Please choose a project below related to this category.
The tyre and tubes are very important rubber products and widely used everywhere in the world. Various types of tyres are available namely pneumatic s...
|
Capacity : 12 Tyres/Day |
Plant and Machinery cost: 190 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 340 Lakhs |
|
Cost of Project : 0 |
Iron is an Anglo-Saxon Word : the symbol Fe, comes from latin ferrum. The use of iron has been known since the earliest times; it was prepared by the...
|
Capacity : 139 Lakh MT/Annum |
Plant and Machinery cost: 1030 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1163 Lakhs(Cost of Project) |
|
Cost of Project : 0 |
Coal is an extremely heterogeneous, complex material that is difficult to characterize. Coal is a rock formed by geological process and is composed of...
|
Capacity : 1350 Lakh MT/Annum (Job Work) |
Plant and Machinery cost: 752 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 972 Crores |
|
Cost of Project : 0 |
Banana is the one of richest iron source green vegetable. It can be preserved for 3 months or more by reducing moisture in it. This may be done by dry...
|
Capacity : 100 kgs./Day |
Plant and Machinery cost: 3 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 18 Lakhs |
|
Cost of Project : 0 |
Goats are allied to sheep but are much hardier and more active animals. Their males or billy goats have a tuft of hair (beards) under the chin. The pr...
|
Capacity : 20000 MT Milk/Annum |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 37 Lakhs |
|
Cost of Project : 0 |
The term clay has a double meaning and therefore should be defined when it is used. Clay is used both as a rock term and as a particle size term. As a...
|
Capacity : 9500 MT/Annum |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 73.00 |
TCI : 289 Lakhs |
|
Cost of Project : 0 |
The American petroleum industry had its inception when the now famous drake well was drilled in the year 1859. The ratio of proven reserves to produc...
|
Capacity : 200000 Cube Meter/Day |
Plant and Machinery cost: US $ 273.3 Million |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 12.00 |
TCI : US $ 3083 Million |
|
Cost of Project : 0 |
Every body use milk and milk products. A dairy is a place for handling milk and milk products. Technology refers to the application of scientific kno...
|
Capacity : Farming 200 Cows, 5000 Ltrs/Day, Processed Milk 34000 Lts/Day |
Plant and Machinery cost: 594 Lacs |
|
Working Capital : 440 Lacs |
Rate of Return (ROR): 58.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 1866 Lacs |
|
Cost of Project : 0 |
Many molten materials do not crystallized to their parent crystalline phases once the thermodynamic melting temperature Tm is passed on cooling. Such...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 2228 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Rs 2863 Lakhs |
|
Cost of Project : 0 |
The invention of air entraining agents in 1939 has been termed a revolutionary development in concrete technology. The basic function of an air-entra...
|
Capacity : 2 MT/Day |
Plant and Machinery cost: Rs. 19 Lakhs |
|
Working Capital : Rs. 62.00 Lakhs |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Rs. 123.00 Lakhs |
|
Cost of Project : 0 |
Industrial vitrified tiles are largely used in the industrial floor or wall construction. In the industrial verification process tiles are not comple...
|
Capacity : 1,00,000 Sq. Ft./Day |
Plant and Machinery cost: Rs. 235.00 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Rs. 2666 Lakhs |
|
Cost of Project : 0 |
Glass reinforced concrete is a composite material consisting of a mortar of hydraulic cement and fine aggregate reinforced with alkali resistant glas...
|
Capacity : 6000 MT GRC Mix/Annum |
Plant and Machinery cost: Rs. 14 Lakhs |
|
Working Capital : Rs 34 Lakhs |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs 81 Lakhs |
|
Cost of Project : 0 |