Please choose a project below related to this category.
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day) |
Plant and Machinery cost: 104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 255 Lakhs |
|
Cost of Project : 25500000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day) |
Plant and Machinery cost: 104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 255 Lakhs |
|
Cost of Project : 25500000 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : - |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 595 Lakhs |
|
Cost of Project : 59500000 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |
The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by the...
|
Capacity : 1354 Lakh Pcs./annum |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.87 |
|
Break Even Point (BEP): 45.83 |
TCI : 216 Lakhs |
|
Cost of Project : 0 |
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b...
|
Capacity : - |
Plant and Machinery cost: 131 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 350 Lakh |
|
Cost of Project : 35000000 |
Profile Single super phosphate is a highly demanded fertilizer mostly used at the time of preparation of land. It comprises of 16% water soluble phos...
|
Capacity : 150000 MT/ Annum |
Plant and Machinery cost: 1621 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 2998 Lakh |
|
Cost of Project : 299800000 |
Product Profile Lithium hexafluorophosphate (LiPF6) is a typical electrolyte salt for lithium-ion batteries. Lithium hexafluorophosphate is an inorga...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 0.01 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
PRODUCT PROFILE: Sodium triphosphate (STP) is an inorganic compound with formula Na5P3O10. It is the sodiumsalt of the polyphosphate penta anion, w...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and mid...
|
Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 351 Lakhs |
|
Cost of Project : 0 |