Please choose a project below related to this category.
Fusion bonded epoxies are one part, heat curable, thermosetting epoxy utilized for corrosion protection. FBEs are applied to heated parts in a powder...
|
Capacity : Fusion Bonded Epoxy Coated Rebars 333 MT/Day |
Plant and Machinery cost: Rs 680 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.17 |
|
Break Even Point (BEP): 58.80 |
TCI : Cost of Project : Rs 2125 Lakhs |
|
Cost of Project : 212500000 |
Parboiled rice, popularly known as “ushna” rice in boiled form. India contributes about one-third of the world acreage under rice. Rice is available i...
|
Capacity : Parboiled Rice :80 MT/Day •Broken Rice:6 MT/Day •Rice Bran by product:6 MT/Day •Rice Husk by product:19 MT/Day |
Plant and Machinery cost: Rs 677 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs 1290 Lakhs |
|
Cost of Project : 129000000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Total Students per Annum:150 Students Admitted/Annum 750 Beded Hospital |
Plant and Machinery cost: Rs 2047 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project :Rs 10747 Lakhs |
|
Cost of Project : 1074700000 |
The oil palm, Elaeis guineensis, is native to Africa. The commercial values of this crop lies mainly in the oil that can be obtained from the mesocarp...
|
Capacity : Refined Palm Oil:100 MT/Day •Refined Soybean Oil:100 MT/Day |
Plant and Machinery cost: Rs 1193 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.52 |
|
Break Even Point (BEP): 45.10 |
TCI : Cost of Project:Rs 8724 Lakhs |
|
Cost of Project : 872400000 |
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Iron is probably one of the most important, being used on the largest scale of any metal. Its Production in the blast furnace is well documented. When...
|
Capacity : 3000 MT/Day |
Plant and Machinery cost: Rs 266 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 882 Lakhs |
|
Cost of Project : 88200000 |
Paper is a major product of the forestry industry, and is used widely in our society. Paper products are used not only in their obvious applications i...
|
Capacity : Brown Top Testliners:33.3 MT/Day •Fluting Papers:33.3 MT/Day • White Top Testliners:33.3 MT/Day |
Plant and Machinery cost: Rs 2868 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 8.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project: Rs 5662 Lakhs |
|
Cost of Project : 566200000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Total Students per Annum:150 Students Admitted/Annum 700 Beded Hospital |
Plant and Machinery cost: Rs 2047 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Cost of Project : Rs 31862 Lakhs |
|
Cost of Project : 3186200000 |
Maize and its By Products (Maize Starch, Modified Starches & Animal Feed) Corn starch, corn flour or maize starch is the starch derived from the c...
|
Capacity : Maize Starch : 37.50 MT/day•Modified Starch : 45 MT/day•Animal Feed:45 MT/day |
Plant and Machinery cost: Rs 1105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 2894 Lakhs |
|
Cost of Project : 289400000 |
A diaper or nappy is a kind of underwear that allows one to defecate or urinate in a discreet manner. When diapers become soiled, they require changin...
|
Capacity : Rs. 378 Lakh Pkts. /Annum, Baby Diapers: Rs. 135 Lakh Pkts. /Annum,Adult Diapers: Rs. 54 Lakh Pkts. /Annum,Sanitary Napkins: Rs. 189 Lakh Pkts. /Annum |
Plant and Machinery cost: Rs. 856 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : Rs. 2984 Lakhs |
|
Cost of Project : 298400000 |