Besides, Bihar is rapidly bending towards a dynamic industrial-cum-entrepreneurial destination anchored on a thriving agricultural setting, robust infrastructural edifice, and an inventive state of outlook. The precise areas that the state is deliberately focusing on at the moment include laser-sharp present sectors, for instance, food processing, dairy, fisheries, textiles, logistics, and renewable power-generation, among others. This implies that there are countless opportunities for ideal start-ups are numerous, as well as for prospective investors who are more interested in the scattering, low to medium capex, and truly scalable industrial travel. This is because of the inherent raw materials, low-cost human labor, and rapid transportation via the IMC Gaya plus other industrial corridors that present abundant prospects for considerate industrial infiltrations. Therefore, with the introduction of the visionary governmental incentives and hassle-free land-sourcing via BIADA, Bihar is strongly re-scripting the narrative and claiming a position among the most favored states in India when it comes to entire economic ripeness.
On the one hand, the Bihar government argues that its economy has indeed developed very rapidly during the most recent period. Thus, double-digit growth in current prices was noted from 2023 to 2025, which affected state output significantly, as mentioned above, the latter reached high values due to exceptionally high public-sector investments in industrial growth.
Key advantages:
To sum up, Bihar’s industrial ecosystem operates in a state that has an enabling environment, revitalized under the current government, a foundation of the most significant rich life-sustaining agri-based resources, and highly productive public expenditure. The state-government chosen sectoral focus on food processing, dairy, fisheries, textiles & renewable energy are demand guaranteed and provide suitable environments for the growth of sustainable MSMEs. BIADA’s supporting role and alternative of the cluster-based and SWG-integrated ones that minimize the geographical time and scope distance to the market facilitate easier, leisure creation and sustain, with negligible costs of doing business. If the turn-around to fully profit-oriented implementation and industrial revolution by investors and those clothed business incubators be hastened and pursued, Bihar’s increment thieving and highly demanding consumers will be favourably served, assuring investors potential ready and sustaining market forces.
Please choose a project below related to this category.
Plastic, today, is being increasingly utilized in almost every industry and activity. Its use has become indispensable due mainly to certain inherent...
|
Capacity : LDPE/LLDPE Pouch Films :1.2 MT/Day |
Plant and Machinery cost: Rs 30 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.32 |
|
Break Even Point (BEP): 41.09 |
TCI : Cost of Project:Rs 254 Lakhs |
|
Cost of Project : 25400000 |
There are so many fibres available which has property of non absorbing among those fibres are nylon, Terelene, polyesters etc are synthetic fibre. Sil...
|
Capacity : Black Braided Silk Surgical Sutures:250 Boxes/Day |
Plant and Machinery cost: Rs 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.20 |
|
Break Even Point (BEP): 54.09 |
TCI : Cost of Project:Rs 146 Lakhs |
|
Cost of Project : 14600000 |
Camphor (Cinnamomum camphora) is a white, crystalline substance with a strong odor and pungent taste, derived from the wood of camphor laurel (Cinnamo...
|
Capacity : Camphor Powder: 2.5 MT/Day •Camphor Tablets:2.5 MT/Day |
Plant and Machinery cost: Rs 206 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 50.15 |
TCI : Cost of Project: Rs 547 Lakhs |
|
Cost of Project : 54700000 |
Biscuits are an important product in human diet and are usually eaten with tea and are also used as weaning food for infants.Around the world Biscuits...
|
Capacity : Biscuits:2.4 MT/Day •Candy :1.2 MT/Day |
Plant and Machinery cost: Rs 94 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.72 |
|
Break Even Point (BEP): 65.01 |
TCI : Cost of Project:Rs 297 Lakhs |
|
Cost of Project : 29700000 |
Camphor (Cinnamomum camphora) is a white, crystalline substance with a strong odor and pungent taste, derived from the wood of camphor laurel (Cinnamo...
|
Capacity : Camphor Powder: 2.5 MT/Day •Camphor Tablets:2.5 MT/Day |
Plant and Machinery cost: Rs 206 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 50.15 |
TCI : Cost of Project: Rs 547 Lakhs |
|
Cost of Project : 54700000 |
There are many kinds of plastics in the world, any plastics when react with the Blowing Agent will become "Foam" which generally called "Foam Plastics...
|
Capacity : Glasses: 324000 Glasses/Day, Plates: 162000 Plates/Day |
Plant and Machinery cost: Rs 73 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs 245 Lakhs |
|
Cost of Project : 0 |
Grey Oxide, The chemical name of Lead Suboxide is called as 2PbO.Pb and is available in grey colored powder. Lead Suboxide is also called as Battery o...
|
Capacity : 48 MT/Day |
Plant and Machinery cost: Rs 250 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.72 |
|
Break Even Point (BEP): 55.05 |
TCI : Cost of Project: Rs 878 Lakhs |
|
Cost of Project : 87800000 |
The paprika oleoresins are produced by solvent extraction of dried, ground red pepper fruits, using a solvent-system compatible with the lipophilic/hy...
|
Capacity : 250 Kgs/Day |
Plant and Machinery cost: Rs 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.41 |
|
Break Even Point (BEP): 57.07 |
TCI : Cost of Project: Rs 238 Lakhs |
|
Cost of Project : 23800000 |
The cashew tree (Anacardium occidentale) is a tropical evergreen tree that produces the cashew nut and the cashew apple. It can grow as high as 14 met...
|
Capacity : Cashew Nuts: 600 Kgs/Day, Cashew Nut Shell by product: 1650 Kgs/Day |
Plant and Machinery cost: Rs 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.45 |
|
Break Even Point (BEP): 56.36 |
TCI : Cost of Project: Rs 126 Lakhs |
|
Cost of Project : 12600000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. Technical textiles are defined as textile materials and pr...
|
Capacity : Sanitary Napkins Ultra Thin Type: 15000 Pkts/Day, Sanitary Napkins Cotton Core Type: 15000 Pkts/Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.92 |
|
Break Even Point (BEP): 40.85 |
TCI : Cost of Project : Rs 755 Lakhs |
|
Cost of Project : 75500000 |
Sizing Precipitated Calcium Carbonate (PCC)—also known as purified, refined or synthetic calcium carbonate. It has the same chemical formula as other...
|
Capacity : 25 MT/Day |
Plant and Machinery cost: Rs 715 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.65 |
|
Break Even Point (BEP): 52.58 |
TCI : Cost of Project: Rs 1138 Lakhs |
|
Cost of Project : 113800000 |
Azadirachta indica (Neem) tree belongs to the Meliaceae family. It is a multipurpose and an evergreen tree, 12–18 m tall, which can grow in almost all...
|
Capacity : Neem Oil : 5 MT/Day, Neem Cake as By Product : 42 MT/Day |
Plant and Machinery cost: Rs 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.74 |
|
Break Even Point (BEP): 62.91 |
TCI : Cost of Project: Rs 320 Lakhs |
|
Cost of Project : 32000000 |