Best Business Opportunities in South Africa- Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

Please choose a project below related to this category.

COPPER FLATS AND COPPER TUBES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
COPPER FLATS AND COPPER TUBES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Copper is the most commonly used architectural metal now-a-days. Copper plays an essential role in the modern building. From recycled cladding and ro...

Capacity :

12 MT/day

Plant and Machinery cost:

198 Lakhs

Working Capital :

-

Rate of Return (ROR):

47.00

Break Even Point (BEP):

56.00

TCI :

Cost of Project : 567 Lakhs

Cost of Project :

0

MILD STEEL INGOTS FROM IRON ORE - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost & Revenue
MILD STEEL INGOTS FROM IRON ORE - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost & Revenue

Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is general...

Capacity :

60,000 MT / Annum

Plant and Machinery cost:

4012 Lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

30.00

TCI :

6454 Lakhs

Cost of Project :

0

Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the move...

Capacity :

30,000 Thousand Nos./Annum or 1,00,000 Bottles /day

Plant and Machinery cost:

Rs. 105 Lakhs

Working Capital :

-

Rate of Return (ROR):

44.00

Break Even Point (BEP):

63.00

TCI :

Cost of Project Rs. 282 Lakhs

Cost of Project :

0

Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Potable spring waters containing, sulphur iron, magnesium and other mineral salts occurring in certain regions are claimed to be beneficial to human m...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Concentrated Manganese Ore - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Concentrated Manganese Ore - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

India holds a leading position as a source of manganese ore. The output of this mineral being the third largest in the world. The ore occurs in vario...

Capacity :

7500 MT/Annum

Plant and Machinery cost:

Rs. 127 Lakhs

Working Capital :

-

Rate of Return (ROR):

42.00

Break Even Point (BEP):

40.00

TCI :

Cost of Project Rs. 656 Lakhs

Cost of Project :

65600000

Copper Wire Drawing, Annealing & Enamelling - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Copper Wire Drawing, Annealing & Enamelling - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Copper is the most used conducting metal. There is a good market for enameled copper wire in motors and transformers industries for winding and rewin...

Capacity :

1 MT / day

Plant and Machinery cost:

22 Lakhs

Working Capital :

-

Rate of Return (ROR):

47.00

Break Even Point (BEP):

34.00

TCI :

209 Lakhs

Cost of Project :

0

Bicycle Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Bicycle Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power de...

Capacity :

7000 Nos. / Day

Plant and Machinery cost:

5718 Lakhs

Working Capital :

-

Rate of Return (ROR):

41.00

Break Even Point (BEP):

47.00

TCI :

Cost of Project 7861 Lakhs

Cost of Project :

0

TRADING OF IRON ORES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
TRADING OF IRON ORES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally depen...

Capacity :

5000 MT/Day

Plant and Machinery cost:

Rs. 156 lakhs

Working Capital :

-

Rate of Return (ROR):

52.00

Break Even Point (BEP):

21.00

TCI :

Rs. 2396 lakhs

Cost of Project :

0

PACKAGED DRINKING WATER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
PACKAGED DRINKING WATER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of wate...

Capacity :

10000 Ltrs./day

Plant and Machinery cost:

Rs. 60 lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

40.00

TCI :

Rs. 180 lakhs

Cost of Project :

0

FERRO ALLOYS OF NIOBIUM, MOLYBDENUM, TITANIUM, TUNGSTEN AND VANADIUM - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
FERRO ALLOYS OF NIOBIUM, MOLYBDENUM, TITANIUM, TUNGSTEN AND VANADIUM - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

Ferro Alloys are the principal alloying agents in iron and steel production. Addition of ferro alloys improves mechanical and physical properties of i...

Capacity :

5 MT/Day

Plant and Machinery cost:

Rs. 2 crores

Working Capital :

-

Rate of Return (ROR):

50.00

Break Even Point (BEP):

41.00

TCI :

Rs. 5 crores

Cost of Project :

0

COMPACT COPPER TUBE LIGHT CHOKE - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost & Revenue
COMPACT COPPER TUBE LIGHT CHOKE - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost & Revenue

This is a most important instrument for tube light. Energy transmission is totally depending on the formation of choke. Self-life of the tube light i...

Capacity :

1000 Nos./Day

Plant and Machinery cost:

6 Lakh

Working Capital :

-

Rate of Return (ROR):

47.00

Break Even Point (BEP):

38.00

TCI :

83 Lakh

Cost of Project :

0

SILVER EXTRACTION FROM WASTE HYPO SOLUTION, X-RAY FILM, COLOUR PAPER BLEACH, CINEMA FILMS ETC. (BY CHEMICAL PROCESS) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process
SILVER EXTRACTION FROM WASTE HYPO SOLUTION, X-RAY FILM, COLOUR PAPER BLEACH, CINEMA FILMS ETC. (BY CHEMICAL PROCESS) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process

Hypo solution contains a good percentage of silver, which can be extracted either by chemical or electrolytic method. The extraction of silver from h...

Capacity :

2 Kg./Day

Plant and Machinery cost:

23 Lakhs

Working Capital :

-

Rate of Return (ROR):

45.00

Break Even Point (BEP):

43.00

TCI :

62 Lakhs

Cost of Project :

0

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp