Agar-agar is a mixture of Polysaccharides (agarose+agaropectine) of a high molecular weight. Agar-agar belongs to the family of galactan polysaccharid...
|
Capacity : Agar Agar: 500Kgs./day |
Plant and Machinery cost: Rs. 211 lakhs |
|
Working Capital : Cost of Project: Rs697 lakhs |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 43.00 |
TCI : - |
|
Cost of Project : 69700000 |
Methyl methacrylate is key monomer for acrylic resins, coating materials, and polymers that meet the fast rising demand for light-guide panels in LCD...
|
Capacity : Methyl Methacrylate (MMA): 2500 Ltrs./day |
Plant and Machinery cost: Rs 238 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 616 lakhs |
|
Cost of Project : 61600000 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives.Bauxite is a naturally occurring, heterogeneous materia...
|
Capacity : Calcined Bauxite: 40 MT/day |
Plant and Machinery cost: Rs. 219 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs766 lakhs |
|
Cost of Project : 76600000 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives.Bauxite is a naturally occurring, heterogeneous materia...
|
Capacity : Calcined Bauxite: 40 MT/day |
Plant and Machinery cost: Rs. 219 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs766 lakhs |
|
Cost of Project : 76600000 |
Milk is a complete balanced food that provides complete nutrition in a balanced proportion and is rich in fats, milk proteins, vitamins, and minerals....
|
Capacity : Toned Milk 3% Fat: 3000000Kgs/Annum Khoa: 300000Kgs/Annum Thandai: 300000 Kgs/Annum Shrikhand: 150000 Kgs/Annum Cream: 15000Kgs/Annum Ghee: 60000 Kgs/Annum |
Plant and Machinery cost: Rs. 227 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs509 lakhs |
|
Cost of Project : 50900000 |
Electronic Waste – or e-waste – is the term used to describe old, end-of-life electronic appliances such as computers, laptops, TVs, DVD players, mobi...
|
Capacity : E-Waste &Lithium Battery Recycling Plant: 20 MT/Day |
Plant and Machinery cost: Rs. 225 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs. 540 lakhs |
|
Cost of Project : 54000000 |
Acrylic resins have become a key component in global manufacturing.Acrylic resin refers to a group of thermoplastic materials derived from compounds s...
|
Capacity : Acrylic Resin (Emulsion Type): 10 MT/Day |
Plant and Machinery cost: Rs 249 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs529lakhs |
|
Cost of Project : 52900000 |
Ethyl and butyl acetates are solvents used in surface coatings, inks, flavorings and pharmaceuticals, and other applications. Ethyl acetate (systemati...
|
Capacity : Ethyl Acetate: 8.3 MT/Day Butyl Acetate: 8.3 MT/Day |
Plant and Machinery cost: Rs 239 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Cost of Project: Rs 546 lakhs |
|
Cost of Project : 54600000 |
A Namkeen is seen in western culture as a type of food that is not meant to be eaten as part of the main meals of the day (breakfast, lunch, and diner...
|
Capacity : Namkeen, Bhujia, Dalmoth, Chana Chur & Khatta Meetha: 10 MT/Day |
Plant and Machinery cost: 221 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 495 lakhs |
|
Cost of Project : 49500000 |
Ethyl and butyl acetates are solvents used in surface coatings, inks, flavorings and pharmaceuticals, and other applications. Ethyl acetate (systemati...
|
Capacity : Ethyl Acetate: 8.3 MT/Day Butyl Acetate : 8.3 MT/Day |
Plant and Machinery cost: Rs 239 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs 546 lakhs |
|
Cost of Project : 54600000 |
A Namkeen is seen in western culture as a type of food that is not meant to be eaten as part of the main meals of the day (breakfast, lunch, and diner...
|
Capacity : Namkeen, Bhujia, Dalmoth, Chana Chur & Khatta Meetha: 10 MT/Day |
Plant and Machinery cost: 221 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs 495 lakhs |
|
Cost of Project : 49500000 |
Surgical gowns are worn by doctors and nurses in the operating theater to address a dual function of preventing transfer of microorganisms and body fl...
|
Capacity : Surgeon Gowns: 250 Pcs./Day Pateint Gowns: 300 Pcs./Day Pillow Covers: 700 Pcs./Day Surgeon Caps: 1000 Pcs./Day |
Plant and Machinery cost: 204 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 492 lakhs |
|
Cost of Project : 49200000 |