1. The coast and the strategic Atlantic ports
Ports Mauritania's Atlantic interface (Nouakchott and Nouadhibou) provides direct shipping access to Europe, America and West Africa – useful for export-oriented manufacturing, fishery processing and logistics.
2. Rich mineral endowment
The country has large deposits of iron ore and there is growing interest in gold, copper, phosphates and rare earths. These deposits form a solid foundation for mining services, beneficiation and subsequent industrial projects.
3. Abundant marine resources
Mauritania's productive coastal waters support strong fisheries and marine potential (fish, cephalopods and shrimp), making the country a natural , natural location for seafood processing, cold chain and aquaculture development.
4. Emerging energy opportunities
The discovery and exploration of offshore gas and the development of onshore renewable resources (solar, wind) create industrial prospects for energy and raw materials, including industrial energy supply and fertilizer/chemical production in the future.
5. The political focus on diversification and value addition
The government and development partners have shown interest in moving beyond raw material export to local processing, port-led logistics, agribusiness and tourism, supported by strategic project incentives.
1. Mining inputs
Large iron ore deposits around Zouerate and growing gold/copper exploration provide inputs for mineral processing, steel production and mining services (equipment, maintenance and beneficiation).
2. Fisheries and marine inputs
Fisheries on the extensive continental shelf provide raw materials for the fishmeal, canning, freezing, value-added seafood and aquaculture feed industries.
3. Pastoral and agricultural resources
While the southern and coastal areas are LARGELY dry, livestock (sheep, goats and camels) and irrigated agricultural areas suitable for milk and meat processing and value-added horticulture are supported by proper water management.
4. Renewable energy base
High solar radiation and offshore wind potential allow for the creation of large-scale solar and wind energy projects, distribution of production in the energy industry, and reduced dependence on imported fuels.
5. Logistics and port infrastructure
The railway lines of the main , main ports (Nouakchott and Nouadhibou) and the mining corridors already serve the national export flow; The development of port capacity and cold chain infrastructure would unlock much greater added value.
Entrepreneurs and investors should target sectors that (a) take advantage of local natural advantages, (b) increase local added value, and (c) serve export or regional markets:
1. Fisheries processing and cold chain logistics
2. Enrichment of minerals and light minerals
3. Renewable energy projects and energy services
4. Value chains of agricultural processing and livestock breeding
5. Ports, logistics services and re-export centers
6. Building materials and prefabrication
Mauritanian authorities and investment promotion bodies typically support strategic projects with measures such as:
Mauritania presents impressive investment examples for projects that take advantage of its marine wealth, mineral , mineral resources, coastal logistics and renewable energy , energy resources. The most effective opportunities are fishing and cold chain processing mineral beneficiation, renewable energy sources and port logistics – all of which increase export earnings and create local jobs.
Projects that combine onshore value addition, reliable (preferably green) energy supply and modern logistics are more likely to succeed. Through targeted public-private partnerships enhanced certification and improved port/cold chain , chain capacity Mauritania can expand its industrial base and become a stronger regional supplier of higher value goods.
Please choose a project below related to this category.
Chemically, sodium chlorite has the formula NaClO2. It is a white, crystalline material that is non-flammable and odourless. It is employed in industr...
|
Capacity : Sodium Chlorite (NaClO2: 15 MT Per Day |
Plant and Machinery cost: 567 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: 1892 Lakhs |
|
Cost of Project : 189200000 |
A plug-in hybrid electric vehicle (PHEV) is an HEV that can be plugged-in or recharged from wall electricity. PHEVs are distinguished by much larger b...
|
Capacity : 50 Nos./day |
Plant and Machinery cost: 95 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 279 lakhs |
|
Cost of Project : 27900000 |
Detergent Cake and Detergent Powder Manufacturing Industry. Start a Washing Powder and Cake Business Detergent is a blend of surfactants with cleanin...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Hybrid Electric Scooter Assembling Business. Electric Vehicles (EVs) Industry. Business Opportunities in Electric Two-Wheelers Manufacturing Industry...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Copper foil is a sheet of copper that is usually only a few micrometer in thickness. Copper foils are commonly used as a conductor in printed circuit...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The hypodermic syringe, also known as the hypodermic needle, is a device used by medical professionals to transfer liquids into or out of the body.A s...
|
Capacity : Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 82000 Th.Nos./annum |
Plant and Machinery cost: Rs. 2410 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 17.00 |
TCI : Cost of Project: Rs14240 lakhs |
|
Cost of Project : 1424000000 |
A bicycle wheel is a wheel, most commonly a wire wheel, designed for a bicycle. A pair is often called a wheel set, especially in the context of ready...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Tyres are one of the most important compone...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mobile phones, power tools, teleco...
|
Capacity : 90 Volt, 180 AH Lithium Ion Battery Pack: 56 Nos/day |
Plant and Machinery cost: Rs 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 1076 lakhs |
|
Cost of Project : 107600000 |
Disposable Syringes are being used by doctors to inject medicines through intravenous or intramuscular ways for the treatment of diseases & also by re...
|
Capacity : Disposable Plastic Syringes 2 ml Size: 60 Boxes/Day Disposable Plastic Syringes 5 ml Size: 60 Boxes/Day Disposable Plastic Syringes 10 ml Size: 40 Boxes/Day |
Plant and Machinery cost: Rs. 137 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 13.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs 307 lakhs |
|
Cost of Project : 30700000 |
Phosphoric acid (also known as orthophosphoric acid or phosphoric (V) acid) is a weak acid with the chemical formula H3PO4. Orthophosphoric acid refer...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Acetic acid systematically named ethanoic acid is a colourless liquid organic compound with the chemical formula CH3COOH (also written as CH3CO2H or C...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |