Besides, Bihar is rapidly bending towards a dynamic industrial-cum-entrepreneurial destination anchored on a thriving agricultural setting, robust infrastructural edifice, and an inventive state of outlook. The precise areas that the state is deliberately focusing on at the moment include laser-sharp present sectors, for instance, food processing, dairy, fisheries, textiles, logistics, and renewable power-generation, among others. This implies that there are countless opportunities for ideal start-ups are numerous, as well as for prospective investors who are more interested in the scattering, low to medium capex, and truly scalable industrial travel. This is because of the inherent raw materials, low-cost human labor, and rapid transportation via the IMC Gaya plus other industrial corridors that present abundant prospects for considerate industrial infiltrations. Therefore, with the introduction of the visionary governmental incentives and hassle-free land-sourcing via BIADA, Bihar is strongly re-scripting the narrative and claiming a position among the most favored states in India when it comes to entire economic ripeness.
On the one hand, the Bihar government argues that its economy has indeed developed very rapidly during the most recent period. Thus, double-digit growth in current prices was noted from 2023 to 2025, which affected state output significantly, as mentioned above, the latter reached high values due to exceptionally high public-sector investments in industrial growth.
Key advantages:
To sum up, Bihar’s industrial ecosystem operates in a state that has an enabling environment, revitalized under the current government, a foundation of the most significant rich life-sustaining agri-based resources, and highly productive public expenditure. The state-government chosen sectoral focus on food processing, dairy, fisheries, textiles & renewable energy are demand guaranteed and provide suitable environments for the growth of sustainable MSMEs. BIADA’s supporting role and alternative of the cluster-based and SWG-integrated ones that minimize the geographical time and scope distance to the market facilitate easier, leisure creation and sustain, with negligible costs of doing business. If the turn-around to fully profit-oriented implementation and industrial revolution by investors and those clothed business incubators be hastened and pursued, Bihar’s increment thieving and highly demanding consumers will be favourably served, assuring investors potential ready and sustaining market forces.
Please choose a project below related to this category.
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 48.23 |
TCI : Cost of Project: Rs 869 Lakhs |
|
Cost of Project : 86900000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |
There has been a dramatic increase in the number of reverse osmosis and nano-filtration plant over the past ten years. There has also been a prolifera...
|
Capacity : Capacity Antiscalants: 5MT/Day, Membrane Cleaners: 5 MT/Day |
Plant and Machinery cost: Rs 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.82 |
|
Break Even Point (BEP): 63.96 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |
Leather is considered as a symbol of fashion, uniqueness, trend and styles. The demand for quality leather products as well as accessories never cease...
|
Capacity : - |
Plant and Machinery cost: Rs 28 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.37 |
|
Break Even Point (BEP): 58.01 |
TCI : Cost of Project: Rs 264 Lakhs |
|
Cost of Project : 26400000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conductor...
|
Capacity : • All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day |
Plant and Machinery cost: Rs 580 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.36 |
|
Break Even Point (BEP): 56.24 |
TCI : Cost of Project: Rs 1141 Lakhs |
|
Cost of Project : 114100000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : TMT Bar: 125 MT/Day • Scraps: 6MT/Day |
Plant and Machinery cost: Rs 730 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 1675 Lakhs |
|
Cost of Project : 167500000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
Plastic (HDPE, PVC, UPVC and RCC) Pipes [NPCS/4771/22821, 22826] PVC pipes are made out of a material known as polyvinyl chloride, a durable, stro...
|
Capacity : HDPE Pipes:83.3 MT/Day, PVC Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 938 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 2124 Lakhs |
|
Cost of Project : 212400000 |
SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: 1....
|
Capacity : SAW (Spiral & Longitudinal) Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 1387 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 11.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 1802 Lakhs |
|
Cost of Project : 180200000 |