Entrepreneurs should prioritise sectors that match resource availability, employ local labour, and add value close to source:
1. Agricultural processing and packaged foods
2. Bamboo processing and value-added products
3. Ecotourism, private accommodation and adventure services
4. Like, Herbal products, ayush , ayush and nutrients
5. Freshwater aquaculture and fishery processing
6. Renewable energy (small water and solar energy)
Meghalaya offers compelling high-impact opportunities for businesses that respect environmental boundaries while delivering value – particularly in agro-processing, bamboo value chains, eco-tourism, medicinal herbs/nutrients, small hydro and solar, handloom design and cold chain logistics. Cluster-based, community-inclusive and environmentally conscious projects bring strong social , social and economic returns: higher farmer incomes, job creation and sustainable regional exports.
Please choose a project below related to this category.
The mosquito repellent consists of a liquid mix that gets converted into vapors on moderate heating. These compounds vaporize without decomposition on...
|
Capacity : Mosquito Repellent Liquidator, Vaporiser 50 ml size PET Bottle: 2,400,000 Nos/annum |
Plant and Machinery cost: 18 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 291 lakhs |
|
Cost of Project : 29100000 |
Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing businesse...
|
Capacity : 1,500,000kgs/annum |
Plant and Machinery cost: 50 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : Rs 253 lakhs |
|
Cost of Project : 25300000 |
A hospitality unit such as a restaurant, hotel, or an amusement park consists of multiple groups such as facility maintenance and direct operations (s...
|
Capacity : 150 Nos of Room |
Plant and Machinery cost: 1940 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : Rs 4925 lakhs |
|
Cost of Project : 492500000 |
Readymade garments are a part of our daily life. Clothes are an epitome of a culture. People in different parts of the world have their own styles of...
|
Capacity : Readymade Garments (Jeans) :120,000 Nos/annum Buying House Commission Realisation: 300 Nos/annum |
Plant and Machinery cost: 556 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : Rs 384 lakhs |
|
Cost of Project : 38400000 |
Electricity play a vital role in the development and growth of Agriculture and Industry, as it is a high priority item for all the developing or devel...
|
Capacity : 3,500MT/Annum |
Plant and Machinery cost: 131 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 1010 Lakhs |
|
Cost of Project : 101000000 |
India is the still by and large vegetarian in dietary habit and heavily depends upon vegetative source to meet out its daily protein requirement. Indi...
|
Capacity : Black Gram Dal : 1800 MT/ annum Channa Dal :1800 MT/ annum Green Gram Dal :1800 MT/ annum Turdal :1800 MT/ annum |
Plant and Machinery cost: 104 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : Rs 221 lakhs |
|
Cost of Project : 22100000 |
Phenolic foam is a dense, lightweight and porous material that can be cut into virtually any shape. It holds its shape when wet and provides both wate...
|
Capacity : 3,600,000 Pcs/annum |
Plant and Machinery cost: 69 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs 270 lakhs |
|
Cost of Project : 27000000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : Dishwash Liquid:300,000Kgs/annum Dishwash Soap Bar :300,000 Kgs/annum Detergent Liquid :300,000 Kgs/annum Detergent Soap Bar :300,000 Kgs/annum Detergent Powder :300,000 Kgs/annum |
Plant and Machinery cost: 32 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : Rs 204 lakhs |
|
Cost of Project : 20400000 |
Extrusion-technology is gaining increasing popularity in the global agro-food processing industry, particularly in the food and feed sectors. Extrusio...
|
Capacity : Macaroni (500 gms Size) :225,000 Pkts/annum Vermicelli (500 gms Size) :225,000 Pkts/annum Noodles (500 gms Size):225,000 Pkts/annum Instant Noodles wit |
Plant and Machinery cost: 51 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 67.00 |
TCI : Cost of Project : Rs 103 lakhs |
|
Cost of Project : 10300000 |
Essential oils, also called volatile odoriferous oil, are aromatic oily liquids extracted from different parts of plants, for example, leaves, peels,...
|
Capacity : Jasmine Oil (5 ml Size Pack): 750Ltrs/annum Tuberose Oil (5 ml Size Pack): 750Ltrs/annum |
Plant and Machinery cost: 18 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 342lakhs |
|
Cost of Project : 342100000 |
Onion is one of the most important commercial vegetable crops grown in India. It contains vitamin B and a trace of vitamin C and also traces of iron a...
|
Capacity : Dehydrated Onion Sliced/Chopped: 1000Mt/annum Cattle Feed as by product : 700Mt/annum |
Plant and Machinery cost: 79 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 236 lakhs |
|
Cost of Project : 23600000 |
An electric motor is a device converting electrical energy into mechanical energy (usually a torque). This conversion is usually obtained through the...
|
Capacity : 60,000 Nos/annum |
Plant and Machinery cost: 60 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project: Rs 313 lakhs |
|
Cost of Project : 31300000 |