The term cement is used to designate many different kinds of substances that are used as binders. The term cements as used henceforth will be confined...
|
Capacity : 90,000 MT/Annum |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
Bauxite ore is an important mineral used in producing alumina, the raw material that is in turn used for producing aluminum. Approximately 85% of Baux...
|
Capacity : 19998 MT/Annum Pure Alumina from Bauxite |
Plant and Machinery cost: 671 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 2113 Lakhs |
|
Cost of Project : 0 |
Ferroalloys are alloys with iron employed to add chemical elements into molten metal, usually during steelmaking. Ferroalloys impart distinctive quali...
|
Capacity : 15000 MT/Annum |
Plant and Machinery cost: 1032 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 67.00 |
TCI : Cost of Project : 2319 Lakhs |
|
Cost of Project : 0 |
Soda ash is a chemical trade name donated by the anhydrous sodium carbonate, or simply “Sodaâ€. The dehydrate variety of soda ash is frequently kno...
|
Capacity : 500000 MT/Annum |
Plant and Machinery cost: 611 Lakhs US$(Rs. 30550 Lakhs) |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 842 Lakhs US$(Rs. 42100 Lakhs) |
|
Cost of Project : 0 |
The direction in which education starts a man will determine his future life. A good degree course module recognize the wisdom in what was stated by t...
|
Capacity : B.E. Marine Engg. -4 Years, B.Sc. Nautical Bsc.-3 Years, 40+60 = 100 Students Per Year,Classes Avg. 216 Days in Year |
Plant and Machinery cost: 685 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 1840 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for an abundance durability, versatility and low cost are most useful metallic material known to mankind. Thermo Mechanical T...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: 520 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 909 Lakhs |
|
Cost of Project : 0 |
The growth of medical education institutions especially in the private sector in India shows that the rapid growth in the number of medical colleges i...
|
Capacity : 150 Student/Annum And 750 Beds Hospital |
Plant and Machinery cost: 20 Crores |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 85 Crores |
|
Cost of Project : 0 |
-
|
Capacity : 66.66 MT/Day |
Plant and Machinery cost: Rs. 671 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 2112 Lakhs |
|
Cost of Project : 0 |
Aluminum fluoride is the inorganic compound with the formula AlF3. It can be prepared by treating aluminum hydroxide or aluminum metal with HF. As a s...
|
Capacity : 30000.00 MT/Annum |
Plant and Machinery cost: 2500 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 5380 Lakhs |
|
Cost of Project : 0 |
Cotton plant is cultivated mainly for fibre. Cottonseed is an important by- product of cotton which is a rich source of protein and edible oil. Its oi...
|
Capacity : 18000 MT/Annum (Refined Cotton Seed Oil) |
Plant and Machinery cost: 7 Crores |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : 16.71 Crores |
|
Cost of Project : 0 |
Kraft paper is paper produced by the Kraft process from wood pulp or waste or agriculture residue. It is strong and relatively coarse. Kraft paper is...
|
Capacity : 20 MT / Day |
Plant and Machinery cost: 604 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 48.00 |
TCI : 1169 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 30 MT / day |
Plant and Machinery cost: 509 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 59.00 |
TCI : 1135 Lakhs |
|
Cost of Project : 0 |