Please choose a project below related to this category.
It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind inc...
|
Capacity : Packaged Drinking Water (1 Ltr. Size):120000 |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs 268 Lakhs |
|
Cost of Project : 26800000 |
Parboiled rice, popularly known as “ushna” rice in boiled form. India contributes about one-third of the world acreage under rice. Rice is available i...
|
Capacity : Parboiled Rice :80 MT/Day •Broken Rice:6 MT/Day •Rice Bran by product:6 MT/Day •Rice Husk by product:19 MT/Day |
Plant and Machinery cost: Rs 677 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs 1290 Lakhs |
|
Cost of Project : 129000000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica:10MT/Day •CaCO3 (by product):20.6MT/Day |
Plant and Machinery cost: Rs 864 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1255 Lakhs |
|
Cost of Project : 125500000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
Spinning is a major part of the textile industry. It is part of the textile manufacturing process where three types of fibre are converted into yarn,...
|
Capacity : 30s Combed Cotton Yarn:19.80 MT/Day •Cotton Waste Comber Noil:3.10 MT/Day •Cotton Waste Carding:1.91 MT/Day |
Plant and Machinery cost: Rs 7564 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.96 |
|
Break Even Point (BEP): 45.39 |
TCI : Cost of Project:Rs 10685 Lakhs |
|
Cost of Project : 1068500000 |
Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice straw a...
|
Capacity : •Disposable Paper Cups :7.5 MT/Day •Disposable Paper Plates:7.5 MT/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 56.37 |
TCI : Cost of Project: Rs 314 Lakhs |
|
Cost of Project : 31400000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. Technical textiles are defined as textile materials and pr...
|
Capacity : Sanitary Napkins Ultra Thin Type: 15000 Pkts/Day, Sanitary Napkins Cotton Core Type: 15000 Pkts/Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.92 |
|
Break Even Point (BEP): 40.85 |
TCI : Cost of Project : Rs 755 Lakhs |
|
Cost of Project : 75500000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
‘‘Cotton’ the white gold is one of the most important commercial; crops playing a key role in the economical, political and social affairs of the cou...
|
Capacity : Cotton Yarn: 24 MT/Day |
Plant and Machinery cost: Rs 4112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 5426 Lakhs |
|
Cost of Project : 542600000 |
Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |