Please choose a project below related to this category.
The use of granite and other decorative stones has been increasing world over. India is endowed with vast deposits of these natural resources and is t...
|
Capacity : 100 Sq. M./Day |
Plant and Machinery cost: Rs. 168 Lakhs |
|
Working Capital : Rs. 151 Lakhs |
Rate of Return (ROR): 47.73 |
|
Break Even Point (BEP): 42.87 |
TCI : Rs. 388 Lakhs |
|
Cost of Project : 0 |
Cement is a very important building material. It is used in almost all the constructions and is subjected to water in contact. If the concrete or ceme...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 39.28 |
|
Break Even Point (BEP): 48.99 |
TCI : - |
|
Cost of Project : 0 |
Marble polishing batti is an essential item in the marble and granite polishing industries. Now a days there is good market demand of granite and marb...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 33.63 |
|
Break Even Point (BEP): 40.77 |
TCI : - |
|
Cost of Project : 0 |
Bricks may be made from a no. of different kinds of materials but they must usually posses a certain amount of plasticity. Fly ash is one of them. Fly...
|
Capacity : 250 Lacs Nos/Annum |
Plant and Machinery cost: Rs. 27.00 Lacs |
|
Working Capital : Rs. 62.0 Lacs |
Rate of Return (ROR): 27.16 |
|
Break Even Point (BEP): 65.69 |
TCI : Rs. 158.0 Lacs |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in the...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: 8 Lakhs |
|
Working Capital : 134 Lakhs |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 160 Lakhs |
|
Cost of Project : 0 |
With the vast potential of plastics, artificial synthetic marble is virtually replacing the use of natural marble. The qualities of artificial synthet...
|
Capacity : 3 MT/Day |
Plant and Machinery cost: Rs. 17 Lakhs |
|
Working Capital : Rs. 54 Lakhs |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Rs. 121 Lakhs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 84 Lacs |
|
Working Capital : Rs. 74 Lacs |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Rs. 250 Lacs |
|
Cost of Project : 0 |
There are various uses of crushed stones, in rail road ballast, laying of roads, in concrete, plastering etc. The reduction of materials such as stone...
|
Capacity : 616 CUM/ Day |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 53.72 |
|
Break Even Point (BEP): 52.87 |
TCI : - |
|
Cost of Project : 0 |
Lime bonded fly ash bricks are the product of thermal power waste base products. There is no sophisticated machinery used in this production. There is...
|
Capacity : 20000 Nos. Bricks/Day |
Plant and Machinery cost: Rs. 12 Lakhs |
|
Working Capital : Rs. 1 Crore |
Rate of Return (ROR): 25.78 |
|
Break Even Point (BEP): 44.16 |
TCI : - |
|
Cost of Project : 0 |
There are different kinds of fasteners available in the mechanical workshop. Fasteners can be made by batch manual process and also by computerized au...
|
Capacity : 2.00 MT /Day |
Plant and Machinery cost: Rs. 22.00 Lakhs |
|
Working Capital : Rs. 372 Lakhs |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 23.00 |
TCI : Rs. 440 Lakhs |
|
Cost of Project : 0 |