Entrepreneurs should prioritise sectors that match resource availability, employ local labour, and add value close to source:
1. Agricultural processing and packaged foods
2. Bamboo processing and value-added products
3. Ecotourism, private accommodation and adventure services
4. Like, Herbal products, ayush , ayush and nutrients
5. Freshwater aquaculture and fishery processing
6. Renewable energy (small water and solar energy)
Meghalaya offers compelling high-impact opportunities for businesses that respect environmental boundaries while delivering value – particularly in agro-processing, bamboo value chains, eco-tourism, medicinal herbs/nutrients, small hydro and solar, handloom design and cold chain logistics. Cluster-based, community-inclusive and environmentally conscious projects bring strong social , social and economic returns: higher farmer incomes, job creation and sustainable regional exports.
Please choose a project below related to this category.
The alcohol industry is the commercial industry involved in the manufacturing, distribution, and sale of alcoholic beverages. Alcohol has assumed very...
|
Capacity : Extra Neutral Alcohol (ENA) : 15,000KLs/Annum Distilleries Dry Grain with Solubles (DDGS) by product: 7,350MT/Annum Fusel Oil (by product) : 24KLs/Ann |
Plant and Machinery cost: Rs 4637 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 6572 lakhs |
|
Cost of Project : 657200000 |
Sheet metal is simply metal formed into thin and flat pieces. It is one of the fundamental forms used in metal working, and can be cut and bent into a...
|
Capacity : Auto Sheet Metal Components : 600MT/Annum Metal Scraps: 6MT/Annum |
Plant and Machinery cost: Rs 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs 176 lakhs |
|
Cost of Project : 17600000 |
A Carbon Fiber is a fibrous carbon material having a micro graphite crystal structure made by fibrillation of Acrylic resin, a well-known textile mate...
|
Capacity : 300,000 Kgs/Annum |
Plant and Machinery cost: Rs 111 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : Rs 451 lakhs |
|
Cost of Project : 45100000 |
Polyaluminium chloride (PAC) is a general name given to polyaluminium chloride compounds, namely polyaluminium chloride hydroxide and polyaluminium ch...
|
Capacity : Poly Aluminium Chloride Liquid Form: 16,500 MT/Annum Poly Aluminium Chloride Powder Form: 13,500 MT/Annum |
Plant and Machinery cost: Rs 1266 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 2418 lakhs |
|
Cost of Project : 241800000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica: 1200mt/annum Activated Carbon (by product): 336mt/annum Sodium Carbonate (by product): 504 mt/annum |
Plant and Machinery cost: Rs 556 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project : Rs 1200 lakhs |
|
Cost of Project : 120000000 |
Composite can is composed of a can body; - a top closure; and - a bottom closure. It is also sometimes called a Combi container. It has a convolute wo...
|
Capacity : 12,000,000/Annum |
Plant and Machinery cost: Rs 39 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 222 lakhs |
|
Cost of Project : 22200000 |
The materials now available for packaging are paper and paper products, metal containers and foils, glass, plastics-rigid and flexible, cellulose film...
|
Capacity : 600,000,000 Nos./Annum |
Plant and Machinery cost: Rs 75 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project: Rs 1474 lakhs |
|
Cost of Project : 147400000 |
Biofertilizers are cost effective, eco-friendly and when they are required in bulk can be generated at the farm itself. They increase crop yield upto...
|
Capacity : Bio Fertilizer (Liquid): 60,000 Ltrs/Annum Bio Fertilizer (solid):60,000 Kgs/Annum Micronutrients (Liquid): 48,000 Ltrs/Annum Micronutrients (solid): 60,000 Kgs/Annum Organic Fertlizier (Liquid):60,000 Ltrs/Annum Organic Fertlizier (Solid): 48,000 Kgs/Ann |
Plant and Machinery cost: Rs 42 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : Rs 122 lakhs |
|
Cost of Project : 12200000 |
Electric Resistance Welded (ERW) steel pipes and tubes are used in various engineering purposes, fencing, scaffolding, line pipes etc. ERW steel pipes...
|
Capacity : ERW Pipes (Black): 18000MT/Annum |
Plant and Machinery cost: Rs 1637 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs 3129 lakhs |
|
Cost of Project : 312900000 |
The Mega Food Park is an inclusive concept which is aimed at establishing direct linkages from the farm to processing and on to the consumer markets,...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls: 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue (100 Pcs.): 1,251,000 Nos./annum |
Plant and Machinery cost: Rs 59 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs 341 lakhs |
|
Cost of Project : 34100000 |
India is the still by and large vegetarian in dietary habit and heavily depends upon vegetative source to meet out its daily protein requirement. Indi...
|
Capacity : Pigeon peas : 4,000 MT/ annum Lentil: 4,000 MT/annum Chickpeas: 4,000 MT/annum |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project: Rs 542 lakhs |
|
Cost of Project : 54200000 |