Dairy farming has been part of agriculture for thousands of years, but historically, it was usually done on a small scale on mixed farms.But today, In...
|
Capacity : Cow Milk (Ltrs.): 2,268,000 units/annum Manure (MT):2,160 units/annum Calf (Nos.) : 252 units/annum |
Plant and Machinery cost: Rs 144 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : Rs 727 lakhs |
|
Cost of Project : 72700000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica : 600 MT/annum Activated Carbon (by product) :168 MT/annum Sodium Carbonate (by product):252 MT/annum |
Plant and Machinery cost: Rs 286 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 4.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project: Rs 429lakhs |
|
Cost of Project : 429100000 |
Calcium silicate board is an asbestos-free thermal insulation product that can withstand continuous high operating temperatures. It is a light weight,...
|
Capacity : 50,000Sq.MT/annum |
Plant and Machinery cost: Rs 74 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project : Rs 316 lakhs |
|
Cost of Project : 31600000 |
Fiberboard is a type of engineered wood product that is made out of wood fibers. Types of fiberboard (in order of increasing density) include particle...
|
Capacity : 150,000CBM/annum |
Plant and Machinery cost: Rs 5624 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs 8236lakhs |
|
Cost of Project : 8236100000 |
Paddy is the most important and extensively grown food crop in the World. Rice grain (Oryza sativa) along with hulls/husk is known as paddy. Paddy see...
|
Capacity : Rice:1,170,000 MT/annum Rice Bran Oil:50,000 MT/annum Deoiled Rice Bran Cake:187,500 MT/annum Salable Power:130,500 Th. Units/annum |
Plant and Machinery cost: Rs 238 crore |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: Rs 565 crore |
|
Cost of Project : 5650000000 |
A hose is a flexible hollow tube designed to carry fluids from one location to another. Hoses are also sometimes called pipes, or more generally tubin...
|
Capacity : Automobile AC Hose: 300,000 Nos/Annum Fuel Hose: 500,000 Nos/Annum Hydraulic Hose:500,000 Nos/Annum Petrol Pump Hose: 200,000 Nos/Annum Tyres : 450,000 Nos/Annum |
Plant and Machinery cost: Rs 1020 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 2994 lakhs |
|
Cost of Project : 299400000 |
The alcohol industry is the commercial industry involved in the manufacturing, distribution, and sale of alcoholic beverages. Alcohol has assumed very...
|
Capacity : Extra Neutral Alcohol (ENA) : 15,000KLs/Annum Distilleries Dry Grain with Solubles (DDGS) by product: 7,350MT/Annum Fusel Oil (by product) : 24KLs/Ann |
Plant and Machinery cost: Rs 4637 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 6572 lakhs |
|
Cost of Project : 657200000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica: 1200mt/annum Activated Carbon (by product): 336mt/annum Sodium Carbonate (by product): 504 mt/annum |
Plant and Machinery cost: Rs 556 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project : Rs 1200 lakhs |
|
Cost of Project : 120000000 |
Concrete poles were first used over 60 years ago and were then made of normal reinforced concrete. As technology improved, production and use of concr...
|
Capacity : Prestressed Concrete Cement Electric Poles: 60,000nos/annum |
Plant and Machinery cost: Rs 304 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 713 lakhs |
|
Cost of Project : 71300000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica: 1500mt/annum Activated Carbon (by product): 420mt/annum Sodium Carbonate (by product): 630mt/annum |
Plant and Machinery cost: Rs 519 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.24 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 787 lakhs |
|
Cost of Project : 78700000 |
Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded ma...
|
Capacity : 4800000 sq.ft. |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 391 lakhs |
|
Cost of Project : 39100000 |
Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded ma...
|
Capacity : 4800000 sq.ft. |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 476 lakhs |
|
Cost of Project : 47600000 |