Please choose a project below related to this category.
Sorbitol is one of many sugar alcohols found in nature that gets metabolized slower in our bodies than other normal dietary sugars. Also known as gluc...
|
Capacity : 47 MT/Day |
Plant and Machinery cost: Rs. 869 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs. 1235 Lakhs |
|
Cost of Project : 123500000 |
Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commercial uses....
|
Capacity : - |
Plant and Machinery cost: Rs.1029 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project : Rs.2807 Lakhs |
|
Cost of Project : 280700000 |
Maize (Zea mays) is classified into dent, flint, waxy, sweet and pop corn categories. Dent corn also known as field corn, containing both hard and so...
|
Capacity : - |
Plant and Machinery cost: Rs.145 Crores |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project : Rs.213 Crores |
|
Cost of Project : 2130000000 |
Aluminium Conductors (i) All Aluminium Conductors (AAC) (ii) All Alloy Aluminium Conductors (AAAC), and (iii) Aluminium Conductors Steel Reinforced (A...
|
Capacity : 4 MT/Day |
Plant and Machinery cost: 93 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 393 Lakhs |
|
Cost of Project : 39300000 |
Aluminum is the most widely used non ferrous metal and is extensively used in packaging materials. It is an excellent material for creating all types...
|
Capacity : 147,5000 NOS./day |
Plant and Machinery cost: 55 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 21.00 |
TCI : 2018 Lakhs |
|
Cost of Project : 0 |
A beverage can is a metal container designed to hold a fixed portion of liquid such as a carbonated soft drink, alcoholic beverage, fruit juice, herba...
|
Capacity : 1000 Kg /day |
Plant and Machinery cost: 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 298 Lakhs |
|
Cost of Project : 29800000 |
Water seepage is a major problem in construction industries particularly when the buildings are constructed in the damped environment. A large number...
|
Capacity : 3000 Liters /day |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 419 Lakhs |
|
Cost of Project : 0 |
Maize is one of the cereal grains which produces through out India and is placed 3rd position in agricultural base production. Maize is constituted by...
|
Capacity : - |
Plant and Machinery cost: 349 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 1137 Lakhs |
|
Cost of Project : 113700000 |
Alumina is a white granular material, a little less coarse than table salt, and is properly called aluminium oxide. Aluminium does not occur as a met...
|
Capacity : 1800000 MT/ Annum |
Plant and Machinery cost: 64454 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 79232 Lakhs |
|
Cost of Project : 7923200000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 150000 cubic meter/ Annum |
Plant and Machinery cost: 1100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1790 Lakhs |
|
Cost of Project : 179000000 |
Activated Carbon is a unique material because of the way it is filled with holes (voids, spaces, sites, pores,) whatever the size of molecules. It is...
|
Capacity : 6000 MT/ Annum |
Plant and Machinery cost: 181 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 1070 Lakhs |
|
Cost of Project : 0 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |