The North Region of India is situated in the Jammu and Kashmir (J&K); It's an area endowed with natural beauty, a variety of resources and a geo-economic dominant accent. The “New Industrial Policy 2021” has dawned a promise of the new era of investments and industrial development in the "Paradise on Earth".
J&K Government focusing on sustainable economic development, skill generation and entrepreneurship, films pushed into the employment opportunities which includes Horticulture, Handicrafts, Food Processing, Renewable Energy, IT and Tourism based industries. Such a diverse mix makes it an economic power house but the incentives that feed this growth have to be acknowledged, it’s a performer.
Filled with agro-climatic diversity, available natural resources and special fiscal incentives, J&K has emerged as the most well suited and promising emerging economy in the North Region of India.
1. Strategic location and Connectivity J&K is gateway to Central Asia from India - This strategic location on key trade routes will only be undermined by bad transportation and connectivity With Udhampur-Srinagar-Baramulla Rail Link in place and improved air connectivity to Srinagar, Jammu and Leh, the rest of India along with the world and making the Union sector accessible for importing and exporting.
2. Also the Government has flagged the need to develop the Fazilka-Mumbai trade route early signs This enchanting state has a rich natural resource base comprising a thriving and picturesque landscape and agriculture. It is already practicable, if the state leverages these specifics by practicing proper production techniques then, packaging and exports industries oriented toward production of high value goods like Apples, Saffron, Walnuts, Cherries & Almonds find a boom in the valley.
3. Trained human resource - With a literacy rate of 77%, J&K has a young population much like India poised to be ready tomorrow for jobs in production, trade, tourism, as well as need craftsman mandatory skilled for the production Orient authorities to generate skilled manpower aligned with those project of focus away from old age inclinations such as handicraft, IT, tourism, plant manufacturing and soil management.
4. Political stability Growing Infrastructure - In addition to the havoc wreaked by the dilution of article 370, J&K has seen a significant pour in investments in logistics and industrial estates since 2019 completion of projects like AIIMS Jammu, Srinagar Smart City, Chenab Bridge among others shows that the region is now much more accessible improving its connectivity and also enabling better environment both for public and business.
1) Agriculture and horticulture - J&K accounts for more than 75% of apples grown in India, its horticultural sector representing approximately 10% of GSDP. Furthermore, J&K produces the saffron, walnuts, almonds, apricots, and cherries that serve as the basis for fruit processing, packaging, juice-making, and export operations.
2) Handicrafts and wool - The birthplace of Pashmina shawls and carpets and famous for papier-mâché and woodcarvings, the raw materials and skilled workforce are perfect for craft hubs and eco-design studios, particularly in handicraft e-sale development and exports.
3) Mineral and forest resources - With limestone, gypsum, sapphire, and marble deposits that are used in the cement, ceramics, and construction sectors, J&K possesses significant geologic resources. Its large forest areas and timber, resin, and herbal production industries are other crucial sectors.
Therefore, Jammu and Kashmir’s economy shifts from a heavy reliance on tourism to involve multiple sectors, notably:
Investment IncentivesPackage: The Government of India in collaboration with the J&K administration offers a whole lot of financial and fiscal incentives to investors and entrepreneurs. A few of them include; 30% of the investment in plant and machinery up to ₹5 crore as Capital Investment Incentive Interest Subvention of 6% for 5 years on working capital loans, guaranteed Competent transport subsidy equal to 100% of GST for 10 years, insurance covers subsidized to 100 percent freight subsidizes on all exports and interstate supplies; land allocation at discounted prices in recent industrial properties, workers earning subsidy of ₹5,000 – ₹10,000 per work per month for hiring local workers, an additional 5 % subsidy to female and youth entrepreneurs, and many more. The incentives improve profit margins and decrease capital payback timelines, resulting in Return on Investments of 15% -30% across all sectors
Jammu and Kashmir is in the throes of an impressive economic transformation – that of a single-sector service economy based on tourism into a multi-sectoral industrial powerhouse. Blessed with natural resources, government patronage, development of infrastructure and strategic linkages to markets, the region offers successions of opportunity to entrepreneurs. Whether in fruit processing, handicrafts, tourism, IT, renewable energy, wellness and entertainment, entrepreneurs in J&K could benefit from high-growth ventures with fiscal sops and export potential. With peace and development reimagining the region, Jammu and Kashmir is well on its way to becoming North India’s new frontier of sustainable, profitable and inclusive industrial growth.
Please choose a project below related to this category.
Camphor (Cinnamomum camphora) is a white, crystalline substance with a strong odor and pungent taste, derived from the wood of camphor laurel (Cinnamo...
|
Capacity : Camphor Powder: 2.5 MT/Day •Camphor Tablets:2.5 MT/Day |
Plant and Machinery cost: Rs 206 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 50.15 |
TCI : Cost of Project: Rs 547 Lakhs |
|
Cost of Project : 54700000 |
Biscuits are an important product in human diet and are usually eaten with tea and are also used as weaning food for infants.Around the world Biscuits...
|
Capacity : Biscuits:2.4 MT/Day •Candy :1.2 MT/Day |
Plant and Machinery cost: Rs 94 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.72 |
|
Break Even Point (BEP): 65.01 |
TCI : Cost of Project:Rs 297 Lakhs |
|
Cost of Project : 29700000 |
Camphor (Cinnamomum camphora) is a white, crystalline substance with a strong odor and pungent taste, derived from the wood of camphor laurel (Cinnamo...
|
Capacity : Camphor Powder: 2.5 MT/Day •Camphor Tablets:2.5 MT/Day |
Plant and Machinery cost: Rs 206 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 50.15 |
TCI : Cost of Project: Rs 547 Lakhs |
|
Cost of Project : 54700000 |
There are many kinds of plastics in the world, any plastics when react with the Blowing Agent will become "Foam" which generally called "Foam Plastics...
|
Capacity : Glasses: 324000 Glasses/Day, Plates: 162000 Plates/Day |
Plant and Machinery cost: Rs 73 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs 245 Lakhs |
|
Cost of Project : 0 |
The paprika oleoresins are produced by solvent extraction of dried, ground red pepper fruits, using a solvent-system compatible with the lipophilic/hy...
|
Capacity : 250 Kgs/Day |
Plant and Machinery cost: Rs 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.41 |
|
Break Even Point (BEP): 57.07 |
TCI : Cost of Project: Rs 238 Lakhs |
|
Cost of Project : 23800000 |
The cashew tree (Anacardium occidentale) is a tropical evergreen tree that produces the cashew nut and the cashew apple. It can grow as high as 14 met...
|
Capacity : Cashew Nuts: 600 Kgs/Day, Cashew Nut Shell by product: 1650 Kgs/Day |
Plant and Machinery cost: Rs 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.45 |
|
Break Even Point (BEP): 56.36 |
TCI : Cost of Project: Rs 126 Lakhs |
|
Cost of Project : 12600000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. Technical textiles are defined as textile materials and pr...
|
Capacity : Sanitary Napkins Ultra Thin Type: 15000 Pkts/Day, Sanitary Napkins Cotton Core Type: 15000 Pkts/Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.92 |
|
Break Even Point (BEP): 40.85 |
TCI : Cost of Project : Rs 755 Lakhs |
|
Cost of Project : 75500000 |
Sizing Precipitated Calcium Carbonate (PCC)—also known as purified, refined or synthetic calcium carbonate. It has the same chemical formula as other...
|
Capacity : 25 MT/Day |
Plant and Machinery cost: Rs 715 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.65 |
|
Break Even Point (BEP): 52.58 |
TCI : Cost of Project: Rs 1138 Lakhs |
|
Cost of Project : 113800000 |
Azadirachta indica (Neem) tree belongs to the Meliaceae family. It is a multipurpose and an evergreen tree, 12–18 m tall, which can grow in almost all...
|
Capacity : Neem Oil : 5 MT/Day, Neem Cake as By Product : 42 MT/Day |
Plant and Machinery cost: Rs 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.74 |
|
Break Even Point (BEP): 62.91 |
TCI : Cost of Project: Rs 320 Lakhs |
|
Cost of Project : 32000000 |
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 48.23 |
TCI : Cost of Project: Rs 869 Lakhs |
|
Cost of Project : 86900000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |