A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy. Solar panels generate free power fr...
|
Capacity : Poly Crystaline Solar PV Modules (10, 20, 50,100 & 300 Watt): 74,00,000 Nos per annum Solar Inverters (Grid Tie String Inverters 1, 10, 30, 50 & 60 KVA) & (Solar Hydrid Inverters 1, 30, 60, 100 & 120 KVA: 7200 Nos per annum Solar Pump Controller |
Plant and Machinery cost: 2162.88 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project: Rs. 21918 |
|
Cost of Project : 2191800000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica: 3,000 MT/Annum Activated Carbon (by product): 810MT/Annum Sodium Carbonate (by product): 1,200MT/Annum |
Plant and Machinery cost: Rs. 526 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs. 786 lakhs |
|
Cost of Project : 78600000 |
Dairy farming has been part of agriculture for thousands of years, but historically, it was usually done on a small scale on mixed farms.But today, In...
|
Capacity : Milk: 1,800,000 Ltrs/Annum Curd : 360,000 Ltrs /Annum Butter Milk: 345,600 Ltrs /Annum Cheese: 36,000 kg /Annum Ghee: 14,400 |
Plant and Machinery cost: Rs. 581 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs. 2047 lakhs |
|
Cost of Project : 204700000 |
Cycling is amongst the most sustainable modes of mobility, which has zero dependence on fossil fuels and zero emissions unlike the motorized modes of...
|
Capacity : Bicycle Tyres : 450000 Pcs/annum Bicycle Tubes : 450000 Pcs/annum |
Plant and Machinery cost: 405 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: 646 lakhs |
|
Cost of Project : 64600000 |
For many years throughout the world, poles made of wood, steel, and concrete have been used to support power transmission, telephone and telegraph lin...
|
Capacity : 200 Nos/day |
Plant and Machinery cost: 303 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project: 1401 lakhs |
|
Cost of Project : 140100000 |
India is one of the largest producers of potato. Besides being used as a daily food item in various vegetable preparations, potato today increasingly...
|
Capacity : Sweet potato: 120 kg/day Beat root: 80 kg/day Beans chips: 266 kg/day |
Plant and Machinery cost: Rs 83 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 209 Lakhs |
|
Cost of Project : 20900000 |
Solar Panels are in general Silicon made Rectangular Shaped Glass Covered Products which Produce Electricity when exposed to the Sun. These Panels pro...
|
Capacity : Solar PV Module (240 watt) : 350 Nos/day (25 MW) |
Plant and Machinery cost: Rs 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of project: Rs 852 Lakhs |
|
Cost of Project : 85200000 |
Coir as a natural organic product is organically biodegradable. The Fiber is hard and strong and decomposes slowly, making it perfectly suited for use...
|
Capacity : 6.5 MT/Day |
Plant and Machinery cost: Rs 654 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.93 |
|
Break Even Point (BEP): 50.48 |
TCI : Cost of Project:Rs 1149 Lakhs |
|
Cost of Project : 114900000 |
The health food drink market in India is approx. 300,000 MT per annum and is growing at the rate of around 15% per annum. The health food drinks are p...
|
Capacity : 30 MT/Day |
Plant and Machinery cost: Rs 284 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.54 |
|
Break Even Point (BEP): 55.85 |
TCI : Cost of Project:Rs 1024 Lakhs |
|
Cost of Project : 102400000 |
Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...
|
Capacity : Micronutrients Fertilizer for Banana:500 Kgs/Day •Micronutrients Fertilizer for Vegetables:500 Kgs/Day •Micronutrients Fertilizer for Citrus: 500 Kgs/Day |
Plant and Machinery cost: Rs 7 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project:Rs 30 Lakhs |
|
Cost of Project : 3000000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica:10 MT/Day • CaCO3 (by product):20.6 MT/Day |
Plant and Machinery cost: Rs 864 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1255 Lakhs |
|
Cost of Project : 125500000 |
Polymer, that are cheaper and lighter than many materials, are being favored for industrial and commercial applications. Plastics are necessary in dai...
|
Capacity : Bio-Degradable Plastic Polymer 33.33 MT/Day |
Plant and Machinery cost: Rs 5547 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.13 |
|
Break Even Point (BEP): 42.83 |
TCI : Cost of Project : Rs 7170 Lakhs |
|
Cost of Project : 717000000 |