varieties fall into two main categories: Manihot palmate an...
|
Capacity : (Cassava Flour 3000, Starch 30000, Gari 1500, Cuscus 1500) MT / Annum |
Plant and Machinery cost: Rs. 400 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 84.00 |
TCI : Cost of Project : Rs. 1500 Lacs |
|
Cost of Project : 0 |
Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of wate...
|
Capacity : 10000 Ltrs./day |
Plant and Machinery cost: Rs. 60 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 180 lakhs |
|
Cost of Project : 0 |
An effective biogas programme leads to efficient use of cow dung for gas recovery and partial supplement to plant nutrient requirement. Biogas program...
|
Capacity : 450 KGS/day |
Plant and Machinery cost: Rs. 6 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 29 lakhs |
|
Cost of Project : 0 |
Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally depen...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: Rs. 156 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs. 2396 lakhs |
|
Cost of Project : 0 |
A lifting hook comprising a suspension part fitted with a suspension shaft, which supports a hook part provided with a slot. A safety latch is pivotal...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 57 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs. 352 lakhs |
|
Cost of Project : 0 |
Engine oil becomes contaminated with foreign material in service. In circulating systems, where a substantial quantity of oil is involved, it is desir...
|
Capacity : 1 MT/day |
Plant and Machinery cost: Rs. 20 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 100 Lakhs |
|
Cost of Project : 0 |
Natural fireclays were the raw materials for the first refractories. Their usefulness in this respect is founded on the high proportion of clay minera...
|
Capacity : 15000 MT / Annum |
Plant and Machinery cost: 145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Cost of Project : 370 Lakhs |
|
Cost of Project : 37000000 |
There are more than 5000 verities of rose in India of which only a few yield essential oils. The verities that are grown in India for obtaining essent...
|
Capacity : Flower Yield 4000 Kgs/Ha/Annum, Flower Yield 60 Kgs/Day. Avg., 75 Kgs Rose Oil/Annum, 25000 Ltrs. Rose Water/Annum |
Plant and Machinery cost: Rs. 30 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 98 lakhs |
|
Cost of Project : 0 |
There are two types of yeast as compressed yeast and dry yeast. It is convenient to use dry yeast powder for bakeries because it is handling is simple...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 292 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Rs. 535 lakhs |
|
Cost of Project : 0 |
Piping may represent as much as 25 percent of the cost of a chemical-process plant. The installed cost of piping systems varies widely with the materi...
|
Capacity : 1500 MT / Annum Tubes, 600 MT/Annum Fittings |
Plant and Machinery cost: 554 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 752 Lakhs |
|
Cost of Project : 0 |
Thermocole or expanded polystyrene as the name suggests, is polystyrene expanded to more than two times the volume of polystyrene. Polystyrene foam is...
|
Capacity : 400 Kgs./Day |
Plant and Machinery cost: Rs. 61 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Rs. 201 Lakhs |
|
Cost of Project : 0 |
In the manufacture of inner tubes the plant required is fairly simple and inexpensive, the principal outlay being for wrapping machines and mandrills....
|
Capacity : 1000 Nos./day |
Plant and Machinery cost: Rs. 32 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 165 lakhs |
|
Cost of Project : 0 |
The sanitary napkin industry is closely connected with the mode of life, which is in turn directly correlated to housing. In India, the technology for...
|
Capacity : 120000 Pcs./Day |
Plant and Machinery cost: Rs. 27 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 63.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 183 Lacs |
|
Cost of Project : 0 |
Glass is so much a part of our daily life that we cannot imagine living without it. Glassware is used both by the consumer as well as by the Governmen...
|
Capacity : 1500 MT /Annum |
Plant and Machinery cost: 91 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 71.00 |
TCI : Cost of Project : 193 Lakhs |
|
Cost of Project : 0 |
Potato is widely consumed as food all over the world. Potatoes are consumed not only as a fresh vegetable, but also in a variety of processed forms. P...
|
Capacity : 120 MT / Annum |
Plant and Machinery cost: 166 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project : 268 Lakhs |
|
Cost of Project : 0 |
The term ˜plywood covers a form of laminated caves in which successive layers of veneer are ordinarily cross laminated, the care of which may be venee...
|
Capacity : 23333 SQM/day |
Plant and Machinery cost: Rs. 43 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs. 404 lakhs |
|
Cost of Project : 0 |
Mill and straw boards are thicker, heavier and less flexible than the convention paper. The thickness of board is the thickness of a single sheet boar...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 39 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs.169 lakhs |
|
Cost of Project : 0 |
Potash alum is prepared from its naturally occurring minerals such as alunite and kalinite, but in India these do not occur in appreciable quantities....
|
Capacity : 10 MT/day |
Plant and Machinery cost: Rs. 19 lakhs |
|
Working Capital : |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 109 lakhs |
|
Cost of Project : 0 |