Please choose a project below related to this category.
Edible corn oil is manufactured from maize, wheat and other corn bearing oil by solvent extraction process. Corn generally contains oil. There are sev...
|
Capacity : 10 MT Corn Oil/ Day |
Plant and Machinery cost: Rs. 3 Crores |
|
Working Capital : Rs. 5 Crores |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Rs. 11 Crores |
|
Cost of Project : 0 |
Corn chips is the product of maize corn. Maize powder is used for the preparation of corn chips. For enriching with the vitamin and minerals Vitamin ?...
|
Capacity : 2 MT/Day |
Plant and Machinery cost: Rs. 26 Lakhs |
|
Working Capital : Rs. 40 Lakhs |
Rate of Return (ROR): 47.32 |
|
Break Even Point (BEP): 64.88 |
TCI : Rs. 115 Lakhs |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in the...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: Rs. 8 Lakhs |
|
Working Capital : Rs. 134 Lakhs |
Rate of Return (ROR): 51.74 |
|
Break Even Point (BEP): 40.21 |
TCI : Rs. 160.00 Lakhs |
|
Cost of Project : 0 |
Cement is a very important building material. It is used in almost all the constructions and is subjected to water in contact. If the concrete or ceme...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 39.28 |
|
Break Even Point (BEP): 48.99 |
TCI : - |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in the...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: 8 Lakhs |
|
Working Capital : 134 Lakhs |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 160 Lakhs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 84 Lacs |
|
Working Capital : Rs. 74 Lacs |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Rs. 250 Lacs |
|
Cost of Project : 0 |
There are different kinds of fasteners available in the mechanical workshop. Fasteners can be made by batch manual process and also by computerized au...
|
Capacity : 2.00 MT /Day |
Plant and Machinery cost: Rs. 22.00 Lakhs |
|
Working Capital : Rs. 372 Lakhs |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 23.00 |
TCI : Rs. 440 Lakhs |
|
Cost of Project : 0 |