Besides, Bihar is rapidly bending towards a dynamic industrial-cum-entrepreneurial destination anchored on a thriving agricultural setting, robust infrastructural edifice, and an inventive state of outlook. The precise areas that the state is deliberately focusing on at the moment include laser-sharp present sectors, for instance, food processing, dairy, fisheries, textiles, logistics, and renewable power-generation, among others. This implies that there are countless opportunities for ideal start-ups are numerous, as well as for prospective investors who are more interested in the scattering, low to medium capex, and truly scalable industrial travel. This is because of the inherent raw materials, low-cost human labor, and rapid transportation via the IMC Gaya plus other industrial corridors that present abundant prospects for considerate industrial infiltrations. Therefore, with the introduction of the visionary governmental incentives and hassle-free land-sourcing via BIADA, Bihar is strongly re-scripting the narrative and claiming a position among the most favored states in India when it comes to entire economic ripeness.
On the one hand, the Bihar government argues that its economy has indeed developed very rapidly during the most recent period. Thus, double-digit growth in current prices was noted from 2023 to 2025, which affected state output significantly, as mentioned above, the latter reached high values due to exceptionally high public-sector investments in industrial growth.
Key advantages:
To sum up, Bihar’s industrial ecosystem operates in a state that has an enabling environment, revitalized under the current government, a foundation of the most significant rich life-sustaining agri-based resources, and highly productive public expenditure. The state-government chosen sectoral focus on food processing, dairy, fisheries, textiles & renewable energy are demand guaranteed and provide suitable environments for the growth of sustainable MSMEs. BIADA’s supporting role and alternative of the cluster-based and SWG-integrated ones that minimize the geographical time and scope distance to the market facilitate easier, leisure creation and sustain, with negligible costs of doing business. If the turn-around to fully profit-oriented implementation and industrial revolution by investors and those clothed business incubators be hastened and pursued, Bihar’s increment thieving and highly demanding consumers will be favourably served, assuring investors potential ready and sustaining market forces.
Please choose a project below related to this category.
Granite is a common type of felsic intrusive igneous rock which is granular and phaneritic in texture. These rocks mainly consist of feldspar, quartz,...
|
Capacity : Granite: 20 Cu.mt/Day |
Plant and Machinery cost: Rs 695 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1842 Lakhs |
|
Cost of Project : 184200000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. A sanitary napkin or a sanitary towel is an absorbent item...
|
Capacity : 30,000 Pkts./Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs 685 Lakhs |
|
Cost of Project : 68500000 |
Tractor is one of the most important farm machineries. We can say that tractor is the forehand of the farming industry. This is the blessing of god as...
|
Capacity : Tractors: 84 Nos./Day |
Plant and Machinery cost: Rs 258 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 1771 Lakhs |
|
Cost of Project : 177100000 |
A transmission tower (colloquially termed an electricity pylon in the United Kingdom and parts of Europe, an ironman in Australia, and a hydro tower i...
|
Capacity : Transmission & Tele Communication Tower: 80 MT/ Day |
Plant and Machinery cost: Rs 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 1309 Lakhs |
|
Cost of Project : 130900000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particles. The...
|
Capacity : Blended Lubricating Oil 4 KL/ Day •Greases:1 KL/Day |
Plant and Machinery cost: Rs 174 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 465 Lakhs |
|
Cost of Project : 46500000 |
Lime, magnesia, strontium, and baryts were found to have alkaline reactions and were called alkaline earths. The alkaline earth metal includes magnesi...
|
Capacity : Magnesium Sulphate (Fertiliser Grade): 60 MT/Day |
Plant and Machinery cost: Rs 195 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 62.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 861 Lakhs |
|
Cost of Project : 86100000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Edible nuts are used by mankind for food, edible oils, spices, condiments or beverages. They have been an important food source from prehistoric times...
|
Capacity : Pea Nuts:500 Kgs./Day • Cashew Nuts:500 Kgs./Day •Almonds:500 Kgs./Day •Pistachio:500 Kgs./Day |
Plant and Machinery cost: Rs 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:: Rs 222 Lakhs |
|
Cost of Project : 22200000 |
Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation proces...
|
Capacity : Vodka from Grain & Potato:30 KLs/Day |
Plant and Machinery cost: Rs 3845 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 6316 Lakhs |
|
Cost of Project : 631600000 |
There is cleaning requirement everywhere. Cleanliness is the source of beauty and also the placement of God. Laundry unit is one of the unit by which...
|
Capacity : Washing & Iron: 700.0 Pcs/ day |
Plant and Machinery cost: Rs 48 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 145 Lakhs |
|
Cost of Project : 14500000 |
The term alcohol was first applied to the spirits of wine, ethyl alcohol, and now it refers to a series of substances with similar characteristics Eth...
|
Capacity : Alcohol from Potato: 60 KLs/Day |
Plant and Machinery cost: Rs 810 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: Rs 2280 Lakhs |
|
Cost of Project : 0 |
The automobile is unique-technological achievement, which make the distance shorter. With this a far distance is covered in very short time. In develo...
|
Capacity : Brake Shoe (Aluminium Based):2000 NOs/Day •Brake Shoe (Mild Steel Based) : 2000 NOs/Day |
Plant and Machinery cost: Rs 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project: Rs 148 Lakhs |
|
Cost of Project : 14800000 |