Best Business Opportunities in Western Sahara, Africa- Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

Please choose a project below related to this category.

Detergent cake, Powder and Dish washing Detergent cake and Powder - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
Detergent cake, Powder and Dish washing Detergent cake and Powder - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

Soaps are the earliest form of detergents. Though at present the term detergent is used for synthetic detergent derived from petroleum products. The o...

Capacity :

Detergent Cake, Powder, Dish washing Cake & Powder Each 1 MT/Day = 4 MT/Day

Plant and Machinery cost:

28 Lakh

Working Capital :

-

Rate of Return (ROR):

47.00

Break Even Point (BEP):

37.00

TCI :

239 Lakh

Cost of Project :

0

DICALCIUM PHOSPHATE (DENTIFRICE GRADE) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
DICALCIUM PHOSPHATE (DENTIFRICE GRADE) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Dicalcium phosphate is of great interest to tooth paste manufactures. It is used in toothpaste in its anhydrous variety. Although this product is not...

Capacity :

3000 MT/Year

Plant and Machinery cost:

11 Crores

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

32.00

TCI :

Cost of Project : 13.6 Crores

Cost of Project :

0

MATCHBOX - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
MATCHBOX - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Matchbox is one of the most important items. Though it is looked upon as small and insignificant, earlier it was a big problem. In the 17th century,...

Capacity :

50000 Nos. /Day

Plant and Machinery cost:

Rs. 5 Lakhs

Working Capital :

-

Rate of Return (ROR):

46.00

Break Even Point (BEP):

52.00

TCI :

Rs. 29 Lakhs

Cost of Project :

0

MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials

Disposable needle is widely used by doctors for injection purpose with the help of syringes. With the increase in population in our country, requirem...

Capacity :

-

Plant and Machinery cost:

147 Lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

47.00

TCI :

Cost of Project : 426 Lakhs

Cost of Project :

0

Fish Farming - Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Cost of Project
Fish Farming - Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Cost of Project

Now-a-days people are turning to fresh-water fish such as rainbow trout, carp & tench. These fish make an attractive substitute for the unproductive...

Capacity :

4.00 Ton /Day

Plant and Machinery cost:

82 Lakhs

Working Capital :

-

Rate of Return (ROR):

53.00

Break Even Point (BEP):

31.00

TCI :

558 Lakhs

Cost of Project :

0

SINGLE SUPER PHOSPHATE & MIXED FERTILIZER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
SINGLE SUPER PHOSPHATE & MIXED FERTILIZER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Broadly speaking a fertilizer or manure, may be interpreted to mean anything that will increase the yield of a crop is added to the soil. Generally...

Capacity :

20 Ton / Day

Plant and Machinery cost:

100 Lakh

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

38.00

TCI :

468 Lakh

Cost of Project :

0

FISH OIL (Production and Refining) with Fish Meal - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study,Investment Opportunities
FISH OIL (Production and Refining) with Fish Meal - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study,Investment Opportunities

Fish is used as a source of food either in raw or dry state. It has protein which is amino acids. Another means of utilization of fish is the manufact...

Capacity :

1 MT/day Fish Oil. 2.3 MT/day Fish Meal.

Plant and Machinery cost:

63 Lakhs

Working Capital :

-

Rate of Return (ROR):

48.00

Break Even Point (BEP):

34.00

TCI :

219 Lakhs

Cost of Project :

0

Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials

The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backing...

Capacity :

-

Plant and Machinery cost:

43 Lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

54.00

TCI :

Cost of Project : 125 Lakhs

Cost of Project :

0

Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the move...

Capacity :

30,000 Thousand Nos./Annum or 1,00,000 Bottles /day

Plant and Machinery cost:

Rs. 105 Lakhs

Working Capital :

-

Rate of Return (ROR):

44.00

Break Even Point (BEP):

63.00

TCI :

Cost of Project Rs. 282 Lakhs

Cost of Project :

0

Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Potable spring waters containing, sulphur iron, magnesium and other mineral salts occurring in certain regions are claimed to be beneficial to human m...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Bicycle Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Bicycle Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power de...

Capacity :

7000 Nos. / Day

Plant and Machinery cost:

5718 Lakhs

Working Capital :

-

Rate of Return (ROR):

41.00

Break Even Point (BEP):

47.00

TCI :

Cost of Project 7861 Lakhs

Cost of Project :

0

PACKAGED DRINKING WATER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
PACKAGED DRINKING WATER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of wate...

Capacity :

10000 Ltrs./day

Plant and Machinery cost:

Rs. 60 lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

40.00

TCI :

Rs. 180 lakhs

Cost of Project :

0

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp