Please choose a project below related to this category.
Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries. I...
|
Capacity : 1200 Cubic Meter/Day |
Plant and Machinery cost: 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 68 Lakhs |
|
Cost of Project : 0 |
E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and fax...
|
Capacity : Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.T-270 Kg/Day, Other Metals-800 Kg/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs |
|
Cost of Project : 0 |
The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now a...
|
Capacity : 150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates |
Plant and Machinery cost: 34 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 104 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 32,000 Ltrs/Day |
Plant and Machinery cost: 221 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 327 Lakhs |
|
Cost of Project : 32700000 |
Almost a decade ago, the introduction of bottled water or packaged water has changed the traditional of serving and consuming drinking water. Accordin...
|
Capacity : 128000 Packs/Day |
Plant and Machinery cost: 219 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 323 Lakhs |
|
Cost of Project : 32300000 |
-
|
Capacity : 7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day |
Plant and Machinery cost: Rs. 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 135 Lakhs |
|
Cost of Project : 0 |
Single Super Phosphate (SSP) Fertilizer industry is the pioneering fertilizer industry in the country and the first SSP plant is said to have been es...
|
Capacity : 66000.00 MT/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 20 crores |
|
Cost of Project : 0 |
Single Super Phosphate (SSP) Fertilizer industry is the pioneering fertilizer industry in the country and the first SSP plant is said to have been es...
|
Capacity : 10 MT S.S.P. (GRANULAR)per/day, 10 MT N.P.K.(MIXTURE)per/day |
Plant and Machinery cost: 127 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 456 Lakhs |
|
Cost of Project : 0 |
Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a co...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : Rs. 282 Lakhs |
|
Cost of Project : 28200000 |
Soaps are the earliest form of detergents. Though at present the term detergent is used for synthetic detergent derived from petroleum products. The o...
|
Capacity : Detergent Cake, Powder, Dish washing Cake & Powder Each 1 MT/Day = 4 MT/Day |
Plant and Machinery cost: 28 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 239 Lakh |
|
Cost of Project : 0 |
Dicalcium phosphate is of great interest to tooth paste manufactures. It is used in toothpaste in its anhydrous variety. Although this product is not...
|
Capacity : 3000 MT/Year |
Plant and Machinery cost: 11 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project : 13.6 Crores |
|
Cost of Project : 0 |
Matchbox is one of the most important items. Though it is looked upon as small and insignificant, earlier it was a big problem. In the 17th century,...
|
Capacity : 50000 Nos. /Day |
Plant and Machinery cost: Rs. 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Rs. 29 Lakhs |
|
Cost of Project : 0 |