Please choose a project below related to this category.
PRODUCT PROFILE Liquefied Petroleum Gas is a Propane/Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
PRODUCT PROFILE Sand is a naturally occurring granular material composed of finely divided rock and mineral particles. The composition of sand is hig...
|
Capacity : 720000MT/Annum |
Plant and Machinery cost: 595 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of the project: 1066 Lakhs |
|
Cost of Project : 106600000 |
PRODUCT PROFILE Concrete is a composite construction material composed primarily of aggregate, cement and water. Concrete is widely used for making a...
|
Capacity : 2400000 NO.s Concrete blocks /Annum, 49000 Cubic metre Ready mix concrete/Annum, |
Plant and Machinery cost: 1068 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of project: 1477 Lakhs |
|
Cost of Project : 147700000 |
Sand is generally mixed with cement and water form concrete. These sand particles should be hard and inert with respect to cement continuous usages of...
|
Capacity : 240000 MT/Annum |
Plant and Machinery cost: 178 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 460 Lakhs |
|
Cost of Project : 46000000 |
The tile is a manufactured piece of hard wearing material such as ceramic, stone, metal, or even glass. Tiles are generally used for covering roofs, f...
|
Capacity : 120000 Sq. Mt/Annum Wall Tiles & 90000 Sq. Mt/Annum Floor Tiles |
Plant and Machinery cost: 542 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 1020 Lakhs |
|
Cost of Project : 102000000 |
The manufacture of standard commercial graphite as generally practiced in industry differs greatly from that of metals since graphite has no distinct...
|
Capacity : High Grade Pitch 35400 MT/Annum |
Plant and Machinery cost: 875 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 1447 Lakhs |
|
Cost of Project : 144700000 |
Coal tar is a brown or black liquid of high viscosity, which smells of naphthalene and aromatic hydro carbons. Coal tar is among the byproducts when c...
|
Capacity : - |
Plant and Machinery cost: 1531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : 3068 Lakhs |
|
Cost of Project : 306800000 |
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67 to 72% Fe an...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |
A safari park, sometimes known as a wildlife park is a zoo like commercial tourist attraction where visitors’ car drive in their own vehicles or ride...
|
Capacity : Visitors 6000 Nos./Day |
Plant and Machinery cost: 1099 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 49486 Lakhs |
|
Cost of Project : 0 |
Steel is said to be the backbone of any national economy, because most of industries greatly depend on the use of iron and steel for structural purpos...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 392 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 675 Lakhs |
|
Cost of Project : 0 |
Fly Ash bricks are alternative to burnt clay bricks in the construction sector in India. Fly ash bricks are an environment friendly cost saving buildi...
|
Capacity : 12000000 Nos./Annum |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 409 Lakhs |
|
Cost of Project : 0 |
Butt welded steel pipe fittings are extensively used in a piping system to change direction or function which is mechanically used to the system. The...
|
Capacity : 1500 MT Steel Fittings & Flanges/Annum |
Plant and Machinery cost: 705 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 1178 Lakhs |
|
Cost of Project : 0 |