Best Business Opportunities in Mauritania, Africa- Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

Located on the northwest coast between the Atlantic Ocean and the Sahara, Mauritania combines strategic maritime access, important mineral and marine resources, and a small but growing urban economy. Like, The country's economy depends on mining (iron ore, gold, copper and phosphate), fishing, increasingly animal husbandry, sea fishing and natural gas exploration. Recent policy efforts emphasize the diversification of local value-added infrastructure development and the creation of attractive opportunities for investors and entrepreneurs working in resource-based logistics and export-oriented value chains.

Reasons to Start Industry in Mauritania

1. The coast and the strategic Atlantic ports

Ports Mauritania's Atlantic interface (Nouakchott and Nouadhibou) provides direct shipping access to Europe, America and West Africa – useful for export-oriented manufacturing, fishery processing and logistics.

2. Rich mineral endowment

The country has large deposits of iron ore and there is growing interest in gold, copper, phosphates and rare earths. These deposits form a solid foundation for mining services, beneficiation and subsequent industrial projects.

3. Abundant marine resources

Mauritania's productive coastal waters support strong fisheries and marine potential (fish, cephalopods and shrimp), making the country a natural , natural location for seafood processing, cold chain and aquaculture development.

4. Emerging energy opportunities

The discovery and exploration of offshore gas and the development of onshore renewable resources (solar, wind) create industrial prospects for energy and raw materials, including industrial energy supply and fertilizer/chemical production in the future.

5. The political focus on diversification and value addition

The government and development partners have shown interest in moving beyond raw material export to local processing, port-led logistics, agribusiness and tourism, supported by strategic project incentives.

Availability of Raw Materials and Supporting Factors

1. Mining inputs

Large iron ore deposits around Zouerate and growing gold/copper exploration provide inputs for mineral processing, steel production and mining services (equipment, maintenance and beneficiation).

 2. Fisheries and marine inputs

Fisheries on the extensive continental shelf provide raw materials for the fishmeal, canning, freezing, value-added seafood and aquaculture feed industries.

3. Pastoral and agricultural resources

While the southern and coastal areas are LARGELY dry, livestock (sheep, goats and camels) and irrigated agricultural areas suitable for milk and meat processing and value-added horticulture are supported by proper water management.

4. Renewable energy base

High solar radiation and offshore wind potential allow for the creation of large-scale solar and wind energy projects, distribution of production in the energy industry, and reduced dependence on imported fuels.

5. Logistics and port infrastructure

The railway lines of the main , main ports (Nouakchott and Nouadhibou) and the mining corridors already serve the national export flow; The development of port capacity and cold chain infrastructure would unlock much greater added value.

Why Select Industry for Startup in Mauritania

Entrepreneurs and investors should target sectors that (a) take advantage of local natural advantages, (b) increase local added value, and (c) serve export or regional markets:

1. Fisheries processing and cold chain logistics

  • Facilities: Canned fish, freezing/quick freezing plants, processing of shrimp, fishmeal and value-added packaged seafood.
  • The reason: Marine supplies are abundant and global , global demand for sustainably processed seafood is strong.
     

2. Enrichment of minerals and light minerals

  • Facilities: iron ore beneficiation, pelletizing, steel re-rolling, gold refining, non-ferrous finished products.
  • The reason: It maintains more value at home and creates industrial jobs related to mining.

3. Renewable energy projects and energy services

  • Facilities: Solar farms, wind farms, hybrid mini-grids, solar water pumping , pumping for irrigation, and operation and maintenance services.
  • The reason: reduce industrial energy costs, enable off-grid manufacturing and support green export rights.

4. Value chains of agricultural processing and livestock breeding

  • Facilities: Milk processing, meat packing, rawhide processing, crushing of oilseeds where irrigation permits.
  • Reason: It adds value to pastoral production, enhances food security and opens up regional markets.

5. Ports, logistics services and re-export centers

  • Facilities: Cold chain terminals, container assembly, third party logistics (3PL), maintenance/vessel service.
  • Reason: Nouadhibou/Nouakchott can become regional focal points for West Africa through targeted investment.

6. Building materials and prefabrication

  • Facilities: Cement sanding, concrete blocks, tiles, prefabricated house panels adapted , adapted to the local climate.
  • Reason: Local reconstruction and urban growth create constant local demand.

Market Demand

  • The main driver of demand remains the export market for seafood, metals and mineral products.
  • Local and regional demand for building materials, processed foods, cold chain support products and energy services is increasing with urbanization and infrastructure projects.
  • The growing interest in renewable energy sources provides long-term demand for project development, equipment and services.
  • With the modernization of port and customs services, the demand for re-export and transshipment may increase.

Government Support and Incentives

Mauritanian authorities and investment promotion bodies typically support strategic projects with measures such as:

  • Exemption from taxes and duties on tangible assets imported for approved projects.
  • Discounted rental conditions for industrial areas in designated areas.
  • Tax incentives or corporate tax incentives for investments that create jobs or increase local added value.
  •  Supporting public-private partnerships in the development of ports, energy , energy projects and cold chain facilities.
  • Facilitating services related to obtaining permits and land allocation through investment agencies.

Mauritania presents impressive investment examples for projects that take advantage of its marine wealth, mineral , mineral resources, coastal logistics and renewable energy , energy resources. The most effective opportunities are fishing and cold chain processing mineral beneficiation, renewable energy sources and port logistics – all of which increase export earnings and create local jobs.

Projects that combine onshore value addition, reliable (preferably green) energy supply and modern logistics are more likely to succeed. Through targeted public-private partnerships enhanced certification and improved port/cold chain , chain capacity Mauritania can expand its industrial base and become a stronger regional supplier of higher value goods.

 

Best Business Opportunities in Mauritania, Africa- Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

Please choose a project below related to this category.

Production of Toilet Paper Rolls, Facial Tissue & Paper Napkins  Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
Production of Toilet Paper Rolls, Facial Tissue & Paper Napkins Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...

Capacity :

Toilet Paper Rolls : 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue

Plant and Machinery cost:

59 Lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

41.00

TCI :

Cost of Project 341 Lakhs

Cost of Project :

34100000

Detergent Cake & Powder
Detergent Cake & Powder

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...

Capacity :

Detergent Cake:180,000Kgs/annum Detergent Powder:180,000Kgs/annum

Plant and Machinery cost:

Rs 15 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

76.00

TCI :

Cost of Project : Rs 36 lakhs

Cost of Project :

3600000

Micronutrients Fertilizer
Micronutrients Fertilizer

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...

Capacity :

Micronutrient Fertilizer for Fruits: 187,500 Kgs/annum Micronutrient Fertilizer for Vegetables: 112,500 Kgs/annum

Plant and Machinery cost:

Rs 23 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

76.00

TCI :

Cost of Project: Rs 114 lakhs

Cost of Project :

11400000

Biofertilizer and Phosphate Rich Organic Manure (PROM)
Biofertilizer and Phosphate Rich Organic Manure (PROM)

Biofertilizers are cost effective, eco-friendly and when they are required in bulk can be generated at the farm itself. They increase crop yield upto...

Capacity :

Bio Fertilizer (Liquid): 60,000 Ltrs/Annum Bio Fertilizer (solid):60,000 Kgs/Annum Micronutrients (Liquid): 48,000 Ltrs/Annum Micronutrients (solid): 60,000 Kgs/Annum Organic Fertlizier (Liquid):60,000 Ltrs/Annum Organic Fertlizier (Solid): 48,000 Kgs/Ann

Plant and Machinery cost:

Rs 42 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

63.00

TCI :

Cost of Project : Rs 122 lakhs

Cost of Project :

12200000

Paper Napkins, Toilet Paper Rolls & Facial Tissues
Paper Napkins, Toilet Paper Rolls & Facial Tissues

The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...

Capacity :

Toilet Paper Rolls: 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue (100 Pcs.): 1,251,000 Nos./annum

Plant and Machinery cost:

Rs 59 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

41.00

TCI :

Cost of Project : Rs 341 lakhs

Cost of Project :

34100000

Disposable Plastic Syringes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Disposable Plastic Syringes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in sterilized...

Capacity :

Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 10 ml Siz : 300,000 Boxes/Annum

Plant and Machinery cost:

Rs 802 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

44.00

TCI :

Cost of Project: Rs 1474 lakhs

Cost of Project :

147400000

Copper Powder By Electrolytic Process - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Copper Powder By Electrolytic Process - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic propertiesmake it a materialof choice...

Capacity :

Copper Powder : 15,000 MT/Annum

Plant and Machinery cost:

Rs 307 lakhs

Working Capital :

-

Rate of Return (ROR):

31.00

Break Even Point (BEP):

46.00

TCI :

Cost of Project: Rs3050 lakhs

Cost of Project :

305000000

Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power fro...

Capacity :

Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap. 20 Watt: 600,000 Nos/Annum Poly Crystaline Solar PV Module Cap. 50 Watt:240,000Nos/Annum Poly Crystaline Solar PV Module Cap. 100 Watt: 150,000Nos/Annum

Plant and Machinery cost:

Rs 1225 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

56.00

TCI :

Cost of Project: Rs 1674 lakhs

Cost of Project :

167400000

Solar Panel Assembling & Solar Power Inverter On Grid, Off Grid with Solar Pump Controller
Solar Panel Assembling & Solar Power Inverter On Grid, Off Grid with Solar Pump Controller

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy. Solar panels generate free power fr...

Capacity :

Poly Crystaline Solar PV Modules (10, 20, 50,100 & 300 Watt): 74,00,000 Nos per annum Solar Inverters (Grid Tie String Inverters 1, 10, 30, 50 & 60 KVA) & (Solar Hydrid Inverters 1, 30, 60, 100 & 120 KVA: 7200 Nos per annum Solar Pump Controller

Plant and Machinery cost:

2162.88 lakhs

Working Capital :

-

Rate of Return (ROR):

36.00

Break Even Point (BEP):

31.00

TCI :

Cost of Project: Rs. 21918

Cost of Project :

2191800000

Bicycle Tyres & Tubes from Natural Rubber - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Bicycle Tyres & Tubes from Natural Rubber - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Cycling is amongst the most sustainable modes of mobility, which has zero dependence on fossil fuels and zero emissions unlike the motorized modes of...

Capacity :

Bicycle Tyres : 450000 Pcs/annum Bicycle Tubes : 450000 Pcs/annum

Plant and Machinery cost:

405 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

52.00

TCI :

Cost of Project: 646 lakhs

Cost of Project :

64600000

SOLAR PANEL- Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
SOLAR PANEL- Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Solar Panels are in general Silicon made Rectangular Shaped Glass Covered Products which Produce Electricity when exposed to the Sun. These Panels pro...

Capacity :

Solar PV Module (240 watt) : 350 Nos/day (25 MW)

Plant and Machinery cost:

Rs 278 Lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

58.00

TCI :

Cost of project: Rs 852 Lakhs

Cost of Project :

85200000

Hematite from Iron Ore/Lumps - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Hematite from Iron Ore/Lumps - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Hematite is one of the most abundant minerals on Earth's surface and in the shallow crust. It is an iron oxide with a chemical composition of Fe2O3. I...

Capacity :

Hematite:120 MT/Day

Plant and Machinery cost:

Rs 416 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.11

Break Even Point (BEP):

51.00

TCI :

Cost of Project : Rs 1081 Lakhs

Cost of Project :

108100000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp