Please choose a project below related to this category.
The wire drawing lubricant is a special type of product in the field of lubricant. Wire drawing lubrication is an extremely complicated, often poorly...
|
Capacity : 600 kg/Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 68 Lakhs |
|
Cost of Project : 0 |
Maize is one of the cereal grains which produce through out India and is placed 3rd position in agricultural base production though maize is not our s...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The maize also called “corn or Indian corn” is widely cultivated in India. Maize ranks high among the four or five principal cereal crops of the world...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Maize is one of the most important cereal crops in the world agricultural economy and is grown in many countries in each of the continents of the worl...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Potato is widely consumed as food all over the world. It contains the starch as a major carbohydrate. Surplus and cull potatoes are used as feed for l...
|
Capacity : 6 MT/Day |
Plant and Machinery cost: 27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 86 Lakhs |
|
Cost of Project : 0 |
Pig Iron is a raw material for all the iron and steel based industries and hence, required to be responsive to the requirements of pig iron users. Pig...
|
Capacity : 10 Lakh MT/Month |
Plant and Machinery cost: 38 Crores |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 29.00 |
TCI : 388 Crores |
|
Cost of Project : 0 |
Gravity casting which is in fact is a permanent mould casting in which the molten metal is poured under the force of gravity into the permanent mould...
|
Capacity : 300.00 Kgs/day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 65 Lakhs |
|
Cost of Project : 0 |
Coconut is one of the important fruit having large use starting from bakery, confectionery, pharmaceutical to beverage and many more industries. Sever...
|
Capacity : 92.55 MT/day |
Plant and Machinery cost: 410 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 77.00 |
|
Break Even Point (BEP): 26.00 |
TCI : 2745 Lakhs |
|
Cost of Project : 0 |
Iron is an Anglo-Saxon Word : the symbol Fe, comes from latin ferrum. The use of iron has been known since the earliest times; it was prepared by the...
|
Capacity : 139 Lakh MT/Annum |
Plant and Machinery cost: 1030 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1163 Lakhs(Cost of Project) |
|
Cost of Project : 0 |
Prestressed Concrete poles for electrical H.T. and L.T. lines widely used now a days in different power distribution in the villages specially rather...
|
Capacity : 30,000 Nos/Annum |
Plant and Machinery cost: 71 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : 209 Lacs |
|
Cost of Project : 0 |
Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Other...
|
Capacity : 20000 MT/Annum |
Plant and Machinery cost: 615 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 1875 Lakhs |
|
Cost of Project : 0 |
Anodic Aluminium Labels used as an industrial, metallic labels and are widely used on industrial machinery and domestic appliances for supplying the s...
|
Capacity : 1 MT/Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 132 Lakhs |
|
Cost of Project : 0 |