Please choose a project below related to this category.
Bricks are the most common building materials. It is a mixture of clay and sand and small quantities of limes Bricks and classified accordingly to th...
|
Capacity : 20000 Nos. /Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.40 |
|
Break Even Point (BEP): 42.26 |
TCI : 110 Lakhs |
|
Cost of Project : 0 |
Plaster of Paris or simply plaster, is a type of building material based on calcium sulphate hemihydrate. It is created by heating. Gypsum to about 1...
|
Capacity : 50 MT / Day |
Plant and Machinery cost: 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 3 Crores |
|
Cost of Project : 0 |
The purpose of a transmission line tower is to support conductors carrying electrical power and one or two ground wires at suitable distances above t...
|
Capacity : 24,000 MT /Year |
Plant and Machinery cost: 149 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 716 Lakhs |
|
Cost of Project : 0 |
In the most general sense of the word, cement is a binder, a substance which sets and hardens independently, and can bind other materials together. Th...
|
Capacity : 4000 Bag / Day |
Plant and Machinery cost: 3 Crore |
|
Working Capital : - |
Rate of Return (ROR): 59.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 10 Crore |
|
Cost of Project : 0 |
Sponge iron is the product created when iron ore is reduced to metallic iron, usually with some kind of carbon (charcoal, etc), at temperatures below...
|
Capacity : 135000 MT / Annum |
Plant and Machinery cost: 7175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 8923 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs. 2 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Rs. 13 crores |
|
Cost of Project : 0 |
India is a booming hospitality market, yet it has minuscule contribution to the timeshare business model existing worldwide. USA alone comprises two-...
|
Capacity : 30 Room |
Plant and Machinery cost: 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 1239 Lakhs |
|
Cost of Project : 0 |
For vacuum distillation of crude coal tar, the crude coal tar is produced from coke ovens of steel plant, 50% of this crude coal tar is pitch. The cr...
|
Capacity : 7500 MT / Annum |
Plant and Machinery cost: Rs. 137 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 320 Lakhs |
|
Cost of Project : 0 |
Teflon, a perfluorinated straight-chain high polymer is made by polymerizing the tetrafluoroethylene. It is a high crystalline polymer and goes throu...
|
Capacity : 100 Kg./Day |
Plant and Machinery cost: 13 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 92 Lakh |
|
Cost of Project : 0 |
Lime is manufactured from lime stone. Lime is mainly used for manufacture of hydrated lime. Hydrated lime is a dry powder obtained by treating quick...
|
Capacity : 600 MT/Day |
Plant and Machinery cost: 131 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 548 Lakhs |
|
Cost of Project : 0 |
Fly Ash required for the production of Fly Ash Bricks, the raw Fly Ash is subjected to Triboelectrostatic Beneficiation process making use of separat...
|
Capacity : 12,000 Nos. / Day |
Plant and Machinery cost: 260 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 655 Lakhs |
|
Cost of Project : 0 |
The growth of the tile industry has shown steep fluctuations. The great upsurge of developmental activities all over the country during the second an...
|
Capacity : 2,00,000 Nos. / Day |
Plant and Machinery cost: 36 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 151 Lakh |
|
Cost of Project : 0 |