Please choose a project below related to this category.
Paddy is the most important and extensively grown food crop in the World. Rice grain (Oryza sativa) along with hulls/husk is known as paddy. Paddy see...
|
Capacity : 17658100 MT/ Annum,Rice: 1296000 MT/ Annum,Rice Bran Oil: 6000 MT/ Annum,Deoiled Rice Bran Cake: 22500 MT/ Annum,Salable Power: 1750000 Units |
Plant and Machinery cost: Rs.2391 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Cost of Project: Rs.8269 Lakhs |
|
Cost of Project : 826900000 |
Maize is one of the cereal grains which produces throughout India and is placed 3rd position in agricultural base production. The Starch industry in I...
|
Capacity : 78300 MT /Annum |
Plant and Machinery cost: Rs.5340 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project:Rs. 6916 Lakhs |
|
Cost of Project : 691600000 |
Aluminium fluoride is used in many industrial processes. It is one of the minor constituents added to the electrolytic cells during the production of...
|
Capacity : 6700 MT/Annum |
Plant and Machinery cost: Rs. 518 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 1794 Lakhs |
|
Cost of Project : 179400000 |
Rice is grown over vast areas of land around the world and is a major staple food for more than half of the world population. Rice is an excellent sou...
|
Capacity : 80 MT/Day |
Plant and Machinery cost: Rs. 962 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.62 |
|
Break Even Point (BEP): 46.86 |
TCI : Cost of Project: Rs. 2113 Lakhs |
|
Cost of Project : 211300000 |
Ferro manganese are alloys composed of iron and one or two more metals like Mn, Si, Ti, W etc. The ferro alloys have usually lower melting points than...
|
Capacity : Ferro Silicon:59.0 MT/Day.,Ferro Manganese:167.0 MT/Day.,Silico Manganese:130.5 MT/Day. |
Plant and Machinery cost: Rs.2493 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project :Rs4280 Lakhs. |
|
Cost of Project : 428000000 |
A diaper or nappy is a kind of underwear that allows one to defecate or urinate in a discreet manner. When diapers become soiled, they require changin...
|
Capacity : Baby Diapers:45,000.0 Pckts/Day.,Adult Diapers:18,000.0 Pckts/Day., Sanitary Pads:63,000.0 Pckts/Day. |
Plant and Machinery cost: Rs.855 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project :Rs.2984 Lakhs. |
|
Cost of Project : 298400000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based cementitious building material that is expanding into new worldwide markets. As a s...
|
Capacity : 500 CUM/Day |
Plant and Machinery cost: Rs.1117 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost Of Project : Rs. 1886 Lakhs |
|
Cost of Project : 188600000 |
Manganese is used in metallurgical industries in the form of ferro manganese. Ferro manganese contains about 80% Mn and 20% Fe. Generally ferro mangan...
|
Capacity : 24 MT/Day |
Plant and Machinery cost: 803 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 2695 Lakhs |
|
Cost of Project : 269500000 |
Candy Sugar, (or sweet diamonds as it is popularly called or mishri) is sparking white big crystal sugar obtained by cooling supersaturated sugar sol...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: 637 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 28.00 |
TCI : 3859 Lakhs |
|
Cost of Project : 0 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 777 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 1253 Lakhs |
|
Cost of Project : 125300000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 150000 cubic meter/ Annum |
Plant and Machinery cost: 1100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1790 Lakhs |
|
Cost of Project : 179000000 |
Profile Medium density fiberboard (MDF) is a generic term for a panel primarily composed of lignocellulosic fibers combined with a synthetic resin or...
|
Capacity : 30000 Cubic meters/Annum |
Plant and Machinery cost: 2007 Lakh (40.13 Lakh USD) |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 3534 Lakh (70.68 Lakh USD) |
|
Cost of Project : 353400000 |