Please choose a project below related to this category.
E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to conventional rickshaws, and economically better than auto...
|
Capacity : E Rickshaw: 4 Nos./Day |
Plant and Machinery cost: Rs. 28 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 323 lakhs |
|
Cost of Project : 32300000 |
White cement is typically specified to ensure clean, bright, consistent colors, including light pastels. White cement allows a wide range of color opt...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
An automotive battery is a rechargeable battery that supplies electrical current to a motor vehicle. Its main purpose is to feed the starter, which st...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Cement paint is water based paint and is applied to either exterior or interior including brick work and concrete. It is used for painting exterior wa...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Cocoa butter is a pure, stable fat that is pressed out of cacao beans. It is considered a vegetable fat. It is also vegan and contains no dairy produc...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Marbles are small balls of colored or decorated glass which are either intended for playing the ancient game of marbles or as collector's items. They...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle Assembling Industry E-Rickshaws are small vehicles, with thr...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, this is eco-friendly vehicles for...
|
Capacity : 1,200 Nos per Annum |
Plant and Machinery cost: 29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 324 Lakhs |
|
Cost of Project : 32400000 |
A solar panel is a collection of solar cells.Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar ph...
|
Capacity : Solar Panel: 25 MW |
Plant and Machinery cost: Rs. 161 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs.804 lakhs |
|
Cost of Project : 80400000 |
Production of Rice Bran Oil with Rice Mill and Captive Power Plant (Integrated Unit). Business Opportunities in Rice Processing Industry Rice, edib...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Brown rice (malt) syrup, also known as rice syrup or rice malt, is a sweetener which is rich in compounds categorized as sugars and is derived by cult...
|
Capacity : 80 MT/Day |
Plant and Machinery cost: 1129 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs 2894 lakhs |
|
Cost of Project : 289400000 |
Bio-fertilizers are selective live micro-organism like bacteria, fungi and algae. They provide a cost effective, eco-friendly & renewable source of nu...
|
Capacity : Bio Fertilizer (Liquid) : 1000 Kgs./Day Bio Fertilizer (Solid) : 1000 Kgs./Day Micronutrients (Liquid) : 1000 Kgs./Day Micronutrients (Solid): 1000 Kgs./Day Organic Fertlizier (Liquid): 1000 Kgs./Day Organic Fertlizier (Solid):1000 Kgs./Day |
Plant and Machinery cost: 183 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs 492 lakhs |
|
Cost of Project : 49200000 |