Please choose a project below related to this category.
Coal tar pitch is the residue from the processing of coal tar. Since pitch constituents over 50% of crude tar, its utilization has a major effect on t...
|
Capacity : 7500 MT/Annum |
Plant and Machinery cost: 143 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 340 Lakhs |
|
Cost of Project : 0 |
Stainless Steel tubes are widely used in the dairy & food processing industries, heat exchangers, evaporators, cooling units, stock lives and condens...
|
Capacity : 600 MT/Annum |
Plant and Machinery cost: 101 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 282 Lakhs |
|
Cost of Project : 0 |
Flexible cartons were firstly developed by the Thomson and Narris Company and the first regular slotted style containers were the products of the Robe...
|
Capacity : 5000 Nos. of Flexible Cartons, 3600 Mtrs. of stickers Labels, 200 Kg. of Aluminium Foils Rolls / Day |
Plant and Machinery cost: 77 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 330 Lakhs |
|
Cost of Project : 0 |
Iron powder is used to produce particles in desired range for use in powder metallurgy and metallic pigments. Powder iron made electrolytically makes...
|
Capacity : 2 MT / Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 176 Lakhs |
|
Cost of Project : 0 |
Steel is said to be the back bone of any national economy. In India SAIL units in public sector and TISCO in private sector are the integrated steel p...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 275 Lakhs |
|
Cost of Project : 0 |
Steel is generally produced by removing impurities from pig iron in a basic oxygen furnace or an electric furnace. Steel products are broadly divid...
|
Capacity : 50400 MT/Annum |
Plant and Machinery cost: 2815 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 3947 Lakhs |
|
Cost of Project : 0 |
The wax crayons are used for outlining and shading by the artist for drawing. Two types of crayons are produced in India chalk crayons and marking cr...
|
Capacity : 7200 Dozens / Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 50 Lakhs |
|
Cost of Project : 0 |
Steel is the most widely used materials in a large variety of applications. Steel is one of the most recyclable material available-40% produced in th...
|
Capacity : 1785000 MT / Annum |
Plant and Machinery cost: 836 Crores |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 1124 Crores |
|
Cost of Project : 0 |
Silicone is the material on which some fluids are based. Usually, a non-mineral type oil is used in hydraulic brake equipments. It has applications...
|
Capacity : 1 MT / Day |
Plant and Machinery cost: 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.70 |
|
Break Even Point (BEP): 33.32 |
TCI : 2 Crores |
|
Cost of Project : 0 |
Calcium always occurs in the combined state. The most important naturally occurring compounds of calcium are calcium sulphate in mineral anhydrite an...
|
Capacity : 60,000 MT / A (Gypsum Powder), 3000 Thousand Sq. MT/A (Gypsum Board),600 Thousands Sq. MT/A (PVC Laminated Ceiling Tiles) |
Plant and Machinery cost: 840 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 2352 Lakhs |
|
Cost of Project : 0 |
Pipe fittings are used to connect pieces of pipe made of different materials viz. connecting galvanized to copper or cast-iron drain pipe to transits...
|
Capacity : 1500 MT /Annum |
Plant and Machinery cost: 101 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 280 Lakhs |
|
Cost of Project : 0 |
Cement is used to designate many different kinds of substances that are used as binders. After the 19th century, there were certain process improveme...
|
Capacity : 60,00,000 MT/Annum Portland Cement |
Plant and Machinery cost: Rs. 121 Crores |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : Rs. 261 Crores |
|
Cost of Project : 2610000000 |