Please choose a project below related to this category.
Precipitated silica (also called particulate silica) is compound of aggregates of ultimate particles of colloidal size that have not become linked in...
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: 38 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 174 Lakhs |
|
Cost of Project : 0 |
The vehicle owners should only use the minimum amount of ethylene glycol used based antifreeze to protect the system. The higher concentrate of antifr...
|
Capacity : 30 Lts. Coolant/Day, 300 Lts. Brake Oil/Day, 1000 Lts. Lube/Day, 1000 Lts. Grease/Day |
Plant and Machinery cost: 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 70 Lakhs |
|
Cost of Project : 0 |
Increase of inputs on tangible or non-tangible way in agriculture increased the production of crops. Soyabean, known as golden bean has emerged as the...
|
Capacity : 7.5 MT Soyabean Processing / Day (Cultivation in 1000 Hactares) |
Plant and Machinery cost: 1726 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 2686 Lakhs |
|
Cost of Project : 0 |
Glass bottles manufacturing occupies an important part in the glass manufacturing industry in the field of glass container manufacturing. Glass is bei...
|
Capacity : 1,00,000 Nos./Day |
Plant and Machinery cost: 200 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 70.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 518 Lacs |
|
Cost of Project : 0 |
Before going to various rubber compounding ingredients as applied in the rubber industry in detail, we would like to clarify the term compounding as a...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: 86 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 63.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 407 Lakhs |
|
Cost of Project : 0 |
Carbon is probably the most widely distributed element in nature. It occurs in two allotropic crystalline forms, viz. Graphite (hexagonal system) and...
|
Capacity : 2 Mt/Day |
Plant and Machinery cost: 34 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 48.00 |
TCI : 122 Lakhs |
|
Cost of Project : 0 |
The production of poultry in the us and generally throughout the world is carried out by a highly specialized, efficient poultry industry that has be...
|
Capacity : 1 Lakhs Eggs/Day |
Plant and Machinery cost: 15 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 334 Lakhs |
|
Cost of Project : 0 |
Toys are used by every body in his child hood. Every house has few toys. Rubber toys are one of the cheaper and best substitutes of electronic toys,...
|
Capacity : 1500 Nos./Day |
Plant and Machinery cost: 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 61 Lakhs |
|
Cost of Project : 0 |
Carbon is probably the most widely distributed element in nature. Activated carbon from rice husk has been developed & finding wider uses. There is c...
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 183 Lakhs |
|
Cost of Project : 0 |
In the modern industrial era grease have been increasingly employed to coke with a variety if difficult lubrication problems, particularly those where...
|
Capacity : 2 ton/Day |
Plant and Machinery cost: 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 468 Lakhs |
|
Cost of Project : 0 |
The wire drawing lubricant is a special type of product in the field of lubricant. Wire drawing lubrication is an extremely complicated, often poorly...
|
Capacity : 600 kg/Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 68 Lakhs |
|
Cost of Project : 0 |
Rabbit farming is increasing commercially in many countries. Rabbit farming on a small scale involves small number (a few dozen or less) of animals fe...
|
Capacity : 5000 Angora Rabbits Farming, 2 MT Rabbit Feed/Hr. & 100 kg Rabbit Yarn Wool/Day |
Plant and Machinery cost: 414 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.00 |
|
Break Even Point (BEP): 62.00 |
TCI : 608 Lakhs |
|
Cost of Project : 0 |