Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : - |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 595 Lakhs |
|
Cost of Project : 59500000 |
Marble is a non-foliated metamorphic rock composed of recrystallized carbonate minerals, most commonly calcite or dolomite. Geologists use the term ma...
|
Capacity : -- |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : - |
|
Cost of Project : 0 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |
The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by the...
|
Capacity : 1354 Lakh Pcs./annum |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.87 |
|
Break Even Point (BEP): 45.83 |
TCI : 216 Lakhs |
|
Cost of Project : 0 |
Gypsum board, also known as drywall or plaster board, consists of a core of gypsum surrounded with a paper covering. Several varieties of gypsum board...
|
Capacity : 6600 No.s/day |
Plant and Machinery cost: 192 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 26.11 |
|
Break Even Point (BEP): 61.30 |
TCI : Cost of Project : 551 lakh |
|
Cost of Project : 55100000 |
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b...
|
Capacity : - |
Plant and Machinery cost: 131 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 350 Lakh |
|
Cost of Project : 35000000 |
Profile Single super phosphate is a highly demanded fertilizer mostly used at the time of preparation of land. It comprises of 16% water soluble phos...
|
Capacity : 150000 MT/ Annum |
Plant and Machinery cost: 1621 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 2998 Lakh |
|
Cost of Project : 299800000 |
Product Profile Lithium hexafluorophosphate (LiPF6) is a typical electrolyte salt for lithium-ion batteries. Lithium hexafluorophosphate is an inorga...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 0.01 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
PRODUCT PROFILE: Sodium triphosphate (STP) is an inorganic compound with formula Na5P3O10. It is the sodiumsalt of the polyphosphate penta anion, w...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67 to 72% Fe an...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67-72% Fe and v...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |