Please choose a project below related to this category.
The primary objective of the study is to review the technological status of ferroalloys industry in the country in the area of bulk production of sil...
|
Capacity : 12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day |
Plant and Machinery cost: 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project : 242 Lakhs |
|
Cost of Project : 0 |
Bottled water industry, colloquially called, the mineral water industry, is a symbol of new life style emerging in India. While a large segment of th...
|
Capacity : - |
Plant and Machinery cost: 403 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 695 Lakhs |
|
Cost of Project : 69500000 |
-
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 13 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 18 Crores |
|
Cost of Project : 0 |
-
|
Capacity : 2 MT/Day |
Plant and Machinery cost: Rs. 35 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Rs. 176 Lakhs |
|
Cost of Project : 0 |
Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discarded...
|
Capacity : Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.T-270 Kg/Day,Other Metals-800 Kg/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs |
|
Cost of Project : 0 |
Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries. I...
|
Capacity : 1200 Cubic Meter/Day |
Plant and Machinery cost: 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 68 Lakhs |
|
Cost of Project : 0 |
E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and fax...
|
Capacity : Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.T-270 Kg/Day, Other Metals-800 Kg/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs |
|
Cost of Project : 0 |
The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now a...
|
Capacity : 150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates |
Plant and Machinery cost: 34 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 104 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 32,000 Ltrs/Day |
Plant and Machinery cost: 221 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 327 Lakhs |
|
Cost of Project : 32700000 |
Almost a decade ago, the introduction of bottled water or packaged water has changed the traditional of serving and consuming drinking water. Accordin...
|
Capacity : 128000 Packs/Day |
Plant and Machinery cost: 219 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 323 Lakhs |
|
Cost of Project : 32300000 |
-
|
Capacity : 7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day |
Plant and Machinery cost: Rs. 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 135 Lakhs |
|
Cost of Project : 0 |
Single Super Phosphate (SSP) Fertilizer industry is the pioneering fertilizer industry in the country and the first SSP plant is said to have been es...
|
Capacity : 66000.00 MT/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 20 crores |
|
Cost of Project : 0 |