Please choose a project below related to this category.
Aluminium is second most plentiful metallic element on earth become an economic competitor in engineering applications. The aluminium industry growth...
|
Capacity : 144000 MT/Annum |
Plant and Machinery cost: 395 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 1147 Lakhs |
|
Cost of Project : 114700000 |
Hot rolling, also called hot working, is a metallurgical process of in which large pieces of metal such as slabs or billets are deformed between rolle...
|
Capacity : 10,00,000 MT / Annum |
Plant and Machinery cost: 79 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 197 Crores |
|
Cost of Project : 0 |
Thermo Mechanical Treatment (TMT) is a term used to describe a variety of process combining controlled thermal and deformation treatment to obtain syn...
|
Capacity : 50,000 MT/Annum |
Plant and Machinery cost: 310 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 1189 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals due to their abundance durability versatility and low costs are most useful metallic material k...
|
Capacity : 1,00,000 MT / Annum |
Plant and Machinery cost: 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 2808 Lakhs |
|
Cost of Project : 0 |
The alcohol based chemical industry is worth around Rs. 5,000 crores in terms of total investment or (US$ 1.15 billion) and contributes Rs. 500 crores...
|
Capacity : 1000 Ltrs./Day |
Plant and Machinery cost: 17 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 58.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 150 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 15000 Broilers, 4 Lakhs Eggs, 500 Birds/Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 64.00 |
TCI : 16 lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 1000 MT/Annum |
Plant and Machinery cost: Rs. 194 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 598 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 4 MT/Day |
Plant and Machinery cost: Rs. 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 167 Lakhs |
|
Cost of Project : 0 |
The term cement is used to designate many different kinds of substances that are used as binders. The term cements as used henceforth will be confined...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Ready mix concrete is a modern trend of introduction in the Asian countries. It is new concept of use concrete in the construction area. Ready mix has...
|
Capacity : 8000 No. Concrete Block / Day, 165 Cubic Meter Ready Mix Concrete / Day |
Plant and Machinery cost: 5 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 12 Crores |
|
Cost of Project : 0 |
Lubricating oil is generally used to reduce wear of one or both surfaces in close proximity, and moving relative to each another, by interposing a sub...
|
Capacity : 1000 Ltrs. / Day |
Plant and Machinery cost: 16 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 59.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 150 Lakhs |
|
Cost of Project : 0 |
In ancient India, there was large use of water in the Tapovana, and different Ashrams in the forests. Elephanta caves in the Maharashtra can be consi...
|
Capacity : 1000 visitors / Day |
Plant and Machinery cost: 84 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 362 Lakhs |
|
Cost of Project : 0 |