Copper wire is an essential material for electrical cables, motor and transformer winding. It is available in different gauges. The gauge of the copp...
|
Capacity : 500 Kg. / Day |
Plant and Machinery cost: 68 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 167 Lakhs |
|
Cost of Project : 0 |
Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of t...
|
Capacity : 2.00 MT / Day |
Plant and Machinery cost: 31 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 1.26 Crore |
|
Cost of Project : 0 |
Copper is the perfect material for recycling. It is valuable, easy to identify, easy to clean, heavy and can be much use to foundries & other non-fer...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: 279 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 684 Lakh |
|
Cost of Project : 0 |
Disposable needle is widely used by doctors for injection purpose with the help of syringes. With the increase in population in our country, requirem...
|
Capacity : - |
Plant and Machinery cost: 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 426 Lakhs |
|
Cost of Project : 0 |
Enamelled copper wire is an essential material for motor and transformer winding. There is a heavy consumption of enamelled copper wire. Enamelled co...
|
Capacity : 2 MT / Day |
Plant and Machinery cost: 85 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 550 Lakhs |
|
Cost of Project : 0 |
Ongoing rise of Air Conditioners and Refrigerators in the market and production in GCC and other part of the world and Heat Transfer Systems in engine...
|
Capacity : 12000 TPA |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 65 Crores |
|
Cost of Project : 0 |
Ongoing rise of Air Conditioners and Refrigerators in the market and production in GCC and other part of the world and Heat Transfer Systems in engine...
|
Capacity : 12000 TPA |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 65 Crores |
|
Cost of Project : 0 |
Chromium is the 21st most abundant metal in the Earths crust. The only commercial ore of chromium is the chromite. Most chromite ores are rich enough...
|
Capacity : 30,000 MT/ Annum each ores |
Plant and Machinery cost: 896 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 3528 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productivity lower fuel consumption and improved furnac...
|
Capacity : 6000 MT / Annum |
Plant and Machinery cost: 187 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 479 Lakhs |
|
Cost of Project : 0 |
The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backing...
|
Capacity : - |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 125 Lakhs |
|
Cost of Project : 0 |
Copper is the most commonly used architectural metal now-a-days. Copper plays an essential role in the modern building. From recycled cladding and ro...
|
Capacity : 12 MT/day |
Plant and Machinery cost: 198 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 567 Lakhs |
|
Cost of Project : 0 |
Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is general...
|
Capacity : 60,000 MT / Annum |
Plant and Machinery cost: 4012 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 6454 Lakhs |
|
Cost of Project : 0 |