The North Region of India is situated in the Jammu and Kashmir (J&K); It's an area endowed with natural beauty, a variety of resources and a geo-economic dominant accent. The “New Industrial Policy 2021” has dawned a promise of the new era of investments and industrial development in the "Paradise on Earth".
J&K Government focusing on sustainable economic development, skill generation and entrepreneurship, films pushed into the employment opportunities which includes Horticulture, Handicrafts, Food Processing, Renewable Energy, IT and Tourism based industries. Such a diverse mix makes it an economic power house but the incentives that feed this growth have to be acknowledged, it’s a performer.
Filled with agro-climatic diversity, available natural resources and special fiscal incentives, J&K has emerged as the most well suited and promising emerging economy in the North Region of India.
1. Strategic location and Connectivity J&K is gateway to Central Asia from India - This strategic location on key trade routes will only be undermined by bad transportation and connectivity With Udhampur-Srinagar-Baramulla Rail Link in place and improved air connectivity to Srinagar, Jammu and Leh, the rest of India along with the world and making the Union sector accessible for importing and exporting.
2. Also the Government has flagged the need to develop the Fazilka-Mumbai trade route early signs This enchanting state has a rich natural resource base comprising a thriving and picturesque landscape and agriculture. It is already practicable, if the state leverages these specifics by practicing proper production techniques then, packaging and exports industries oriented toward production of high value goods like Apples, Saffron, Walnuts, Cherries & Almonds find a boom in the valley.
3. Trained human resource - With a literacy rate of 77%, J&K has a young population much like India poised to be ready tomorrow for jobs in production, trade, tourism, as well as need craftsman mandatory skilled for the production Orient authorities to generate skilled manpower aligned with those project of focus away from old age inclinations such as handicraft, IT, tourism, plant manufacturing and soil management.
4. Political stability Growing Infrastructure - In addition to the havoc wreaked by the dilution of article 370, J&K has seen a significant pour in investments in logistics and industrial estates since 2019 completion of projects like AIIMS Jammu, Srinagar Smart City, Chenab Bridge among others shows that the region is now much more accessible improving its connectivity and also enabling better environment both for public and business.
1) Agriculture and horticulture - J&K accounts for more than 75% of apples grown in India, its horticultural sector representing approximately 10% of GSDP. Furthermore, J&K produces the saffron, walnuts, almonds, apricots, and cherries that serve as the basis for fruit processing, packaging, juice-making, and export operations.
2) Handicrafts and wool - The birthplace of Pashmina shawls and carpets and famous for papier-mâché and woodcarvings, the raw materials and skilled workforce are perfect for craft hubs and eco-design studios, particularly in handicraft e-sale development and exports.
3) Mineral and forest resources - With limestone, gypsum, sapphire, and marble deposits that are used in the cement, ceramics, and construction sectors, J&K possesses significant geologic resources. Its large forest areas and timber, resin, and herbal production industries are other crucial sectors.
Therefore, Jammu and Kashmir’s economy shifts from a heavy reliance on tourism to involve multiple sectors, notably:
Investment IncentivesPackage: The Government of India in collaboration with the J&K administration offers a whole lot of financial and fiscal incentives to investors and entrepreneurs. A few of them include; 30% of the investment in plant and machinery up to ₹5 crore as Capital Investment Incentive Interest Subvention of 6% for 5 years on working capital loans, guaranteed Competent transport subsidy equal to 100% of GST for 10 years, insurance covers subsidized to 100 percent freight subsidizes on all exports and interstate supplies; land allocation at discounted prices in recent industrial properties, workers earning subsidy of ₹5,000 – ₹10,000 per work per month for hiring local workers, an additional 5 % subsidy to female and youth entrepreneurs, and many more. The incentives improve profit margins and decrease capital payback timelines, resulting in Return on Investments of 15% -30% across all sectors
Jammu and Kashmir is in the throes of an impressive economic transformation – that of a single-sector service economy based on tourism into a multi-sectoral industrial powerhouse. Blessed with natural resources, government patronage, development of infrastructure and strategic linkages to markets, the region offers successions of opportunity to entrepreneurs. Whether in fruit processing, handicrafts, tourism, IT, renewable energy, wellness and entertainment, entrepreneurs in J&K could benefit from high-growth ventures with fiscal sops and export potential. With peace and development reimagining the region, Jammu and Kashmir is well on its way to becoming North India’s new frontier of sustainable, profitable and inclusive industrial growth.
Please choose a project below related to this category.
There has been a dramatic increase in the number of reverse osmosis and nano-filtration plant over the past ten years. There has also been a prolifera...
|
Capacity : Capacity Antiscalants: 5MT/Day, Membrane Cleaners: 5 MT/Day |
Plant and Machinery cost: Rs 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.82 |
|
Break Even Point (BEP): 63.96 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |
Leather is considered as a symbol of fashion, uniqueness, trend and styles. The demand for quality leather products as well as accessories never cease...
|
Capacity : - |
Plant and Machinery cost: Rs 28 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.37 |
|
Break Even Point (BEP): 58.01 |
TCI : Cost of Project: Rs 264 Lakhs |
|
Cost of Project : 26400000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : TMT Bar: 125 MT/Day • Scraps: 6MT/Day |
Plant and Machinery cost: Rs 730 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 1675 Lakhs |
|
Cost of Project : 167500000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
Plastic (HDPE, PVC, UPVC and RCC) Pipes [NPCS/4771/22821, 22826] PVC pipes are made out of a material known as polyvinyl chloride, a durable, stro...
|
Capacity : HDPE Pipes:83.3 MT/Day, PVC Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 938 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 2124 Lakhs |
|
Cost of Project : 212400000 |
SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: 1....
|
Capacity : SAW (Spiral & Longitudinal) Pipes: 166.7 MT/Day |
Plant and Machinery cost: Rs 1942 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 3201 Lakhs |
|
Cost of Project : 320100000 |
Controlled atmosphere (CA) storage involves maintaining an atmospheric composition that is different from air composition (about 78% N2, 21% O2, and 0...
|
Capacity : Seasonal Commodity:11 MT/Day,Cold Storage (Rental):44 MT/Day |
Plant and Machinery cost: Rs 365 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 1022 Lakhs |
|
Cost of Project : 102200000 |
Fatty alcohol is a generic term for a range of aliphatic hydrocarbons containing a hydroxyl group, usually in the terminal or n-position.They are natu...
|
Capacity :
|
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Superoxide dismutases (SOD, EC 1.15.1.1) are enzymes that alternately catalyze the dismutation (or partitioning) of the superoxide (O2?) radical into...
|
Capacity : Superoxide Dismutase: 50 Kgs/Day |
Plant and Machinery cost: Rs 133 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 616 Lakhs |
|
Cost of Project : 61600000 |
The Indian pharmaceutical sector has come a long way, being almost non-existent before 1970 to a prominent provider of healthcare products, meeting al...
|
Capacity : Tablets: 500,000 Nos./Day,Capsules:500,000 Nos./Day,Syrup (100 ml Size):12,500 Nos./Day |
Plant and Machinery cost: Rs 178 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project: Rs 6342 Lakhs |
|
Cost of Project : 634200000 |
In modern tobacco farming, Nicotiana seeds are scattered onto the surface of the soil, as their germination is activated by light, then covered in col...
|
Capacity : Processed Tobacco Leaves: 24 MT/Day |
Plant and Machinery cost: Rs 1265 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 80.00 |
TCI : Cost of Project: Rs 2267 Lakhs |
|
Cost of Project : 226700000 |