Please choose a project below related to this category.
PRODUCT PROFILE The maize also called "Corn or Indian Corn" is widely cultivated in India; Maize ranks high among the four or five principal cereal c...
|
Capacity : - |
Plant and Machinery cost: 3175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 7310 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Potato starch is starch extracted from potatoes. The cells of the root tubers of the potato plant contain starch grains (leucoplasts)...
|
Capacity : 45000 MT/Annum |
Plant and Machinery cost: 654 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of the project: 1618 Lakhs |
|
Cost of Project : 161800000 |
PRODUCT PROFILE Rice bran is the most important source of edible oil among the unconventional sources. Rice bran is the brown coating around the whit...
|
Capacity : 5100 MT/Annum, Refined rice bran oil, 24900MT/Annum, De oiled rice bran oil cake (byproduct) |
Plant and Machinery cost: 757 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of project: 1243 Lakhs |
|
Cost of Project : 124300000 |
Profile Cancer is a term used for diseases in which abnormal cells divide without control and are able to invade other tissues. Cancer cells can spre...
|
Capacity : 50 Bedded Hospital |
Plant and Machinery cost: 5010 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 6988 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Rice flake is the husked rice which is flattened into flat light dry flakes. These flakes of rice swell when added to liquid, whether...
|
Capacity : 4 MT/day |
Plant and Machinery cost: 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 146 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Concrete is a composite construction material composed primarily of aggregate, cement and water. Concrete is widely used for making a...
|
Capacity : 2400000 NO.s Concrete blocks /Annum, 49000 Cubic metre Ready mix concrete/Annum, |
Plant and Machinery cost: 1068 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of project: 1477 Lakhs |
|
Cost of Project : 147700000 |
Rice milling industry generates a lot of rice husk during milling of paddy which comes from the fields. This rice husk is mostly used as a fuel in the...
|
Capacity : 90,000 Kg /Annum |
Plant and Machinery cost: 285 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 524 Lakhs |
|
Cost of Project : 52400000 |
A pressure-sensitive adhesive is a material that holds two surfaces together solely by surface contact, which is achieved by slight initial external p...
|
Capacity : 300000 Kgs./Annum |
Plant and Machinery cost: 67 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 344 Lakhs |
|
Cost of Project : 0 |
A pressure-sensitive adhesive is a material that holds two surfaces together solely by surface contact, which is achieved by slight initial external p...
|
Capacity : 300000 Kgs./Annum |
Plant and Machinery cost: 67 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 3.00 |
TCI : 344 Lakhs |
|
Cost of Project : 0 |
In India dairying has been practiced as a rural cottage industry since the remote past, semi commercial dairying started with the establishment of mil...
|
Capacity : - |
Plant and Machinery cost: 12 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 160 Lakhs |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by glucosidric linkages. It conforms to the molecular formula. W...
|
Capacity : - |
Plant and Machinery cost: 1477 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : 2425 Lakhs |
|
Cost of Project : 242500000 |
Feeds are used as edible materials, which are consumed by cattle, poultry and contribute energy and/or nutrients to the cattle or poultry diet. Feeds...
|
Capacity : - |
Plant and Machinery cost: 309 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 689 Lakhs |
|
Cost of Project : 0 |