Vacuum distillation is the distillation process of separating liquids boiling above 150°C at 1 atm from Nonvolatile impurities. Another liquid is boil...
|
Capacity : Creosote Oil 1875 MT/Annum,Phenolic or Carbolic Oil 300 MT/Annum,Naphthalic Oil 900 MT/Annum,Wash Oil 600 MT/Annum,Light Oil 75 MT/Annum, Medium Soft Pitch 3750 MT/Annum |
Plant and Machinery cost: 149 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 323 Lakhs |
|
Cost of Project : 0 |
Aluminium foil is one of the most versatile packaging medium. The growth of this industry has been in the recent past, owing to the growing applicatio...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: 423 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 44.13 |
|
Break Even Point (BEP): 32.29 |
TCI : Cost of Project : 1172 Lakh |
|
Cost of Project : 117200000 |
Gypsum board, also known as drywall or plaster board, consists of a core of gypsum surrounded with a paper covering. Several varieties of gypsum board...
|
Capacity : 6600 No.s/day |
Plant and Machinery cost: 192 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 26.11 |
|
Break Even Point (BEP): 61.30 |
TCI : Cost of Project : 551 lakh |
|
Cost of Project : 55100000 |
A transmission tower (colloquially termed an electricity pylon in the United Kingdom and parts of Europe, an ironman in Australia, and a hydro tower i...
|
Capacity : 144 MT /day |
Plant and Machinery cost: 11576 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 22.45 |
|
Break Even Point (BEP): 42.26 |
TCI : Cost of Project : 15505 lakh |
|
Cost of Project : 1550500000 |
Profile Electric Resistance Welded Pipe that is also known as ERW pipe and it is made of strips of steel that is hot rolled and passed through formin...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: 172 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 416 Lakh |
|
Cost of Project : 41600000 |
Profile Copper powder is finely granulated copper that has many metallurgic functions. The powder is cheaper than regular cast copper, so engineers c...
|
Capacity : 2 MT/ day |
Plant and Machinery cost: 27 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 29.70 |
TCI : 792 Lakh |
|
Cost of Project : 0 |
Profile Maize is one of the cereal grains which produces throughout India and is placed 3rd position in agricultural base production. The products fr...
|
Capacity : - |
Plant and Machinery cost: 216 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of the Project : 630 Lakh |
|
Cost of Project : 63000000 |
Profile Polymer modified adhesives are widely accepted in the industry and often referred to as thin-set mortars. The blended polymers interact with...
|
Capacity : White Cement Tile Adhesive – 1500 MT/Annum,Ordinary Portland Cement Tile Adhesive – 1500 MT/Annum |
Plant and Machinery cost: 106 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 420 Lakh |
|
Cost of Project : 42000000 |
Profile Rolling allows sheet metal to be formed in to cylindrical shapes. This gives us the ability to make tanks, cylinders, bands and virtually any...
|
Capacity : 9000 MT SS Rolled Sheet/Annum,4500000 No.s of Set SS Utensils/Annum |
Plant and Machinery cost: 3642 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 6391 Lakh |
|
Cost of Project : 639100000 |
Profile Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commerc...
|
Capacity : - |
Plant and Machinery cost: 2531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of project : 4639 Lakhs |
|
Cost of Project : 463900000 |
Profile: A fastener is a hardware device that mechanically joins or affixes two or more objects together. Fasteners mainly cover nuts, bolts, screws,...
|
Capacity : 2400 MT/Annum |
Plant and Machinery cost: 120 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of project: 417 Lakhs |
|
Cost of Project : 41700000 |
Profile: Coconuts are the fruit of the coconut palm, botanically known as cocos nucifera, nucifera with meaning "nut-bearing." Coconut is one of the...
|
Capacity : - |
Plant and Machinery cost: 770 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of project : 1930 Lakhs |
|
Cost of Project : 193000000 |