Rice is basically sources of starch content little amount of fat and protein in it. It contains also vitamins and minerals. Basic raw materials requir...
|
Capacity : 30000 MT/Annum |
Plant and Machinery cost: 664 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project 1107 Lakhs |
|
Cost of Project : 0 |
A larger part of the average family's food bill goes on protein foods e.g. cheese, eggs and fish etc., which are important parts of a healthy and well...
|
Capacity : 4 Ton/Day |
Plant and Machinery cost: Rs. 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |
Water resistance or proofing is an important factor in health and comfort of building occupants. Water proof construction implies the use of a membran...
|
Capacity : 100 Kg./Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 11 Lakhs |
|
Cost of Project : 0 |
Soyabean is one of the most important agro based product, which has commercial value after rice, wheat, maize etc. It has commercial value in the fiel...
|
Capacity : (5 MT Soyabean Oil, 1 MT Soya Paneer, 1 MT Soya Extract) Per Day |
Plant and Machinery cost: 66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 63.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 303 Lakhs |
|
Cost of Project : 0 |
PP BAGS FOR CEMENT PP/HDPE oriented sacks are becoming popular through out the world. This is because they are chemically inert & are water repellen...
|
Capacity : 120 Lakh Bags/Annum |
Plant and Machinery cost: 230 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 425 Lakhs |
|
Cost of Project : 42500000 |
Rice bran is the most important source of edible oil among the unconventional sources. Production of rice bran oil is currently estimated at about 2 l...
|
Capacity : 280 MT./day |
Plant and Machinery cost: 789 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 28.00 |
TCI : 6290 Lakhs |
|
Cost of Project : 0 |
Plastic floor tiles are known for some time Artificial synthetic marble the invention of the developing affordable resort, virtually replacing the use...
|
Capacity : 3.00 MT/day |
Plant and Machinery cost: Rs. 29 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 154 lakhs |
|
Cost of Project : 0 |
The asbestos sheet was first manufactured in 1914 in Japan. Since then improvement have been repeatedly made in the quality, shape and manufacturing p...
|
Capacity : 1000 NOS./day |
Plant and Machinery cost: Rs. 81 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 291 lakhs |
|
Cost of Project : 0 |
There is large use of animal feed in India, Middle East and also in the European Countries. It will help to increase the animal health. Most of the ra...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 70 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 480 Lacs |
|
Cost of Project : 0 |
Corn flakes being one of the most nutritious food and is consumed as breakfast food not only in India but elsewhere in the world. Basically it is prep...
|
Capacity : 5 Tones/Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 324 Lakhs |
|
Cost of Project : 0 |
Fuel bricks from the different raw materials now a days are very popular for the resources of renewable energy. There is great efforts have been taken...
|
Capacity : 3600 MT/Annum |
Plant and Machinery cost: 3 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 53.00 |
TCI : 52 Lakhs |
|
Cost of Project : 0 |
Rice husk gives a good quality of pozzolanio ash containing silica, which is considered a good substitute for cement. It is prepared by first burning...
|
Capacity : 50 MT/day |
Plant and Machinery cost: Rs. 98 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Rs. 203 Lakhs |
|
Cost of Project : 0 |