Please choose a project below related to this category.
The human life in cities is becoming more and more mechanical because of noise pollution, environment pollution. For relaxed and peaceful environment,...
|
Capacity : 4000 Entry/Day, 750 Visitor/Day, 20 Room Hotel & 300 Meals/day Resturant |
Plant and Machinery cost: 19 Crores |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 58.00 |
TCI : 26 Crores |
|
Cost of Project : 0 |
Pig Iron is a raw material for all the iron and steel based industries and hence, required to be responsive to the requirements of pig iron users. Pig...
|
Capacity : 10 Lakh MT/Month |
Plant and Machinery cost: 38 Crores |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 29.00 |
TCI : 388 Crores |
|
Cost of Project : 0 |
Gravity casting which is in fact is a permanent mould casting in which the molten metal is poured under the force of gravity into the permanent mould...
|
Capacity : 300.00 Kgs/day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 65 Lakhs |
|
Cost of Project : 0 |
Iron is an Anglo-Saxon Word : the symbol Fe, comes from latin ferrum. The use of iron has been known since the earliest times; it was prepared by the...
|
Capacity : 139 Lakh MT/Annum |
Plant and Machinery cost: 1030 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1163 Lakhs(Cost of Project) |
|
Cost of Project : 0 |
Bricks may be made from a number of different kinds of materials, but they must usually possess (can be capable of developing) a certain amount of pla...
|
Capacity : 83333 Nos./Day |
Plant and Machinery cost: 30 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.80 |
|
Break Even Point (BEP): 53.00 |
TCI : 192 Lakhs |
|
Cost of Project : 0 |
Goats are allied to sheep but are much hardier and more active animals. Their males or billy goats have a tuft of hair (beards) under the chin. The pr...
|
Capacity : 20000 MT Milk/Annum |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 37 Lakhs |
|
Cost of Project : 0 |
Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Other...
|
Capacity : 20000 MT/Annum |
Plant and Machinery cost: 615 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 1875 Lakhs |
|
Cost of Project : 0 |
Anodic Aluminium Labels used as an industrial, metallic labels and are widely used on industrial machinery and domestic appliances for supplying the s...
|
Capacity : 1 MT/Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 132 Lakhs |
|
Cost of Project : 0 |
Prestressing is the process of applying a load to a structure deforming, so that it will withstand a work load more effectively or deflect less. Prest...
|
Capacity : 500 Nos./Day |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 514 Lakhs |
|
Cost of Project : 0 |
The American petroleum industry had its inception when the now famous drake well was drilled in the year 1859. The ratio of proven reserves to produc...
|
Capacity : 200000 Cube Meter/Day |
Plant and Machinery cost: US $ 273.3 Million |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 12.00 |
TCI : US $ 3083 Million |
|
Cost of Project : 0 |
To think of steel first of all a rod or a bar as you may call it comes to the mind of a common man in India. Steel rods are required even for making...
|
Capacity : 500 MT/Day |
Plant and Machinery cost: 39 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 145 Crores |
|
Cost of Project : 0 |
Hot dip galvanizing is a process in which an adherent, protective coating of zinc compounds is developed on the surface of iron and steel products by...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: RS. 176 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 859 Lakhs |
|
Cost of Project : 0 |