Please choose a project below related to this category.
Broken rice is the by-product of rice mill. It has various uses out of which one use is to prepare liquid glucose from broken rice. It can be processe...
|
Capacity : 30000MT/Annum |
Plant and Machinery cost: 664 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project 1107 Lacs |
|
Cost of Project : 0 |
In the manufacture of steel, chromium is added usually in the form of ferro chrome. Pure chromium metal, produced by electrolytic or aluminothermic pr...
|
Capacity : - |
Plant and Machinery cost: 2998 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 76.00 |
TCI : 4490 Lacs |
|
Cost of Project : 0 |
High mast poles are newly ventured high pillars for using high mast lighting, flood lighting, sports lighting, traffic signals, street lighting etc. I...
|
Capacity : 9000 Nos./ANNUM |
Plant and Machinery cost: 206 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 71.00 |
TCI : 484 Lacs |
|
Cost of Project : 0 |
The chief departments of a metallurgical plant operating on a complete are to finished product cycle are that operating on a complete are to finished...
|
Capacity : 200.00 MT/Day |
Plant and Machinery cost: 275 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 61.00 |
|
Break Even Point (BEP): 26.00 |
TCI : 3897 Lacs |
|
Cost of Project : 0 |
Steel is produced through two process routes; the ore based Blast Furnace-LD Converter route or scrap or DRI based electric arc furnace route. The ore...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs 12 Corers |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs 18 Crores |
|
Cost of Project : 0 |
Aluminium is the most abundant metal in the world. It makes up 8% of the solid portion of the earth crust. Every country processes large supplies of a...
|
Capacity : 25000 MT/Annum |
Plant and Machinery cost: Rs 729 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Rs 2571 Lakhs |
|
Cost of Project : 0 |
The invention of air entraining agents in 1939 has been termed a revolutionary development in concrete technology. The basic function of an air-entra...
|
Capacity : 2 MT/Day |
Plant and Machinery cost: Rs. 19 Lakhs |
|
Working Capital : Rs. 62.00 Lakhs |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Rs. 123.00 Lakhs |
|
Cost of Project : 0 |
The importance of iron and steel among other materials is well known for industrialization and national economy. Basically all industries depend on i...
|
Capacity : 1.67 MT/day |
Plant and Machinery cost: Rs. 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Rs. 142 Lakhs |
|
Cost of Project : 0 |
Glass reinforced concrete is a composite material consisting of a mortar of hydraulic cement and fine aggregate reinforced with alkali resistant glas...
|
Capacity : 6000 MT GRC Mix/Annum |
Plant and Machinery cost: Rs. 14 Lakhs |
|
Working Capital : Rs 34 Lakhs |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs 81 Lakhs |
|
Cost of Project : 0 |
Seamless M. S. pipes and tubes products may be made better or electric welding formed skelp, piercing, extrusion. Piercing and extrusion methods are u...
|
Capacity : 800 Kg/Day |
Plant and Machinery cost: 8 Lacs |
|
Working Capital : 24 Lacs |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 50.00 |
TCI : 56 Lacs |
|
Cost of Project : 0 |
Pig Iron is a raw material for all the iron and steel based industries and hence, required to be responsive to the requirements of pig iron users. Pi...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs. 520 LAKHS |
|
Working Capital : - |
Rate of Return (ROR): 59.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Rs. 1524 LAKHS |
|
Cost of Project : 0 |
|
Capacity : 120 MT/day |
Plant and Machinery cost: Rs. 382 LAKHS |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 1918 LAKHS |
|
Cost of Project : 0 |