With the vast potential of plastics, artificial synthetic marble is virtually replacing the use of natural marble. The qualities of artificial synthet...
|
Capacity : 3 MT/Day |
Plant and Machinery cost: Rs. 18 Lacs |
|
Working Capital : Rs. 48 Lacs |
Rate of Return (ROR): 53.21 |
|
Break Even Point (BEP): 44.05 |
TCI : Rs. 107 Lacs |
|
Cost of Project : 0 |
Glass is a brittle solid material at room temperature. It is believed that even its apparent solid state, it is actually a liquid. On heating, it firs...
|
Capacity : 1000 Units/Day for Lighter Liquids 1000 Units/Day for Heavier Liquids |
Plant and Machinery cost: Rs. 3.80 Lacs |
|
Working Capital : Rs. 2.01 Lacs |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Rs. 33.78 Lacs |
|
Cost of Project : 0 |
Glass industry in India is one of the prime industry where much more power is utilizing for controlling the production of glass continuously. It is ne...
|
Capacity : 100-110MW/Day |
Plant and Machinery cost: 453 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.15 |
|
Break Even Point (BEP): 52.21 |
TCI : 494 Lakhs |
|
Cost of Project : 0 |
Many molten materials do not crystallized to their parent crystalline phases once the thermodynamic melting temperature Tm is passed on cooling. Such...
|
Capacity : 200MT/Day |
Plant and Machinery cost: 2228 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.10 |
|
Break Even Point (BEP): 41.84 |
TCI : 2863 Lakhs |
|
Cost of Project : 0 |
Glasses are basically silicate borate compounds of different alkaki metal oxide. There are two types of glass. 1. Normal glass which is used for the p...
|
Capacity : 6MT/Day |
Plant and Machinery cost: 251 Lakhs |
|
Working Capital : Total Capital |
Rate of Return (ROR): 40.16 |
|
Break Even Point (BEP): 49.18 |
TCI : 541 Lakhs |
|
Cost of Project : 0 |
Industrial vitrified tiles are largely used in the industrial floor or wall construction. In the industrial verification process tiles are not complet...
|
Capacity : 1,00,000 Sq. Ft./Day |
Plant and Machinery cost: Rs. 235.00 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 48.72 |
|
Break Even Point (BEP): 68.12 |
TCI : 2666 Lakhs |
|
Cost of Project : 0 |
The Indian glass industry has come a long way since its inception in the early 19th century. This well developed industry is large enough to cover vir...
|
Capacity : 72000 Sqm/Day |
Plant and Machinery cost: Rs. 1200 Lakhs |
|
Working Capital : Rs. 91 Lakhs |
Rate of Return (ROR): 85.81 |
|
Break Even Point (BEP): 36.67 |
TCI : Rs. 2447 Lakhs |
|
Cost of Project : 0 |
Tungsten carbide is a compound of tungsten and carbon. Tungsten as such or tungsten ore is not available in India sufficiently. So it can be imported...
|
Capacity : 1000 Nos./Day |
Plant and Machinery cost: Rs. 24 Lakhs |
|
Working Capital : Rs. 24 Lakhs |
Rate of Return (ROR): 39.03 |
|
Break Even Point (BEP): 50.93 |
TCI : Rs. 87 Lakhs |
|
Cost of Project : 0 |
Lead is an essential commodity in the modern industrial world, ranking fifth in tonnage consumed after Iron, Copper, Aluminium and Zinc. The main uses...
|
Capacity : 30 MT/Day |
Plant and Machinery cost: Rs. 244 Lakhs |
|
Working Capital : Rs. 338 Lakhs |
Rate of Return (ROR): 115.05 |
|
Break Even Point (BEP): 24.30 |
TCI : Rs. 638 Lakhs |
|
Cost of Project : 0 |
Bagasse is one of the major by product of sugar crushing industries. Charcoal is a highly porous form of amorphous carbon. It is one of the half burn...
|
Capacity : 2.0 MT/Day |
Plant and Machinery cost: Rs. 53.0 Lakhs |
|
Working Capital : Rs. 25 Lakhs |
Rate of Return (ROR): 26.41 |
|
Break Even Point (BEP): 62.20 |
TCI : Rs. 154 Lakhs |
|
Cost of Project : 0 |
In major importing countries coconut shell charcoal is mainly used in the manufacturing of activated carbon. All the production units are enjoy highe...
|
Capacity : 1.0 MT/Day |
Plant and Machinery cost: Rs. 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.25 |
|
Break Even Point (BEP): 48.36 |
TCI : Rs. 19 Lakhs |
|
Cost of Project : 0 |
Activated wood charcoal is a very important chemical widely employed by certain gases and vapours in purification in catalytic chemical reactions and...
|
Capacity : 15MT/Day |
Plant and Machinery cost: Rs. 80 Lakhs |
|
Working Capital : Rs. 113 Lakhs |
Rate of Return (ROR): 24.13 |
|
Break Even Point (BEP): 62.30 |
TCI : Rs. 262 Lakhs |
|
Cost of Project : 0 |