Please choose a project below related to this category.
Profile Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commerc...
|
Capacity : - |
Plant and Machinery cost: 2531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of project : 4639 Lakhs |
|
Cost of Project : 463900000 |
Profile Rice husk ash is a unique source of high grade amorphous silica. The silica present in rice husk, being of biogenic origin, is inherently amo...
|
Capacity : 300 Kg/day |
Plant and Machinery cost: 246 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 557 Lakhs |
|
Cost of Project : 0 |
Profile A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines s...
|
Capacity : 100 Students/Annum, 500 Bedded Hospital |
Plant and Machinery cost: 1729 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 4824 Lakhs |
|
Cost of Project : 0 |
Profile A hospital is a health care institution providing patient treatment by specialized staff and equipment. Hospitals often, but not always, prov...
|
Capacity : 105 Bedded Hospital |
Plant and Machinery cost: 476 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 49.00 |
TCI : 1099 Lakhs |
|
Cost of Project : 0 |
Profile Resins are translucent and viscous film forming material widely used for production of paints and coatings. It binds the pigment particles to...
|
Capacity : 10 MT/day |
Plant and Machinery cost: 178 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 1318 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Acrylonitrile butadiene styrene resins (ABS) are the largest-volume engineering thermoplastic resin. It is a copolymer made by polyme...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
PRODUCT PROFILE The maize also called "Corn or Indian Corn" is widely cultivated in India; Maize ranks high among the four or five principal cereal c...
|
Capacity : - |
Plant and Machinery cost: 3175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 7310 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Potato starch is starch extracted from potatoes. The cells of the root tubers of the potato plant contain starch grains (leucoplasts)...
|
Capacity : 45000 MT/Annum |
Plant and Machinery cost: 654 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of the project: 1618 Lakhs |
|
Cost of Project : 161800000 |
PRODUCT PROFILE Rice bran is the most important source of edible oil among the unconventional sources. Rice bran is the brown coating around the whit...
|
Capacity : 5100 MT/Annum, Refined rice bran oil, 24900MT/Annum, De oiled rice bran oil cake (byproduct) |
Plant and Machinery cost: 757 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of project: 1243 Lakhs |
|
Cost of Project : 124300000 |
Profile Cancer is a term used for diseases in which abnormal cells divide without control and are able to invade other tissues. Cancer cells can spre...
|
Capacity : 50 Bedded Hospital |
Plant and Machinery cost: 5010 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 6988 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Rice flake is the husked rice which is flattened into flat light dry flakes. These flakes of rice swell when added to liquid, whether...
|
Capacity : 4 MT/day |
Plant and Machinery cost: 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 146 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Concrete is a composite construction material composed primarily of aggregate, cement and water. Concrete is widely used for making a...
|
Capacity : 2400000 NO.s Concrete blocks /Annum, 49000 Cubic metre Ready mix concrete/Annum, |
Plant and Machinery cost: 1068 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of project: 1477 Lakhs |
|
Cost of Project : 147700000 |