Entrepreneurs should prioritise sectors that match resource availability, employ local labour, and add value close to source:
1. Agricultural processing and packaged foods
2. Bamboo processing and value-added products
3. Ecotourism, private accommodation and adventure services
4. Like, Herbal products, ayush , ayush and nutrients
5. Freshwater aquaculture and fishery processing
6. Renewable energy (small water and solar energy)
Meghalaya offers compelling high-impact opportunities for businesses that respect environmental boundaries while delivering value – particularly in agro-processing, bamboo value chains, eco-tourism, medicinal herbs/nutrients, small hydro and solar, handloom design and cold chain logistics. Cluster-based, community-inclusive and environmentally conscious projects bring strong social , social and economic returns: higher farmer incomes, job creation and sustainable regional exports.
Please choose a project below related to this category.
Engineering education is the activity of teaching knowledge and principles related to the professional practice of engineering. It includes the initia...
|
Capacity : Aeronautical Engineering: 60 students/annum Mechanical Engineering: 60 students/annum Civil Engineering: 60 students/annum Aircraft Maintenance Engineering: 60 students/annum Air Hostage Training Course (6 Month Diploma):120 students/annum |
Plant and Machinery cost: Rs 623 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 93.00 |
TCI : Cost of Project: Rs 3336 lakhs |
|
Cost of Project : 333600000 |
Paracetamol, also known as acetaminophen or APAP, is a medication used to treat pain and fever. It is typically used for mild to moderate pain. It is...
|
Capacity : Paracetamol Tablets: 1500mt/annum Paracetamol Powder: 420mt/annum |
Plant and Machinery cost: Rs 349 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 863 lakhs |
|
Cost of Project : 86300000 |
Concrete poles were first used over 60 years ago and were then made of normal reinforced concrete. As technology improved, production and use of concr...
|
Capacity : Prestressed Concrete Cement Electric Poles: 60,000nos/annum |
Plant and Machinery cost: Rs 304 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 713 lakhs |
|
Cost of Project : 71300000 |
Warehousing refers to the activities involving storage of goods on a large-scale in asystematic and orderly manner and making them available convenien...
|
Capacity : Sacks Storage: 15000000 sacks/annum |
Plant and Machinery cost: Rs 177 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs 808 lakhs |
|
Cost of Project : 80800000 |
The custom of chewing breath fresheners after meals has a very long history, particularly in India. Pan Masala is a balanced mixture of betel leaf wit...
|
Capacity : Sada Pan Masala: 99000kgs/annum Meetha Pan Masala: 99000kgs/annum Zarda Pan Masala: 102000kgs/annum |
Plant and Machinery cost: Rs 35 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 226 lakhs |
|
Cost of Project : 22600000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica: 1500mt/annum Activated Carbon (by product): 420mt/annum Sodium Carbonate (by product): 630mt/annum |
Plant and Machinery cost: Rs 519 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.24 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 787 lakhs |
|
Cost of Project : 78700000 |
Pectin is a naturally occurring substance (a polysaccaride) found in all plant tissue, calcium pectin being present between the cell walls and serving...
|
Capacity : Pectin: 150,000Kgs/annum |
Plant and Machinery cost: Rs 1289 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: Rs 1660 lakhs |
|
Cost of Project : 166000000 |
Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded ma...
|
Capacity : 4800000 sq.ft. |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 391 lakhs |
|
Cost of Project : 39100000 |
Packing, in a way represents the extent of industrialization of a country. Packaging has been assuming importance in the context of growth of industri...
|
Capacity : Corrugated Cardboard Boxes: 12000mt/annum Printed Corrugated Cardboard Boxes: 6000mt/annum |
Plant and Machinery cost: Rs 3545 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 5726 lakhs |
|
Cost of Project : 572600000 |
The Indian healthcare industry is divided into two segments - services and manufacturing. While the manufacturing segment consists of medical equipmen...
|
Capacity : Gereral Ward Room: 23400 patients/annum Double Bed Room: 27000 patients/annum Single Bed Room: 9000 patients/annum O.P.D.: 25200 patients/annum Operated Patients: 1080 patients/annum Emergency Patients : 14400 patients/annum X-Ray: 18000 patients/annum |
Plant and Machinery cost: Rs 5289 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 2.69 |
|
Break Even Point (BEP): 23.00 |
TCI : Cost of Project: Rs 29196 lakhs |
|
Cost of Project : 2919600000 |
Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded ma...
|
Capacity : 4800000 sq.ft. |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 476 lakhs |
|
Cost of Project : 47600000 |
Cotton is considered as the white gold and king of fibrecrops.It is one of the most important commercial crops of India and is the single largest natu...
|
Capacity : Refined Cotton Seed Oil : 27000mt/annum Linter: 8100mt/annum DOC: 33750mt/annum Hulls: 40500mt/annum Soap Stock: 21600mt/annum Acid Oil |
Plant and Machinery cost: Rs 1474 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 3024 lakhs |
|
Cost of Project : 302400000 |