Best Business Opportunities in Togo, Africa- Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

Best Business Opportunities in Togo, Africa- Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

Please choose a project below related to this category.

Dental Materials (Alginate, GI Cement, Composite Resin & Polycarboxylate Cement)
Dental Materials (Alginate, GI Cement, Composite Resin & Polycarboxylate Cement)

A dental impression is a negative imprint of hard (teeth) and soft tissues in the mouth from which a positive reproduction (cast or model) can be form...

Capacity :

Composite Resin Poly Carboxylate Cement (500 gms Pack): 80 Packs/ Day Glass Ionomer Cement (15 gms Packs with 10 gm Liquid): 1333 Packs/ Day Composite Resin Poly Carboxylate Cement (500 gms Pack):40 Packs/ Day

Plant and Machinery cost:

26 lakhs

Working Capital :

-

Rate of Return (ROR):

33.00

Break Even Point (BEP):

75.00

TCI :

Cost of Project: Rs 71 lakhs

Cost of Project :

7100000

Cotton Ball (Hospital and Cosmetic Use)
Cotton Ball (Hospital and Cosmetic Use)

A cotton ball is a ball of soft fiber that is primarily used for medical or cosmetic purposes, but can be used for other purposes such as arts and cra...

Capacity :

1,200 Pkts/Day

Plant and Machinery cost:

43 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

72.00

TCI :

Cost of Project: Rs 86 lakhs

Cost of Project :

8600000

Bicycle Manufacturing
Bicycle Manufacturing

Bicycles are one of the oldest forms of transportation. Even today millions of people travel by bicycle daily to their work, college, universities and...

Capacity :

Bicycles (Different Sizes): 2000 Nos./day

Plant and Machinery cost:

336 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

56.00

TCI :

Cost of Project: Rs 1589 lakhs

Cost of Project :

158900000

E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...

Capacity :

Copper Wire:1.67 MT/day Plastic Granules:7.43 MT/day Glass :3.23 MT/day Ferrous Metal

Plant and Machinery cost:

131 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

30.00

TCI :

Cost of Project: Rs 1272 lakhs

Cost of Project :

127200000

Surgical Cotton
Surgical Cotton

Cotton is a soft, staple fiber that grows in a form known as a boll around the seeds of the cotton plant, as shrub native to tropical and subtropical...

Capacity :

1300 Kgs/day

Plant and Machinery cost:

191 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

64.00

TCI :

Cost of Project: Rs 278 lakhs

Cost of Project :

27800000

Ethanol from Rice Straw and Rice Bran
Ethanol from Rice Straw and Rice Bran

Ethanol is a clear, colorless liquid rapidly absorbed from the gastrointestinal tract and distributed throughout the body. It has bactericidal activit...

Capacity :

40 KL. /day

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

46.00

TCI :

-

Cost of Project :

0

Furfural from Bagasse and Corncobs
Furfural from Bagasse and Corncobs

Furfural is produced from agricultural waste biomass that contain pentosans, which are aldose to sugars, composed of small rings formed from short fiv...

Capacity :

4000 Kgs. /Day

Plant and Machinery cost:

168 lakhs

Working Capital :

-

Rate of Return (ROR):

17.00

Break Even Point (BEP):

68.00

TCI :

Cost of Project :444 lakhs

Cost of Project :

44400000

Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...

Capacity :

25,000 KW/annum

Plant and Machinery cost:

449 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

47.00

TCI :

Cost of Project 1126 lakhs

Cost of Project :

112600000

Solar Panel & Electronic Toys
Solar Panel & Electronic Toys

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...

Capacity :

SOLAR PANEL:25,000Units/annumELECTRONIC TOYS:1,500,000 Units/annum

Plant and Machinery cost:

498 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

50.00

TCI :

Cost of Project: Rs 1348 lakhs

Cost of Project :

0

E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...

Capacity :

7500 MT/annum

Plant and Machinery cost:

131 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

30.00

TCI :

Cost of Project: 272 lakhs

Cost of Project :

127200000

Disposable Products	 (Thermocol Plate, Dona, Thali and Glass, Paper Coffee and Pepsi Glass, Silver Coated Dona, Plates and Spoons, Plastic Glass and Spoon, Tissue Paper)
Disposable Products (Thermocol Plate, Dona, Thali and Glass, Paper Coffee and Pepsi Glass, Silver Coated Dona, Plates and Spoons, Plastic Glass and Spoon, Tissue Paper)

Disposable cups, glasses, plates and spoons are used in daily life nowadays. In addition to be used at home these are largely used during at parties a...

Capacity :

Thermocol Plates: 15,000 Th. Nos/annum Thermocol Dona: 15,000 Th. Nos/annum ThermocolThali:15,000 Th. Nos/annum Thermocol Glass:15,000 Th. Nos/annum Paper

Plant and Machinery cost:

Rs 105 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

57.00

TCI :

Cost of Project: Rs 405 lakhs

Cost of Project :

40500000

Surgical Cotton
Surgical Cotton

Surgical cotton is also known as absorbent cotton” or “cotton wool”. Surgical/Absorbent cotton is cleared de-oiled and bleached cotton packed in diffe...

Capacity :

Surgical Cotton :300,000kgs/annum

Plant and Machinery cost:

Rs 69 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

57.00

TCI :

Cost of Project: Rs 238 lakhs

Cost of Project :

23800000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp