Please choose a project below related to this category.
Potable spring waters containing, sulphur iron, magnesium and other mineral salts occurring in certain regions are claimed to be beneficial to human m...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
It is an important structural & ornamental stone because of its higher compressive strength & durability, is extensively used for massive structural...
|
Capacity : 30000 Sq. Mtr./Annum |
Plant and Machinery cost: 196 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 78.00 |
TCI : Cost of Project 293 Lakhs |
|
Cost of Project : 29300000 |
As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power de...
|
Capacity : 7000 Nos. / Day |
Plant and Machinery cost: 5718 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 7861 Lakhs |
|
Cost of Project : 0 |
Mill and straw boards are thicker, heavier and less flexible than the convention paper. The thickness of board is the thickness of a single sheet boar...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 39 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs.169 lakhs |
|
Cost of Project : 0 |
Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of wate...
|
Capacity : 10000 Ltrs./day |
Plant and Machinery cost: Rs. 60 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 180 lakhs |
|
Cost of Project : 0 |
There are hundreds of commercial varieties of cassava in various equatorial regions. These varieties fall into two main categories: Manihot palmate an...
|
Capacity : (Cassava Flour 3000, Starch 30000, Gari 1500, Cuscus 1500) MT / Annum |
Plant and Machinery cost: Rs. 400 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 84.00 |
TCI : Cost of Project : Rs. 1500 Lacs |
|
Cost of Project : 0 |
Charcoal is produced in kilns and retorts. The thermal decomposition of wood in a kiln with a controlled air supply produces charcoal. The gaseous pro...
|
Capacity : 50 MT/day |
Plant and Machinery cost: Rs. 190 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs. 845 lakhs |
|
Cost of Project : 0 |
Rice is basically sources of starch content little amount of fat and protein in it. It contains also vitamins and minerals. Basic raw materials requir...
|
Capacity : 30000 MT/Annum |
Plant and Machinery cost: 664 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project 1107 Lakhs |
|
Cost of Project : 0 |
A larger part of the average family's food bill goes on protein foods e.g. cheese, eggs and fish etc., which are important parts of a healthy and well...
|
Capacity : 4 Ton/Day |
Plant and Machinery cost: Rs. 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |
Water resistance or proofing is an important factor in health and comfort of building occupants. Water proof construction implies the use of a membran...
|
Capacity : 100 Kg./Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 11 Lakhs |
|
Cost of Project : 0 |
Soyabean is one of the most important agro based product, which has commercial value after rice, wheat, maize etc. It has commercial value in the fiel...
|
Capacity : (5 MT Soyabean Oil, 1 MT Soya Paneer, 1 MT Soya Extract) Per Day |
Plant and Machinery cost: 66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 63.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 303 Lakhs |
|
Cost of Project : 0 |
PP BAGS FOR CEMENT PP/HDPE oriented sacks are becoming popular through out the world. This is because they are chemically inert & are water repellen...
|
Capacity : 120 Lakh Bags/Annum |
Plant and Machinery cost: 230 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 425 Lakhs |
|
Cost of Project : 42500000 |