Please choose a project below related to this category.
Aluminium fluoride is used in many industrial processes. It is one of the minor constituents added to the electrolytic cells during the production of...
|
Capacity : 6700 MT/Annum |
Plant and Machinery cost: Rs. 518 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 1794 Lakhs |
|
Cost of Project : 179400000 |
Maize is one of the cereal grains which has been produced throughout India and is placed 3rd position in agricultural base production. Maize is consti...
|
Capacity : 60,900 MT/Annum |
Plant and Machinery cost: Rs. 420 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1229 Lakhs |
|
Cost of Project : 122900000 |
Potato is widely consumed as food all over the world. It contains the starch as a major carbohydrate. Surplus and cull potatoes are used as feed for l...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: Rs. 517 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: Rs 899 Lakhs |
|
Cost of Project : 89900000 |
Copper (II) Sulfate is a chemical compound with the formula CuSO4. It occurs in nature as mineral hydrocyanite. It is gray to white and has rhombic cr...
|
Capacity : 600 Nos. /annum |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 238 Lakhs |
|
Cost of Project : 23800000 |
Aluminium, the second most plentiful metallic element on earth, became an economic competitor in engineering applications as recently as the end of th...
|
Capacity : 360 MT/annum |
Plant and Machinery cost: Rs. 154 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs. 255 Lakhs |
|
Cost of Project : 25500000 |
Ready mix concrete is a modern trend of introduction in the Asian Countries. It is already introduced long before in the European Countries. It is new...
|
Capacity : 240 Cu MT/Day |
Plant and Machinery cost: Rs 320 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.08 |
|
Break Even Point (BEP): 46.09 |
TCI : Cost of Project: Rs. 773 Lakhs |
|
Cost of Project : 77300000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based cementitious building material that is expanding into new worldwide markets. As a s...
|
Capacity : 500 CUM/Day |
Plant and Machinery cost: Rs.1117 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost Of Project : Rs. 1886 Lakhs |
|
Cost of Project : 188600000 |
Guar gum, a natural gum, is an edible thickening agent extracted from the guar bean. Guar beans have a large endosperm which contains galactomannan g...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs.213 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost Of Project : Rs.832 Lakhs |
|
Cost of Project : 83200000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particles. The...
|
Capacity : - |
Plant and Machinery cost: Rs. 274 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : Rs.1330 Lakhs |
|
Cost of Project : 133000000 |
Cellular light weight concrete is also known as CLC, foamed cement, and light weight cement, world over thanks to its advantages over ordinary buildin...
|
Capacity : 50 Cu Mtr/Day |
Plant and Machinery cost: Rs.127 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 16.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs.413 Lakhs |
|
Cost of Project : 41300000 |
Starch (C6H10O5)n, the principal reserve poly Saccharide in plants constitutes substantial portion of human diet. It is the principal components of mo...
|
Capacity : 80 MT/day |
Plant and Machinery cost: Rs.358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs.737 Lakhs |
|
Cost of Project : 73700000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particl...
|
Capacity : 25 Million Ltrs./Annum |
Plant and Machinery cost: Rs. 487 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : Rs. 1557 Lakhs |
|
Cost of Project : 155700000 |