1. The coast and the strategic Atlantic ports
Ports Mauritania's Atlantic interface (Nouakchott and Nouadhibou) provides direct shipping access to Europe, America and West Africa – useful for export-oriented manufacturing, fishery processing and logistics.
2. Rich mineral endowment
The country has large deposits of iron ore and there is growing interest in gold, copper, phosphates and rare earths. These deposits form a solid foundation for mining services, beneficiation and subsequent industrial projects.
3. Abundant marine resources
Mauritania's productive coastal waters support strong fisheries and marine potential (fish, cephalopods and shrimp), making the country a natural , natural location for seafood processing, cold chain and aquaculture development.
4. Emerging energy opportunities
The discovery and exploration of offshore gas and the development of onshore renewable resources (solar, wind) create industrial prospects for energy and raw materials, including industrial energy supply and fertilizer/chemical production in the future.
5. The political focus on diversification and value addition
The government and development partners have shown interest in moving beyond raw material export to local processing, port-led logistics, agribusiness and tourism, supported by strategic project incentives.
1. Mining inputs
Large iron ore deposits around Zouerate and growing gold/copper exploration provide inputs for mineral processing, steel production and mining services (equipment, maintenance and beneficiation).
2. Fisheries and marine inputs
Fisheries on the extensive continental shelf provide raw materials for the fishmeal, canning, freezing, value-added seafood and aquaculture feed industries.
3. Pastoral and agricultural resources
While the southern and coastal areas are LARGELY dry, livestock (sheep, goats and camels) and irrigated agricultural areas suitable for milk and meat processing and value-added horticulture are supported by proper water management.
4. Renewable energy base
High solar radiation and offshore wind potential allow for the creation of large-scale solar and wind energy projects, distribution of production in the energy industry, and reduced dependence on imported fuels.
5. Logistics and port infrastructure
The railway lines of the main , main ports (Nouakchott and Nouadhibou) and the mining corridors already serve the national export flow; The development of port capacity and cold chain infrastructure would unlock much greater added value.
Entrepreneurs and investors should target sectors that (a) take advantage of local natural advantages, (b) increase local added value, and (c) serve export or regional markets:
1. Fisheries processing and cold chain logistics
2. Enrichment of minerals and light minerals
3. Renewable energy projects and energy services
4. Value chains of agricultural processing and livestock breeding
5. Ports, logistics services and re-export centers
6. Building materials and prefabrication
Mauritanian authorities and investment promotion bodies typically support strategic projects with measures such as:
Mauritania presents impressive investment examples for projects that take advantage of its marine wealth, mineral , mineral resources, coastal logistics and renewable energy , energy resources. The most effective opportunities are fishing and cold chain processing mineral beneficiation, renewable energy sources and port logistics – all of which increase export earnings and create local jobs.
Projects that combine onshore value addition, reliable (preferably green) energy supply and modern logistics are more likely to succeed. Through targeted public-private partnerships enhanced certification and improved port/cold chain , chain capacity Mauritania can expand its industrial base and become a stronger regional supplier of higher value goods.
Please choose a project below related to this category.
Copper is mankind’s oldest metal, dating back some 10,000 years. All of the great civilizations of the past used copper and copper alloys (principally...
|
Capacity : Copper Ingot: 8 MT/Day, Copper Rod: 36 MT/Day, Copper Wire: 4 MT/Day |
Plant and Machinery cost: Rs. 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 62.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : Rs. 1201 Lakhs |
|
Cost of Project : 120100000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : Syringes (2 ml) : 90 Lakh Nos. /Annum,Syringes (5 ml) : 90 Lakh Nos. /Annum |
Plant and Machinery cost: Rs. 245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 455 Lakhs |
|
Cost of Project : 45500000 |
Copper is one of the most widespread materials used in the production of electronic equipment and found in multiple appliances as, e.g. circuit boards...
|
Capacity : 10000 MT /Annum |
Plant and Machinery cost: Rs.132 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project : Rs.1208 Lakhs |
|
Cost of Project : 120800000 |
Phospho-gypsum is a by-product of the phosphoric acid industry and consists of 65-70 % gypsum, 25-30 % water and 5-10 % impurities, i.e. phosphoric ac...
|
Capacity : 600000 MT/annum |
Plant and Machinery cost: Rs 1008 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.89 |
|
Break Even Point (BEP): 43.92 |
TCI : Cost of Project: Rs. 3114 Lakhs |
|
Cost of Project : 311400000 |
As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals. It is either obtained from natural resource...
|
Capacity : 3000000 Ltrs. /Annum |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: 112 Lakhs |
|
Cost of Project : 11200000 |
It is an instrument which is used for injecting any liquid into the body of human beings or of animals. The Indian healthcare sector, including pharma...
|
Capacity : 180 Lakh Nos. /annum |
Plant and Machinery cost: Rs.245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project:Rs. 455 Lakhs |
|
Cost of Project : 45500000 |
Copper Sulphate is of topical interest in the sense that copper is important metal used in India from ancient times. Copper sulphate is widely used as...
|
Capacity : 600 Nos. /annum |
Plant and Machinery cost: Rs.43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs.238 Lakhs |
|
Cost of Project : 23800000 |
It is an instrument which is used for injecting any liquid into the body of human beings or of animals. These syringes are used for injecting the medi...
|
Capacity : 180 Lakh Nos. /annum |
Plant and Machinery cost: 245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: 455 Lakhs |
|
Cost of Project : 45500000 |
Copper (II) Sulfate is a chemical compound with the formula CuSO4. It occurs in nature as mineral hydrocyanite. It is gray to white and has rhombic cr...
|
Capacity : 600 Nos. /annum |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 238 Lakhs |
|
Cost of Project : 23800000 |
It is an instrument which is used for injecting any liquid into the body of human beings or of animals. These syringes are used for injecting the medi...
|
Capacity : 180 Lakh Nos. /annum |
Plant and Machinery cost: 245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: 455 Lakhs |
|
Cost of Project : 45500000 |
Copper (II) Sulfate is a chemical compound with the formula CuSO4. It occurs in nature as mineral hydrocyanite. It is gray to white and has rhombic cr...
|
Capacity : 600 Nos. /annum |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 238 Lakhs |
|
Cost of Project : 23800000 |
Phospho-gypsum is a by-product of the phosphoric acid industry and consists of 65-70 % gypsum, 25-30 % water and 5-10 % impurities, i.e. phosphoric ac...
|
Capacity : 600000 MT/annum |
Plant and Machinery cost: Rs 1008 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs. 3114 Lakhs |
|
Cost of Project : 311400000 |