Please choose a project below related to this category.
In the manufacture of inner tubes the plant required is fairly simple and inexpensive, the principal outlay being for wrapping machines and mandrills....
|
Capacity : 1000 Nos./day |
Plant and Machinery cost: Rs. 32 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 165 lakhs |
|
Cost of Project : 0 |
Thermocole or expanded polystyrene as the name suggests, is polystyrene expanded to more than two times the volume of polystyrene. Polystyrene foam is...
|
Capacity : 400 Kgs./Day |
Plant and Machinery cost: Rs. 61 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Rs. 201 Lakhs |
|
Cost of Project : 0 |
Piping may represent as much as 25 percent of the cost of a chemical-process plant. The installed cost of piping systems varies widely with the materi...
|
Capacity : 1500 MT / Annum Tubes, 600 MT/Annum Fittings |
Plant and Machinery cost: 554 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 752 Lakhs |
|
Cost of Project : 0 |
The various pulses are part of the normal diet of all vegetarians and are also used frequently by non-vegetarians too. They are main sources of protei...
|
Capacity : 5 MT / Day |
Plant and Machinery cost: 11 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 147 Lakhs |
|
Cost of Project : 0 |
Engine oil becomes contaminated with foreign material in service. In circulating systems, where a substantial quantity of oil is involved, it is desir...
|
Capacity : 1 MT/day |
Plant and Machinery cost: Rs. 20 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 100 Lakhs |
|
Cost of Project : 0 |
Water quality and quantity are interdependent, interacting elements of water system. The term water quality refers to the level of suitability of wate...
|
Capacity : 10000 Ltrs./day |
Plant and Machinery cost: Rs. 60 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 180 lakhs |
|
Cost of Project : 0 |
Brandies are produced in batch or continuous distillation systems. The pot still or its variation is universally used in France, where as in the Unite...
|
Capacity : 30000 Bottles/Day |
Plant and Machinery cost: Rs. 1156 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 2231 Lakhs |
|
Cost of Project : 0 |
Bulk petroleum and hydrocarbons generally are most commonly stored in cylindrical tanks of welded steel. For quantities upto about 250 nos. the cylind...
|
Capacity : 10000 /day |
Plant and Machinery cost: Rs. 1 crores |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs. 27 crores |
|
Cost of Project : 0 |
Deeply refined pale yellow oils are called white oil. In 1934 the white oil manufacturers association (WOMA) divided the white oils in three viscosity...
|
Capacity : 25 MT/Day |
Plant and Machinery cost: Rs. 950 lakhs |
|
Working Capital : |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |
Dextrin is a starch derivative. It is also known as water soluble carbo hydrate produced by heat and acid depolymerization. Dextrin are made by heatin...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 309 Lakhs |
|
Cost of Project : 0 |
The rubber rollers used in printing machineries are of different sizes and as per requirement. These can be manufactured by using different dies and m...
|
Capacity : 20 Pcs/Day |
Plant and Machinery cost: Rs. 15 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Rs. 57 lakhs |
|
Cost of Project : 0 |
Rice is basically sources of starch content little amount of fat and protein in it. It contains also vitamins and minerals. Basic raw materials requir...
|
Capacity : 30000 MT/Annum |
Plant and Machinery cost: 664 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project 1107 Lakhs |
|
Cost of Project : 0 |